<< All versions

Skill v0.4.0

currentLLM-judged scan90/100
23ag1/completely/plan
──Details
PublishedOctober 22, 2026 at 09:33 AM
Content Hashsha256:865b48bdae39c160...
Git SHAd5867ab6bf41
──Files
Files (1 file, 3.2 KB)
SKILL.md3.2 KBactive
SKILL.md · 41 lines · 3.2 KB

name: completely:plan description: Plan a phase or feature DIRECTLY into Beads — no PLAN.md, no markdown bridge. Runs GSD-style socratic discovery + decomposition + a goal-backward self-check, then emits a structured plan that cmpl plan-apply materializes as a Beads epic + worker-contract tasks + dependency waves + human checkpoints. One source of truth from the first planning act. Use to turn an idea or phase into ready Beads work. version: 0.4.0 user-invocable: true argument-hint: "[phase or feature]"


Plan into Beads directly. Do NOT write a PLAN.md / STATE.md — the plan lives in Beads.

Method (GSD methodology, Beads-first)

  1. Discover (socratic). Ask clarifying questions ONE at a time until the goal is unambiguous;

offer 2–3 approaches with trade-offs; confirm scope. If a spec is already frozen, read it instead.

  1. Decompose into atomic tasks (2–5 min each). Each task MUST carry the worker-contract:

title (imperative), acceptance (observable/testable), design (approach/why), write_zone (exact files/globs), verify (the proof command), deps (other task keys). ~2–3 tasks per unit; split if a unit exceeds ~5 tasks or ~10 files (context budget). Also fill the context fields — the engine consumes them directly:

  • read_context — the exact files/interfaces the worker must READ first but won't edit

(contracts, schemas, neighbouring patterns). Injected verbatim into the worker's dispatch header, so a fresh context reads exactly this instead of guessing or scanning the tree.

  • must_haves — the goal-backward checklist {truths, artifacts, key_links} the default-FAIL

evaluator grades against at VERIFY. No must_haves ⇒ the evaluator has only the acceptance line.

  • requirements — requirement IDs this task covers (traceability), when the phase has them.
  1. Checkpoints. Where a human must verify/decide, add {key,title,after,how}; make downstream

tasks depend on cp:<key> so the wave blocks until the human closes it.

  1. Self-check (goal-backward, GSD plan-checker's 7 dimensions). Before applying, verify:

requirement coverage · task completeness (acceptance+verify present) · dependencies acyclic · artifacts wired together (not isolated) · scope within context budget · acceptance is user-observable · honors the user's frozen decisions. Fix gaps — don't apply a plan that won't reach the goal.

  1. Apply. Emit the plan as JSON and pipe it to the materializer:

cat <<'PLAN' | cmpl plan-apply … PLAN. It creates the epic + tasks + deps + checkpoints + a bd swarm (native waves). Then show bd ready and bd swarm status.

Plan JSON schema

{ "epic": "...", "tasks": [ {"key","title","acceptance","design","write_zone":[...],"verify","deps":[...],"labels":[...],"read_context":[...],"must_haves":{"truths":[...],"artifacts":[...],"key_links":[...]},"requirements":[...]} ], "checkpoints": [ {"key","title","after","how"} ] }

Rules

  • Beads is the only artifact. Never persist a markdown plan.
  • Every task lint-clean (acceptance + design + write_zone) — plan-apply + cmpl lint enforce it.
  • One question at a time; respect a frozen spec; don't over-interrogate.
All versions