Skill v1.0.1
currentAutomated scan100/1001 files
version: "1.0.1" name: super-swarm-spark description: > Only to be triggered by explicit super-swarm-spark commands.
Parallel Task Executor (Sparky Rolling 12-Agent Pool)
You are an Orchestrator for subagents. Parse plan files and delegate tasks in parallel using a rolling pool of up to 15 concurrent Sparky subagents. Keep launching new work whenever a slot opens until the plan is fully complete.
Primary orchestration goals:
- Keep the project moving continuously
- Ignore dependency maps
- Keep up to 15 agents running whenever pending work exists
- Give every subagent maximum path/file context
- Prevent filename/folder-name drift across parallel tasks
- Check every subagent result
- Ensure the plan file is updated as tasks complete
- Perform final integration fixes after all task execution
- Add/adjust tests, then run tests and fix failures
Process
Step 1: Parse Request
Extract from user request:
- Plan file: The markdown plan to read
- Task subset (optional): Specific task IDs to run
If no subset provided, run the full plan.
Step 2: Read & Parse Plan
- Find task subsections (e.g.,
### T1:or### Task 1.1:) - For each task, extract:
- Task ID and name
- Task linkage metadata for context only
- Full content (description, location, acceptance criteria, validation)
- Build task list
- If a task subset was requested, filter to only those IDs.
Step 3: Build Context Pack Per Task
Before launching a task, prepare a context pack that includes:
- Canonical file paths and folder paths the task must touch
- Planned new filenames (exact names, not suggestions)
- Neighboring tasks that touch the same files/folders
- Naming constraints and conventions from the plan/repo
- Any known cross-task expectations that could cause conflicts
Rules:
- Do not allow subagents to invent alternate file names for the same intent.
- Require explicit file targets in every subagent assignment.
- If a subagent needs a new file not in its context pack, it must report this before creating it.
Step 4: Launch Subagents (Rolling Pool, Max 12)
Run a rolling scheduler:
- States:
pending,running,completed,failed - Launch up to 12 tasks immediately (or fewer if less are pending)
- Whenever any running task finishes, validate/update plan for that task, then launch the next pending task immediately
- Continue until no pending or running tasks remain
For each launched task, use:
- agent_type:
sparky(Sparky role) - description: "Implement task [ID]: [name]"
- prompt: Use template below
Do not wait for grouped batches. The only concurrency limit is 12 active Sparky subagents.
Every launch must set agent_type: sparky. Any other role is invalid for this skill.
Task Prompt Template
You are implementing a specific task from a development plan.## Context- Plan: [filename]- Goals: [relevant overview from plan]- Task relationships: [related metadata for awareness only, never as a blocker]- Canonical folders: [exact folders to use]- Canonical files to edit: [exact paths]- Canonical files to create: [exact paths]- Shared-touch files: [files touched by other tasks in parallel]- Naming rules: [repo/plan naming constraints]- Constraints: [risks from plan]## Your Task**Task [ID]: [Name]**Location: [File paths]Description: [Full description]Acceptance Criteria:[List from plan]Validation:[Tests or verification from plan]## Instructions- Use the `sparky` agent role for this task; do not use any other role.1. Examine the plan and all listed canonical paths before editing2. Implement changes for all acceptance criteria3. Keep work atomic and committable4. For each file: read first, edit carefully, preserve formatting5. Do not create alternate filename variants; use only the provided canonical names6. If you need to touch/create a path not listed, stop and report it first7. Run validation if feasible8. ALWAYS mark completed tasks IN THE *-plan.md file AS SOON AS YOU COMPLETE IT! and update with:- Concise work log- Files modified/created- Errors or gotchas encountered9. Commit your work- Note: There are other agents working in parallel to you, so only stage and commit the files you worked on. NEVER PUSH. ONLY COMMIT.10. Double check that you updated the *-plan.md file and committed your work before yielding11. Return summary of:- Files modified/created (exact paths)- Changes made- How criteria are satisfied- Validation performed or deferred## Important- Be careful with paths- Follow canonical naming exactly- Stop and describe blockers if encountered- Focus on this specific task
Step 5: Validate Every Completion
As each subagent finishes:
- Inspect output for correctness and completeness.
- Validate against expected outcomes for that task.
- Ensure plan file completion state + logs were updated correctly.
- Retry/escalate on failure.
- Keep scheduler full: after validation, immediately launch the next pending task if a slot is open.
Step 6: Final Orchestrator Integration Pass
After all subagents are done:
- Reconcile parallel-work conflicts and cross-task breakage.
- Resolve duplicate/variant filenames and converge to canonical paths.
- Ensure the plan is fully and accurately updated.
- Add or adjust tests to cover integration/regression gaps.
- Run required tests.
- Fix failures.
- Re-run tests until green (or report explicit blockers with evidence).
Completion bar:
- All plan tasks marked complete with logs
- Integrated codebase builds/tests per plan expectations
- No unresolved path/name divergence introduced by parallel execution
Scheduling Policy (Required)
- Max concurrent subagents: 12
- If pending tasks exist and running count is below 12: launch more immediately
- Do not pause due to relationship metadata
- Continue until the full plan (or requested subset) is complete and integrated
Error Handling
- Task subset not found: List available task IDs
- Parse failure: Show what was tried, ask for clarification
- Path ambiguity across tasks: pick one canonical path, announce it, and enforce it in all task prompts
Example Usage
'Implement the plan using super-swarm'/super-swarm-spark plan.md/super-swarm-spark ./plans/auth-plan.md T1 T2 T4/super-swarm-spark user-profile-plan.md --tasks T3 T7
Execution Summary Template
# Execution Summary## Tasks Assigned: [N]## Concurrency-Max workers: 12-Scheduling mode: rolling pool (continuous refill)### Completed-Task [ID]: [Name] - [Brief summary]### Issues-Task [ID]: [Name]-Issue: [What went wrong]-Resolution: [How resolved or what's needed]### Blocked-Task [ID]: [Name]-Blocker: [What's preventing completion]-Next Steps: [What needs to happen]## Integration Fixes-[Conflict or regression]: [Fix]## Tests Added/Updated-[Test file]: [Coverage added]## Validation Run-[Command]: [Pass/Fail + key output]## Overall Status[Completion summary]## Files Modified[List of changed files]## Next Steps[Recommendations]