amanbh997/skills-architects/country-usa
Claude Code and agent skill by amanbh997/skills-architects
- community
Checking that the SKILL.md file is still in the repository.
United States architectural code and regulatory reference. Covers the International Code Council (ICC) family of model codes adopted across most US jurisdictions (IBC 2024, IRC 2024, IECC 2024, IFC 2024, IMC 2024, IPC 2024, IFGC 2024, IEBC 2024), the National Fire Protection Association suite (NFPA 101 Life Safety Code 2024, NFPA 70 NEC 2023, NFPA 13 sprinklers, NFPA 72 detection, NFPA 285 wall assemblies, NFPA 5000), structural standards (ASCE 7-22 loads, ASCE 41-23 existing, ACI 318-19 concrete, AISC 360-22 steel, ANSI/AWC NDS 2024 wood, TMS 402/602 masonry), accessibility (ADA 2010 Standards, ANSI A117.1-2017, Fair Housing Act + HUD design manual, ABA Standards), energy (ASHRAE 90.1-2022, ASHRAE 62.1-2022, ASHRAE 55-2020, ENERGY STAR), and the major state amendments (California Title 24 Parts 1-12 with Part 6 Energy and Part 11 CalGreen, NYC Building Code 2022 + 1968 grandfathered + 2014 commercial, Florida Building Code 2023, Texas through state-by-jurisdiction adoption, Chicago Construction Codes, Massachusetts 9th Edition, Washington State Energy Code) plus zoning/planning realities (R/C/M zones, FAR, setback, height bonuses, LEED programs, AHJ -- Authority Having Jurisdiction).
Install
npx vskill@latest install amanbh997/skills-architects/country-usaSKILL.md
Country: United States of America
Architectural code and regulatory reference for projects within any US state, territory, or D.C. Activate this skill on any US city/state reference, USD currency, square feet / imperial units, mention of "IBC"/"IRC"/"IECC"/"NFPA"/"ASCE 7"/"ADA"/"Title 24"/"CalGreen"/"NYC BC", state building department/AHJ references, or LEED/ENERGY STAR.
1. Regulatory Hierarchy
The US operates as Archetype B (National Model + State/Local Adoption) with significant local variation. There is no federal building code; the Authority Having Jurisdiction (AHJ) -- which may be the city, county, state, or special district -- decides which model code edition is in force and with what amendments.
1.1 Authority Stack
1.2 Code Adoption Status (Selected States, 2024-2025)
| State | IBC Adopted | IECC Adopted | Notable Amendments | |
|---|---|---|---|---|
| California | 2021 (with CA Title 24) | Title 24 Part 6 (own energy code) | Title 24 Parts 1-12; CALGreen Part 11; Tier 1/2 reach codes; Strong fire (WUI); seismic Cat C+ | |
| Texas | 2018-2021 varies by city (no statewide adoption) | 2015-2021 varies; mandatory through DSHS/SECO | Local amendments significant; Houston, Austin, Dallas distinct | |
| Florida | FBC 2023 (own custom code; IBC 2021-derived) | FBC Energy Conservation 2023 | High-Velocity Hurricane Zone (HVHZ) for Miami-Dade/Broward; wind speeds 175 mph 0.4% | |
| New York | NYS UBC 2020 + NYC has separate (NYC BC 2022 + 1968 grandfather + 2014 commercial) | NYS Energy Code 2020 (90.1-2019 + adds) | NYC has own zoning (Zoning Resolution 1961+amendments), NYC plumbing, NYC mechanical, NYC fuel gas | |
| Illinois | No statewide; Chicago has Chicago Construction Codes 2019 (IBC-based) | -- | Chicago strict | |
| Massachusetts | 9th Edition (2023, IBC 2021-derived) + amendments | Stretch Energy Code 2023 | Mass MAAB Accessibility ahead of ADA | |
| Pennsylvania | UCC IBC 2018 (transitioning to 2021) | IECC 2018 (transitioning) | -- | |
| Washington | WSBC 2021 (IBC 2021-derived) | WSEC 2021 (own, most stringent in US) | Seattle Energy Code stricter still | |
| Oregon | OSSC 2022 (IBC 2021-derived) | Oregon Energy Code | -- | |
| Colorado | No statewide; municipal | -- | Denver/Boulder strict | |
| Arizona | No statewide; municipal | -- | -- | |
| Georgia | IBC 2018 statewide | IECC 2015 (lags) | -- | |
| Michigan | MBC 2015 (transitioning 2021) | MUEC 2015 | -- | |
| Ohio | OBC 2017 (transitioning 2024) | -- | -- | |
| North Carolina | NCBC 2018 + Local | NCECC | -- | |
| Virginia | USBC 2018 (transitioning 2021) | VUSBC | -- |
ALWAYS verify current adoption status with the specific AHJ. ICC publishes a state-by-state matrix, but adoption can lag by years and local amendments significantly modify.
2. IBC 2024 Core Requirements
2.1 Occupancy Groups (IBC 2024 Ch. 3)
| Group | Description | Subdivisions | |
|---|---|---|---|
| A | Assembly | A-1 (theatres, concert halls), A-2 (food/drink est), A-3 (worship, lectures, exhibits), A-4 (indoor sport), A-5 (outdoor) | |
| B | Business | (offices, professional services, banks, post offices, etc.) | |
| E | Educational | (through 12th grade -- university is B or A) | |
| F | Factory/Industrial | F-1 (moderate hazard), F-2 (low hazard) | |
| H | High Hazard | H-1 (detonation), H-2 (deflagration/accelerated burning), H-3 (oxidizers, combustibles), H-4 (toxic), H-5 (semiconductor fab) | |
| I | Institutional | I-1 (supervised personal care), I-2 (hospitals/nursing), I-3 (detention -- I-3.1-5 by escape ability), I-4 (daycare) | |
| M | Mercantile | (retail, shopping centers, etc.) | |
| R | Residential | R-1 (transient -- hotel/motel), R-2 (multi-family >2 dwelling units, not transient), R-3 (1-2 family, not classified as R-1/2/4), R-4 (small assisted living 6-16 residents) | |
| S | Storage | S-1 (moderate hazard), S-2 (low hazard) | |
| U | Utility / misc | (sheds, fences, retaining walls, agricultural buildings) |
2.2 Construction Types (IBC 2024 Table 601)
| Type | Description | Frame Fire Rating | Ext. Bearing Walls | Floor | Roof | |
|---|---|---|---|---|---|---|
| IA | Non-combustible fire-resistive | 3 hr | 3 hr | 2 hr | 1.5 hr | |
| IB | Non-combustible fire-resistive | 2 hr | 2 hr | 2 hr | 1 hr | |
| IIA | Non-combustible protected | 1 hr | 1 hr | 1 hr | 1 hr | |
| IIB | Non-combustible unprotected | 0 hr | 0 hr | 0 hr | 0 hr | |
| IIIA | Exterior non-combustible bearing + protected combustible | 1 hr | 2 hr | 1 hr | 1 hr | |
| IIIB | Same as IIIA but unprotected | 0 hr | 2 hr | 0 hr | 0 hr | |
| IV-HT | Heavy Timber (legacy, large members) | HT | 2 hr | HT | HT | |
| IV-A | Mass Timber (new in IBC 2021) up to 18 storeys | 3 hr fully encapsulated | 3 hr | 2 hr | 1.5 hr | |
| IV-B | Mass Timber up to 12 storeys, partial exposure | 2 hr partially encapsulated | 2 hr | 2 hr | 1 hr | |
| IV-C | Mass Timber up to 9 storeys, fully exposed | 2 hr exposed | 2 hr | 2 hr | 1 hr | |
| VA | Protected combustible (e.g., light wood frame) | 1 hr | 1 hr | 1 hr | 1 hr | |
| VB | Unprotected combustible | 0 hr | 0 hr | 0 hr | 0 hr |
2.3 Height & Area (IBC Table 504.3, 504.4, 506.2)
A critical IBC table: maximum building height in storeys, height in feet, and area per storey by Occupancy Group + Construction Type. Sprinklers permit increases. Frontage area increase per Section 506.3. The table is too large to fully reproduce; key benchmarks:
| Combination | Max Storeys (sprinklered) | Max Ht (ft) | Max Area/Storey (sf) | |
|---|---|---|---|---|
| B (office) Type IA | 12 (unlimited area) | unlimited | unlimited | |
| B Type IB | 12 | 180 | unlimited | |
| B Type IIA | 6 | 85 | 92,500 | |
| B Type IIB | 5 | 75 | 69,000 | |
| B Type IIIA | 6 | 85 | 57,500 | |
| R-2 Type IIA | 5 | 75 | 36,000 | |
| R-2 Type IV-A (mass timber) | 18 | 270 | 108,000 | |
| R-2 Type IV-B | 12 | 180 | 72,000 | |
| R-2 Type IV-C | 8 | 85 | 36,000 | |
| M (mercantile) Type IIB | 5 | 75 | 87,500 |
2.4 High-Rise (IBC 2024 Section 403)
- Definition: a building > 75 ft (22.86 m) above lowest level of fire department vehicle access
- Requires: sprinklers throughout (NFPA 13), Class I standpipes, smoke control for high-rise lobbies/elevator hoistways, fire command centre, emergency power, voice/alarm communication system per NFPA 72, smokeproof enclosures for stair shafts (in some configurations), pressurized stairwells (variable per smoke management strategy)
- Bonus: with full sprinklers, 1-hour reduction permitted for many fire-resistance ratings
2.5 Egress (IBC 2024 Ch. 10)
| Parameter | Value | |
|---|---|---|
| Min corridor width (>=50 occupants) | 44 in (1118 mm) | |
| Min corridor width (<50 occupants) | 36 in (914 mm) | |
| Min stair width (occupant load > 50) | 44 in (1118 mm) | |
| Stair capacity unsprinklered | 0.3 in/person (7.62 mm) | |
| Stair capacity sprinklered | 0.2 in/person (5.08 mm) | |
| Min door clear width | 32 in (813 mm) | |
| Max travel distance (B sprinklered) | 300 ft (91.4 m) | |
| Max travel distance (B unsprinklered) | 200 ft (60.96 m) | |
| Max travel distance (I-2 sprinklered) | 200 ft (60.96 m) | |
| Max common path of travel (B sprinklered) | 100 ft (30.48 m) | |
| Max common path of travel (B unsprinklered) | 75 ft (22.86 m) | |
| Max dead-end (B sprinklered) | 50 ft (15.24 m) | |
| Max dead-end (R sprinklered) | 50 ft |
2.6 Means of Egress -- Number of Exits (IBC Table 1006.3.4)
- Most occupancies: 1 exit access OK if occupant load <= 49 AND common path <= limits AND a single exit on dwelling unit with proper provisions
- 2 exits: 50-500 occupants typical
- 3 exits: 501-1000
- 4 exits: >1000
3. Fire Code
3.1 IFC 2024 + NFPA 101
US uses both IFC (model fire code, ICC) and NFPA 101 Life Safety Code 2024 as supplementary. In some states, NFPA 101 is the primary (e.g., MA, hospitals nationally adopt NFPA 99 + 101). Check AHJ.
3.2 NFPA 13 (Sprinklers)
NFPA 13:2025 (or current adopted) -- the design standard for sprinkler systems. Hazard classes Light, Ordinary 1-2, Extra 1-2. Density-area method.
3.3 NFPA 285 (Wall Assemblies)
The test method for combustible components in non-combustible wall assemblies. Often required for foam-insulated walls of Type I-IV buildings. Post-Grenfell-like incidents in US (Chicago 2010s, Las Vegas) drove tightening.
3.4 Healthcare -- FGI Guidelines
Although not in IBC, the Facility Guidelines Institute (FGI) Guidelines for Design and Construction of Hospitals 2022 is adopted by most state health departments as enforceable for hospital projects. Critical for room sizes, clearances, infection control.
4. Energy Code
4.1 IECC 2024 + ASHRAE 90.1-2022
US uses two parallel energy code regimes:
- IECC 2024 Commercial Provisions OR ASHRAE 90.1-2022 (compliance via choice; ASHRAE permitted by IECC)
- IECC 2024 Residential Provisions for low-rise residential (3 storeys or less)
- States may adopt either; California has own Title 24 Part 6 (stricter than both)
4.2 ASHRAE 169 Climate Zones (US)
8 zones (1-8) + moisture sub-zones (A humid, B dry, C marine). Examples:
| Zone | City | Description | |
|---|---|---|---|
| 1A | Miami | Very Hot Humid | |
| 2A | Houston, Atlanta (margin), Orlando | Hot Humid | |
| 2B | Phoenix, Tucson | Hot Dry | |
| 3A | Memphis, Atlanta | Warm Humid | |
| 3B | Los Angeles, Bakersfield | Warm Dry | |
| 3C | San Francisco | Warm Marine | |
| 4A | Washington DC, Philadelphia, NYC | Mixed Humid | |
| 4B | Albuquerque | Mixed Dry | |
| 4C | Seattle, Portland OR | Mixed Marine | |
| 5A | Chicago, Boston, Detroit | Cool Humid | |
| 5B | Denver | Cool Dry | |
| 6A | Minneapolis | Cold Humid | |
| 7 | International Falls MN, Anchorage | Very Cold | |
| 8 | Fairbanks, Northern Alaska | Subarctic |
4.3 ASHRAE 90.1-2022 -- Indicative U-values (W/m2K)
This is the start of the file. Read the full SKILL.md on GitHub.
Security
- Security scanPassed, 95 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/country-usa/SKILL.md
Popularity
- Repository stars
- 205
- Repository forks
- 43
- 7-day trend score
- 27
Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/amanbh997/skills-architects/country-usa)