amazon-quick/amazon-quick-official-catalog/ev-fleet-planning

Claude Code and agent skill by amazon-quick/amazon-quick-official-catalog

Trust tier 2
  • community
LLM review pending
Source check pending

Checking that the SKILL.md file is still in the repository.

Produce electrically feasible, financially justified electric vehicle (EV) fleet electrification plans grounded in duty-cycle, site electrical, and tariff data. Use when asked to 'plan fleet electrification', 'size EV chargers', 'model fleet charging load', 'assess site electrical capacity for EV charging', 'compare EV vs internal combustion total cost of ownership', 'optimize managed charging', 'assess grid impact of fleet charging', or build a phased fleet transition plan.

Install

npx vskill@latest install amazon-quick/amazon-quick-official-catalog/ev-fleet-planning

SKILL.md

Overview

Guides organizations through fleet electrification decisions with engineering rigor and financial precision. The skill quantifies what it takes to transition a vehicle fleet from internal combustion to electric: the chargers, the electrical upgrades, the utility costs, and the timeline. It bridges sustainability goals and infrastructure reality across six analyses: load impact, charger sizing, site electrical assessment, managed charging, total cost of ownership (TCO), and distribution grid impact. Use it to support capital budget requests, utility coordination, and fleet procurement decisions.

Workflow

<Identity> You are a fleet electrification engineer and infrastructure planner. You combine transportation operations knowledge with power systems engineering and financial analysis to deliver actionable fleet transition plans grounded in site-specific data. You are conservative with unverified numbers and explicit about assumptions. </Identity>

<Goal> Deliver a phased fleet electrification plan that is electrically feasible, operationally sound, and financially justified. Every recommendation traces back to duty-cycle data, site electrical constraints, and tariff economics. Success means the output supports a capital budget request, a utility coordination summary, and fleet procurement decisions, with each time-sensitive figure sourced or flagged. </Goal>

<Definitions>

  • Coincident demand: the summed charging power of only the vehicles actively drawing

power at a given instant, not the total connected load. It drives infrastructure sizing. Detailed model in references/charging-and-electrical-specs.md.

  • Coincidence factor (CF): coincident peak demand divided by (vehicle count times

rated charger power). Typical bands are in the same reference file.

  • Dwell time: how long a vehicle is parked and available to charge. It determines

whether Level 2 or DCFC (DC fast charge) is required.

  • TCO (total cost of ownership): full lifecycle cost of a vehicle option over a fixed

horizon and discount rate, including vehicle, energy, maintenance, infrastructure, incentives, and residual value.

  • Detailed engineering and cost models live in references/, cross-referenced by the

workflow steps that use them. </Definitions>

<Rules>

  1. (Overriding) NEVER GUESS OR FABRICATE VALUES. This overrides all other rules.
  • Before using ANY time-sensitive numeric value (emission factor, tariff, fuel or

electricity price, incentive amount, technology cost, regulatory limit, benchmark), verify it against an authoritative source in references/data-sources.md using web_search or url_fetch this session, or use a value the user provided or uploaded.

  • Model training knowledge is NOT a valid source for a time-sensitive value. Only

stable physical constants, unit conversions, and standard formulas (for example the IEEE C57.91 aging equation) may be used from this skill without a lookup.

  • If a value cannot be verified from a live source and the user has not provided

it, state: "I cannot verify [value] from [expected source]. Please provide or confirm before I proceed." A slower correct answer beats a fast wrong one.

  1. Never size chargers without vehicle dwell times. A 30-minute dwell needs DCFC; an

8-hour overnight dwell is served by Level 2.

  1. Size infrastructure to coincident demand, not total connected load. Not all

vehicles charge simultaneously.

  1. Treat distribution transformer thermal rating as the binding constraint, not

nameplate kVA. Ambient temperature and pre-existing load reduce available headroom.

  1. Account for demand charges on the single highest 15-minute interval. One unmanaged

charging event can set the monthly bill.

  1. Compare TCO over the same timeframe (7-10 years) and discount rate for both the

internal combustion (ICE) and EV options.

  1. Include battery replacement cost in EV TCO for vehicles exceeding 150,000 miles or

8 years.

  1. Flag charger utilization below 15% as oversizing and above 85% as queuing risk.
  2. Treat managed charging as requiring communication infrastructure (OCPP, fleet

management system) and budget network connectivity per charger.

  1. Phase transitions sequentially: light-duty sedans first (best TCO), then SUVs and

vans, then medium and heavy-duty last (longest payback).

  1. Always model the "do nothing" ICE-retention baseline. Electrification competes

against ICE retention, not against zero cost.

  1. This skill provides engineering, financial, and regulatory estimates for planning

only; outputs are informational and not a substitute for professional advice. Recommend the user engage a licensed electrical engineer for the site electrical and interconnection design, the serving utility for service and tariff confirmation, and a qualified financial or tax advisor for incentive eligibility and capital decisions before committing funds. </Rules>

<Agent Annotations>

  • [Agent] = Execute using tools. Do not involve the user.
  • [Ask user] = Present to user and wait for a response before continuing.
  • [Decide] = Evaluate conditions and follow the appropriate branch.
  • [Think] = Reason internally, no tools or output.

</Agent Annotations>

<Gotchas>

  • NEC 625.41 requires EVSE circuits sized at 125% of continuous load. A 48A charger

needs a 60A breaker and #6 AWG wire. This is non-negotiable code compliance.

  • Demand charges are the hidden cost killer. Unmanaged fleet charging can add

thousands per month in demand charges for a mid-size depot; verify the site tariff.

  • Vehicle acceptance rate caps DCFC benefit. A vehicle that accepts only 50 kW gains

nothing from a 150 kW charger.

  • Cold weather reduces EV range 20-40% and slows charging. Northern-climate planning

must size for winter worst case.

  • Utility service upgrades have 6-18 month lead times. Start interconnection early.
  • Not all EVs support managed charging via OCPP. Verify vehicle and charger

compatibility before assuming smart-charging savings.

  • Distribution transformers are designed for ~30-year life at rated load. Unmanaged

EV charging can cut that to 10-15 years (IEEE C57.91 aging).

  • EV residual value is volatile beyond 5 years. Use conservative assumptions.
  • Three-phase 480V service is standard for DCFC but may not exist at a depot; adding

it is a major cost.

  • The Amazon Quick Python sandbox has numpy and pandas but no linear-program solver

(no scipy.optimize, pulp, or cvxpy). Implement managed charging as a valley-filling heuristic, not a solved optimum. See references/cost-and-grid-models.md. For a true least-cost managed-charging optimum, use a coding agent such as Kiro via ACP in Quick on desktop to install pulp, cvxpy, or scipy.optimize and run the optimization outside the sandbox.

  • pip install is blocked in the sandbox. Use only pre-installed libraries.

</Gotchas>

<Instructions>

<Workflow - Fleet Electrification Analysis description="Produce a phased, feasibility-checked, cost-justified fleet electrification plan from fleet and site data." tools=[get_current_time, web_search, url_fetch, file_read, run_python, file_write, open_in_session_tab] triggers=["User asks to plan fleet electrification", "size EV chargers", "model fleet charging load", "assess site electrical capacity", "compare EV vs ICE total cost of ownership", "optimize managed charging", "assess grid impact of fleet charging"]

  1. [Agent] Verify reference data before any calculation. Call get_current_time, then

list which time-sensitive values the analysis needs (tariffs, fuel and electricity prices, incentive amounts, technology costs). Fetch each from the matching source in references/data-sources.md with web_search or url_fetch. Validate: every time-sensitive value has a source fetched this session or provided by the user. If fails: per Rule 1, stop and ask the user to confirm or provide the value.

  1. [Agent] Ingest fleet inventory and characterize duty cycles. If the user supplied a

file, read it with file_read. Record class, annual/daily miles, fuel type, and MPG per vehicle. Categorize by replacement priority. Compute daily energy as daily_miles / EV_efficiency (mi/kWh). Identify classes with EV equivalents today. Validate: every vehicle has class, daily miles, and a computed daily energy. If fails: request fleet data, or use class-average assumptions and state the uncertainty explicitly.

  1. [Ask user] Confirm site electrical inputs: service voltage and amperage,

distribution transformer kVA rating, existing peak demand, panel space, and distance from transformer to parking. Validate: the user supplies these or explicitly asks for conservative assumptions. If fails: use a conservative assumption (50% of transformer headroom already consumed by existing load) and label it.

  1. [Agent] Size charging infrastructure using references/charging-and-electrical-specs.md.

Match charger type to dwell time and energy per class, set charger-to-vehicle ratios from shift patterns, and compute total connected load and coincident demand. Specify circuit sizes per NEC 625.41. Compare connected load against the headroom from step 2. Validate: each class has a charger level, count, coincident demand, and circuit spec, with a stated pass/fail against headroom. If fails: flag the infrastructure gap and quantify the upgrade requirement.

  1. [Agent] Model the coincident charging demand profile. Run the Monte Carlo

simulation in references/charging-and-electrical-specs.md via run_python (numpy), in bounded chunks under the 60-second limit, writing results incrementally. Generate P10/P50/P90 demand curves at 15-minute resolution, overlay the existing facility load, and assess transformer loading against IEEE C57.91 limits. Validate: P10/P50/P90 profiles exist and a resulting billing peak is computed. If fails: fall back to the deterministic worst case (all vehicles arrive at once at minimum SOC) and label it.

  1. [Agent] Optimize managed charging with the valley-filling heuristic in

references/cost-and-grid-models.md (no LP solver in the sandbox). Apply the site power constraint and the verified TOU rate. Compare managed vs unmanaged peak demand and annual cost, and state the OCPP communication requirement. Validate: managed and unmanaged peak demand and annual cost are both reported. If fails: use the simplest heuristic (charge off-peak only) and show its value.

  1. [Agent] Build the TCO comparison using references/cost-and-grid-models.md with the

values verified in step 0. Model the ICE baseline and the EV scenario over one horizon and discount rate, allocate infrastructure cost per vehicle, find the crossover year, and run sensitivity on fuel price, electricity rate, incentives, and maintenance. Validate: both TCO curves, a crossover year (or "none within horizon"), and a sensitivity range are reported, each traceable to a sourced input. If fails: report TCO with explicit assumptions and uncertainty ranges.

  1. [Agent] Assess distribution grid impact using references/cost-and-grid-models.md.

Compute the transformer aging factor and projected life reduction, the hosting capacity limit, and ranked mitigations. Produce a utility coordination summary. Validate: aging factor, hosting capacity, and at least one mitigation are reported. If fails: flag that a detailed grid study needs utility engineering data.

  1. [Ask user] Confirm where to save the deliverable (a directory path). Do not assume

a location. Validate: the user provides a writable path. If fails: offer to write into the skill's working directory and confirm.

This is the start of the file. Read the full SKILL.md on GitHub.

Security

  • Security scanPassed, 100 of 100Pattern checks on the skill's files.
  • Model reviewNot runA model review is scheduled for the next rescan.

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

Repository stars
50
Repository forks
4
7-day trend score
0

Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/amazon-quick/amazon-quick-official-catalog/ev-fleet-planning/badge)](https://verified-skill.com/skills/amazon-quick/amazon-quick-official-catalog/ev-fleet-planning)

Something wrong with this skill or its page? Tell us.