<< All versions

Skill v3.1.0

Trusted Publisher100/100
anton-abyzov/specweave/sw-done

+4 new

──Details
PublishedOctober 20, 2026 at 06:03 AM
Content Hashsha256:154023706c16a5eb...
Git SHAd3cc8689f2db
Bump Typepatch
Compare with v1.0.0
──Files
Files (1 file, 2.6 KB)
SKILL.md2.6 KBactive
SKILL.md · 51 lines · 2.6 KB

description: Close a SpecWeave increment - every task done or skipped, specweave verify green, a fresh-context review, then specweave complete. Use for "close it", "we are done", "finish up". argument-hint: "[increment-id] [--reason \"...\"]" version: 3.1.0


sw-done: close an increment

Closing is verify, review, complete. The one hard gate is a passing reports/verify.json; everything else is evidence.

Steps

  1. Board. specweave task list: every task must be done or skipped. Anything

open goes back to sw-do, or specweave task skip T-04 --reason "<why>".

  1. Verify. specweave verify runs the project's test, lint and build commands

(config testing.commands, else detected), checks every acceptance criterion against the ledger (an AC is met when all its tasks are done) and writes reports/verify.md and reports/verify.json. Red: fix and re-run. Do not tick AC boxes; they are derived.

  1. Review. For anything that ships, run sw-review in a fresh context. With

review.crossModel on, also specweave review: another model family reviews the diff (exit 3 means fix first). If the project has a GLOSSARY.md, run specweave glossary check and rename new code that uses an avoided word. Fix critical and high findings, then verify again.

  1. Docs. If commands, config or user-facing behaviour changed, update README,

CHANGELOG and the ## Commands table in AGENTS.md in the same branch.

  1. Complete. specweave complete 0042. It refuses without a passing verify unless

the user gives a reason: specweave complete 0042 --reason "<why>".

  1. Ship. Push the branch and open the PR the way this repository ships;

specweave report writes an HTML timeline to attach as evidence.

Report in one paragraph: verify result, review verdict (or "skipped"), commits, anything deferred.

Manual path (no CLI)

Check every task in spec.md has a done or skip line in ledger.jsonl. Run the project's test, lint and build commands yourself and put their real output in reports/verify.md. Then set "status": "completed" in metadata.json, the one state change the manual path makes by hand.

Rules

  • Never ask "should I close?" when the tasks are done; close, and the user can reopen.
  • Never edit metadata.json status while the CLI is available.
  • Several agents on one increment: only the lead closes, after every agent has handed

off or released its claims.

  • Completing never calls GitHub, Jira or Azure DevOps unless close-on-complete is set;

a failed sync afterwards is retried with specweave sync push.

← v1.0.0All versionsv3.1.1 →