Skill v3.1.0
currentTrusted Publisher100/100+4 new, ~1 modified
description: Plan work as a SpecWeave increment - one spec.md with Problem, Scope, numbered ACs, Approach and Tasks - before writing code. Use for "plan a feature", "new increment", "let's build X". argument-hint: "\"<title>\" [--supersedes NNNN]" version: 3.1.0
sw-increment: plan the unit of work
An increment is one folder, .specweave/increments/NNNN-slug/, with one file you write: spec.md. ledger.jsonl beside it holds task state and is only appended to; metadata.json is machine state you never need to read. One increment is one branch and one PR.
Before writing
- A small self-contained fix needs no increment. Just do it.
- An open increment already owns the files this touches (
specweave task list)? Add
ACs and tasks to its spec.md instead of opening another.
- Read the code the change touches before writing Approach. If
GLOSSARY.mdexists,
write the spec in its terms.
- Unsure what to build at all, or the user says "grill me": run sw-grill-me first
(specweave skills enable grill-me installs it).
Decide
Intent first: settle what the user wants and how a machine will check it before writing ACs. planning.deepInterview sets the depth: critical (default) as below, deep runs sw-grill-me, off states defaults and asks nothing.
- Think first. Read the code and config; settle every fact yourself.
- Triage each open decision: fact (look it up, never ask), my call
(reversible or low impact: pick a default), theirs (hard to reverse, costly, taste).
- Ask only "theirs", at most 5, highest impact first. Each gets one clause on why
it matters and 2 to 4 options, your recommendation first; "yes" accepts it. Use your tool's structured question tool when it has one. A clear request asks nothing.
- Record in
## Decisions: Asked, Defaulted (list every default: one the user
never saw is one they could not reject) and Open. Keep a line only when a later change could contradict it: hard to reverse, surprising without context, or a real trade-off. Apply each answer to Scope, ACs and Approach.
Create it
specweave create-increment "Add rate limiting" prints the new folder with a scaffolded spec.md; replace every [bracket]. Add --supersedes 0031 when this replaces an older increment (that one is abandoned for you), --planned for backlog work.
Manual path (no CLI): next id = highest folder number + 1, zero-padded to 4. Create NNNN-kebab-slug/ with spec.md, an empty ledger.jsonl and this metadata.json:
{"id":"0042-ledger-fold","status":"active","type":"feature","created":"2026-09-02T10:00:00Z","lastActivity":"2026-09-02T10:00:00Z"}
Write UTF-8 without a BOM; in PowerShell use [IO.File]::WriteAllText($p, $body, [Text.UTF8Encoding]::new($false)), never >.
spec.md
# 0042 Ledger fold## ProblemTwo agents can both believe they own T-01. Who hits it, and the evidence.## ScopeIn: claim ordering, malformed lines. Out: a ledger server.## Acceptance Criteria-[ ] AC-01: Two agents claiming the same task never both get it-[ ] AC-02: A malformed ledger line is skipped and counted, never fatal## ApproachFiles that change and in what order, decisions, rejected alternatives, risks.## Decisions### Asked-D-01 Claim tie-break? → earliest ledger line wins (user).### Defaulted (change any before sw-do)-D-02 Malformed-line report → a count in `task list` (reversible).### Open-none## Tasks### T-01 Fold the ledger-AC: AC-01 | Files: src/core/tasks/ledger.ts, tests/e2e/double-claim.e2e.ts | Test: npm run test:e2e -- double-claim### T-02 Skip malformed lines-AC: AC-02 | Files: src/core/tasks/ledger-parse.ts, tests/e2e/malformed-ledger.e2e.ts | Test: npm run test:e2e -- malformed-ledger
- ACs are observable: "p95 of /search under 300 ms with 10k rows", not "faster".
- Every AC is covered by at least one task; every task names its
Filesand aTest
command a machine can run.
- A
Testchecks the AC from the outside: the CLI, HTTP route, UI or public API a user
or caller touches, run with the repo's own test command. A new test file goes in the task's Files. Reuse existing tests; plan new unit or integration tests only when the user, the project's testing config or its conventions ask for them. The human-approved AC is the oracle, not a test the agent wrote.
Filesis the ownership unit: two tasks that edit one file cannot run in parallel,
so merge them. Shared contracts (types, schema) go in an early task.
- An AC is met when every task covering it is done. Nobody ticks the boxes; never
write state into spec.md.
plan.mdis optional overflow for a genuinely large design.
Then
Show the ACs and tasks. Unless the user asked to review the plan first, carry on with sw-do (one agent, or parallel lanes for three or more disjoint groups of tasks). Opening an increment makes closing it part of the same job: any plan or checklist you show ends with "Verify and close 0042", and sw-do closes it through sw-done once the last task is done. When the plan waits for the user's review, say the increment stays open until they answer.