Skill v1.0.1
currentAutomated scan100/100+2 new
name: audit-plan-implementation description: Independently audit a task attempt or completed run against a frozen plan, checking ownership, evidence, acceptance, and final readiness. metadata: version: "1.0.1"
Audit plan implementation
Inputs
Independently compare current source-bound task result and evidence with the frozen contract, ownership and every acceptance criterion. Preserve failures and missing evidence. Semantic review must precede the actual typed audit; no self-review or fabricated positive report.
Read the complete lifecycle contract before acting in this stage. It preserves every original instruction; this entrypoint is a routing summary, not a replacement contract. Follow its linked shared contracts for the selected task.
Read the common route, recipe table and safety rules. Read the implementation audit recipe and its required links. A typed audit validates bound artifacts, not an invented independent judgement. Final audit requires all required tasks accepted and actual native finalization.
For new capability claims, apply the bounded pre-freeze feasibility mapping in the linked contract: actual entrypoints, lower authority, negative case and owners.
Do not bypass independent review, reviewed freeze, ownership, authorization or budgets. Missing evidence stays missing; unknown telemetry stays null. Do not reset expenses or run clocks after retries or context compaction.
Safe artifact commands: task artifact-create creates new bounded structured JSON; task artifact-inspect displays it read-only. Serialization and prepared Review Mesh packets grant no review, attestation or execution authority. See safe artifact authoring.
Full contract SHA256: de42b0282e75ce75bff1dd37f4c1e91a8f2ad354750db8596d116986018af526 Contract origin: ec59da9e956c67d34e823dcad362d66901ec3348.
Adapter lifecycle evidence
Check GUIDANCE_ONLY, OBSERVED and ENFORCED evidence against the qualified route; NO_RECOMMENDATION is not enforced support. A claim in a prompt or skill does not prove a host-owned pre-action boundary. Reject a stale receipt or mismatched operation identity. Follow the complete reference for the existing typed gates.
Resource paths are relative to this installed skill root. The package supplies its required documents; a consumer project is not their fallback source.