babyworm/rtl-agent-team/rtl-p5-verify-team
Claude Code and agent skill by babyworm/rtl-agent-team
- community
Checking that the SKILL.md file is still in the repository.
Phase 5 verification with native team parallel workers across modules. Triggers 'verify team', 'parallel verify', 'Phase 5 team'; best for 3+ modules.
Install
npx vskill@latest install babyworm/rtl-agent-team/rtl-p5-verify-teamSKILL.md
<Purpose> Execute Phase 5 verification pipeline using Claude Code native team infrastructure. The skill (main session) handles team lifecycle: TeamCreate, coordinator + worker spawning, task monitoring, and cleanup. The coordinator teammate manages the 9-category verification task graph and directs workers via SendMessage. </Purpose>
<Use_When>
- Phase 4 RTL implementation is complete with lint passing
- User says "verify team", "Phase 5 team", "parallel verify"
- Need maximum parallelism for multi-module verification
- Have 3+ modules that benefit from concurrent verification workers
</Use_When>
<Do_Not_Use_When>
- RTL modules don't exist yet (run rtl-p4-implement first)
- Single module only (use rtl-p5-verify for simpler flow)
- Want sequential verification (use rtl-p5-verify)
- Only need a specific verification category (use the category-specific skill)
</Do_Not_Use_When>
Prerequisites
Phase 4 completion required:
rtl/**/*.svfiles must exist- One of the following completion proofs must exist:
reviews/phase-4-rtl/lint-report.md(fullrtl-p4-implementpath).rat/state/p4-state.jsonwithgates.p4_exit.verdict=pass(rapidrtl-p4-rapid-implpath)
If prerequisites are missing: WARNING — recommend running /rtl-agent-team:rtl-p4-implement. Proceed with available artifacts — orchestrator will adapt scope.
Execution
Compliance Notes
- Verification must confirm all iron requirement
acceptance_criteriaare met.
When structured acceptance_criteria (with ac_id) exist from P3, verification tracks compliance at the individual criterion level (ac_id granularity). When acceptance_criteria is in string-array format (P1/P2), verification operates at REQ level.
- Final compliance check compares test results against P1+P2+P3
acceptance_criteria - Phase 5 PASS requires zero unmet iron requirements across all verification categories
Security
- Security scanPassed, 90 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/rtl-p5-verify-team/SKILL.md
Popularity
- 7-day trend score
- 0
Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/babyworm/rtl-agent-team/rtl-p5-verify-team)