BABOK 6.2 skill — Define Future State (to-be). Use this skill when the BA wants to describe the target business state, set SMART objectives with KPIs, run a gap analysis, or capture constraints and potential value of the change. Triggers: "future state", "to-be", "objectives", "gap analysis", "constraints", "potential value", "SMART objectives", "define future state".
Install
npx vskill@latest install chaussky/ainalyst/future-stateSKILL.md
SKILL: Define Future State (BABOK 6.2)
When to read this skill
Read this file when:
- The BA says "we need to describe the target state," "how it should be," "future state"
- The BA wants to set business objectives with KPIs
- The BA is running a gap analysis or describing the gap between as-is and to-be
- The request contains: "future state," "to-be," "objectives," "gap analysis,"
"constraints," "potential value," "SMART objectives"
What this task is about
BABOK 6.2 — Define Future State — describes where the organization is heading.
Two key outputs:
- Future state description — 8 "how it should be" elements + SMART objectives with KPIs
- Gap analysis — a structured comparison of the current and future states (input for 6.4)
Why this matters:
- Without a future state, there's no basis for evaluating design options in 7.5
- SMART objectives with KPIs give a baseline for measuring success in Chapter 8
- The gap analysis is a direct input for 6.4: the change strategy is built on an explicit gap
- Potential value in 6.2 is context for the detailed calculation in 7.6
MCP tools (7)
| Tool | When to call | |
|---|---|---|
scope_future_state | First step — analysis contract, what we're describing | |
capture_future_state_element | For each element in scope (iteratively) | |
define_goals_and_objectives | For each business objective with KPIs (SMART validation) | |
capture_constraints | For each constraint, by category | |
run_gap_analysis | After filling in all elements — an explicit artifact | |
assess_potential_value | Structured benefit assessment (input data for 7.6) | |
check_future_state_completeness | Before finalizing — coverage check | |
save_future_state | Final step — Markdown report + handoff to 7.3 |
Note:save_future_stateis the 8th call in the pipeline, but it's counted aspart of the task's 7 core tools in the platform's tool listing.
Workflow
Step 1 — Scope (mandatory first)
Call scope_future_state. An explicit contract: what we're analyzing, at what depth.
Questions for the BA:
- Same elements as in 6.1, or expanding the scope? → elements_in_scope
- Level of detail: a strategic-level pass or deep elaboration? → analysis_depth
- Are there already known objectives from the sponsor? → known_goals
If 6.1 exists — the system automatically reads the current state scope as context. This is the recommended starting point: the same elements, but now looking at "how it should be."
Step 2 — Capturing data by element (iterative)
Call capture_future_state_element for each element.
Order of work:
- Start with
business_needs— which needs will be satisfied - Then
capabilities— new / improved processes - Then
technology— the target technology stack - As needed:
org_structure,policies,architecture,assets,external
UX pattern "past alongside future": If 6.1 data exists, the tool automatically shows the element's current state alongside. Use this: the BA describes not "what to add" but "how it should ultimately be."
Sign of a quality description:
- Outcome-focused, not focused on the implementation process
- Has target metrics (
target_metrics) - Traced to a BN from 6.1 (
linked_business_needs) - Doesn't duplicate the current state
Sign of a poor description:
- "There will be a CRM system" — that's a solution, not a future state
- "Everything will be better" — no specifics
- Describes the implementation process rather than the target state
For more on the 8 elements, read references/future_state_guide.md
Step 3 — Business objectives and KPIs
Call define_goals_and_objectives for each business objective.
SMART validation (more detail: `references/future_state_guide.md`):
- The tool checks the criteria and suggests improvements
- Each objective is linked to a BN from 6.1 → traceability
BN → BG → FR - The objective is registered as a
business_goalnode in the 5.1 repository
Structure of `objectives_json`:
An objective without a measurable KPI isn't an objective. Help the BA find a metric.
Step 4 — Constraints
Call capture_constraints for each constraint.
Types: budget | time | technology | policy | resources | compliance | other
Why capture them explicitly:
- In 7.5, design options are developed within the constraints
- Assumed constraints (
assumed) need to be validated — they may turn out to be myths - Unknown constraints = project risks
Step 5 — Gap analysis (a separate, explicit tool)
Call run_gap_analysis.
Important: the gap analysis is a thinking tool, not a mechanical step. The BA should run it deliberately after filling in all the elements.
Without 6.1 data: current_description = null — the gap is formulated based on future only. With 6.1 data: the current and future states are automatically compared element by element.
The result ({project}_gap_analysis.json) is a mandatory input for 6.4.
Change types: new | improve | eliminate | replace Complexity assessment: low | medium | high
For more detail: references/future_state_guide.md → "Gap analysis" section
Step 6 — Potential value
Call assess_potential_value.
A qualitative assessment, without a formula. A structured list of benefits. This is context for 7.6, not a replacement for it.
Parameters:
benefits_json— a JSON list of benefits (type + magnitude + confidence + linkage)investment_level— a qualitative assessment of the investment levelvalue_summary— a summary statement for communicating with the sponsor
For more on benefit types, magnitude, confidence: read references/value_guide.md
Step 7 — Completeness check
Call check_future_state_completeness before finalizing.
What it checks:
- Are all in-scope elements filled in?
- Is there at least one objective with a KPI?
- Are BNs linked to objectives (if 6.1 exists)?
- Is there at least one constraint?
- Has the gap analysis been run?
- Is there a potential value assessment?
These are warnings, not blockers. The analyst decides whether to proceed.
Step 8 — Finalization
Call save_future_state.
Parameter `push_to_business_context`:
false(default) — only saves the 6.2 reporttrue— prepares data for handoff to 7.3. The BA then calls:
set_business_context(from_strategy_project_id="project_id", ...) and the data from the 6.2 objectives will pre-fill the business context for requirements validation
Integration with other tasks
Input: 6.1 → 6.2 (optional)
6.1 is not required for 6.2 to work — graceful degradation. If 6.1 exists, the following is read automatically:
{project}_current_state_scope.json→ context for the 6.2 scope{project}_business_needs.json→ BNs for tracing objectives{project}_current_state.json→ current state for the gap analysis
Output: 6.2 → 5.1 (objective traceability)
BG-xxx nodes are registered in the 5.1 repository with type business_goal. End-to-end chain: BN-001 → derives → BG-001 → satisfies → FR-001 → verifies → TC-001
Output: 6.2 → 6.4 (change strategy)
{project}_gap_analysis.json is a mandatory input for 6.4. The change strategy is built on the explicit list of gaps and their types.
Output: 6.2 → 7.3 (business context)
set_business_context in 7.3 accepts from_strategy_project_id. When passed, it pre-fills business objectives and future_state from 6.1 + 6.2 data. The older parameter from_current_state_project_id is deprecated but still works.
Output: 6.2 → 7.6 (potential value)
add_value_assessment in 7.6, when 6.2 exists, reads benefits as pre-fill context. The BA refines the qualitative assessments quantitatively — not starting from scratch.
6.2 artifacts
| File | Purpose | |
|---|---|---|
{project}_future_state_scope.json | Contract: what we're analyzing | |
{project}_future_state.json | Elements, objectives, constraints, value, status | |
{project}_future_state_goals.json | Objectives and KPIs (+ registration in 5.1) | |
{project}_gap_analysis.json | Gap analysis — input for 6.4 | |
6_2_future_state_{project}.md | Human-readable report (REPORTS_DIR) |
Reference files
Read when you need detail:
- `references/future_state_guide.md` — detailed description of the 8 elements, SMART criteria,
gap analysis change types, constraint types and statuses, UX patterns
- `references/value_guide.md` — benefit types, magnitude/confidence, investment_level,
benefits_json structure, common BA mistakes when assessing value
Security
- Security scanPassed, 100 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/future_state/SKILL.md
Popularity
- 7-day trend score
- 5
Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/chaussky/ainalyst/future-state)