currentAutomated scan100/100name: requirements_traceability description: > BABOK 5.1 skill — Trace Requirements. Use this skill when the BA wants to build or update the graph of links between project artifacts, add a traceability link, run an impact analysis, or export a traceability matrix. Triggers: "trace requirements", "traceability matrix", "requirement links", "impact analysis", "where did this requirement come from", "coverage", "requirements graph". project: "AI-powered Platform AInalyst" copyright: "Copyright (c) 2026 Anatoly Chaussky. Licensed under AGPL v3. Commercial licensing: chaussky@gmail.com" metadata: version: "1.0.0"
SKILL: BABOK 5.1 — Trace Requirements
Task: managing requirements traceability throughout the life cycle. MCP server: requirements_traceability_mcp.py Reference: references/traceability_guide.md
What this task is about
Traceability is a graph of links between all project artifacts.
Business need└─[derives]→ Business requirement (BR)└─[derives]→ Stakeholder requirement (SR)└─[derives]→ Solution requirement (FR/NFR)├─[satisfies]← Component / module└─[verifies]← Test (TC)
Plus horizontal links: depends between requirements at the same level.
Core value: when a CR arrives or a requirement changes, the BA instantly sees what's affected — which requirements, tests, components. Without traceability, it's guesswork.
When this skill is activated
- BA adds a new requirement to the project
- A requirement has changed (CR or clarification)
- Need to assess the impact of a change (→ handed off to 5.4)
- Need to check coverage before prioritization (5.3) or approval (5.5)
- Request for a traceability matrix for stakeholders or an audit
Three modes of operation
Mode A — Initial traceability for a new requirement
When: a confirmed requirement arrives from 4.3, or a new requirement comes in via a CR.
Algorithm:
- Determine the requirement type:
business/stakeholder/solution/transition - Ask: where did it come from? → find the parent for the
deriveslink - Ask: what does it follow from, or what does it require? → horizontal
depends - Ask: which component implements this? (if already known) →
satisfies - Ask: which test verifies this? (if already known) →
verifies - Call
add_trace_linkfor each link - If the repository is being created for the first time → call
init_traceability_repofirst
📌 If there's no answer to questions 4-5, that's fine.satisfiesandverifieslinks can be added later. An orphan requirement withoutsatisfies/verifiesis an expectedstate at early stages. An orphan withoutderivesis already a problem.
Mode B — Maintaining traceability (requirement change)
When: a requirement has been updated (version, status, content).
Algorithm:
- Update the requirement record: new version, new status
- Call
run_impact_analysis— get the list of all affected artifacts - For each affected artifact: is the link still valid?
- If the link is stale → update
rationaleor remove it viaadd_trace_linkwith theremoveflag - If new links have appeared → add them
- If the change arrived as a CR → the
run_impact_analysisresult is passed to 5.4
for expert assessment: accept or not, what's the cost
⚠️ Mode B is the most common cause of "dead traceability." The BA updates a requirementbut forgets to update the graph. Claude should remind them: "this requirement changed —the links need to be checked."
Mode C — Coverage audit
When: before prioritization (5.3), before approval (5.5), after a series of CRs.
Algorithm:
- Call
check_coverage - Interpret the results:
- 🔴 Orphan with no source → clarify the business justification or freeze it
- 🟡 No implementation → check with the developer or add to the backlog
- 🟡 No test → check with QA or create a test. Applies to BEHAVIORAL
requirement types (functional / non_functional / user_story / use_case / solution / transition); model artifacts (erd, data_dictionary, business_process, business_rule) are reviewed, not tested
- 🟢 Full coverage → ready for the next step
- Make a decision for each problematic requirement
- If needed →
export_traceability_matrixfor a report
Formality levels — choose before you start
If the project context is unknown — ask the BA. Picking the right preset saves hours of unnecessary work or guards against missed links.
| Question for the BA | If the answer is... | Recommend | |
|---|---|---|---|
| Are there regulatory requirements? (GDPR, local law, ISO) | Yes | Full | |
| External audit or compliance? | Yes | Full | |
| Team > 20 people? | Yes | Standard → Full | |
| Is there a dedicated QA function? | Yes | Standard | |
| Agile, sprints, startup? | Yes | Lite |
The BA always makes the final decision. The skill recommends, it doesn't impose.
Read the preset details: references/traceability_guide.md → section "Formality presets"
Integration with other tasks
Where requirements come from:
4.3 save_confirmed_elicitation_result→ confirmed artifacts → add to the repository (Mode A)4.2 save_cr_elicitation_analysis→ requirements from a CR → update traceability (Mode B)
Mapping from 4.3 into the traceability repository
The 4.3 artifact stores requirements in the structure {functional: [...], non_functional: [...]}. When adding to the traceability repository, convert as follows:
| Field in 4.3 | Field in the 5.1 repository | |
|---|---|---|
functional[].id → FR-001 | id | |
"FR" / "NFR" | type: "solution" | |
functional[].statement | title | |
"confirmed" (final_readiness) | status: "confirmed" | |
| path to the 4.3 file | source_artifact |
Business requirements (BR) and stakeholder requirements (SR) come from earlier elicitation sessions (4.2). Their type: "business" and "stakeholder" respectively.
Where the results go:
5.3Prioritization → account fordependslinks: a requirement can't be prioritized above its dependency5.4Change assessment → pass therun_impact_analysisresult as technical input5.5Approval → useexport_traceability_matrixfor the sign-off package6.xUser Stories / Use Cases → every artifact traces back to an FR/SR
MCP tools
| Tool | Mode | When to call | |
|---|---|---|---|
init_traceability_repo | A | Once, at project start | |
add_trace_link | A, B | For every new/changed requirement or link | |
run_impact_analysis | B | A change has arrived, need to understand what's affected | |
check_coverage | C | Audit before prioritization / approval / after a CR | |
export_traceability_matrix | C | Need a matrix for stakeholders or an audit |
What 5.1 does NOT do
- Does not prioritize requirements — that's 5.3
- Does not assess whether to accept a CR — that's 5.4 (5.1 provides technical input)
- Does not formally approve requirements — that's 5.5
- Does not create requirements — that's 4.2/4.3
- Does not manage code configuration — that's outside BABOK
Quick start for a new project
1. BA hands over confirmed artifacts from 4.32. Choose a formality level (Lite / Standard / Full)3. init_traceability_repo — create the repository4. For each requirement: add_trace_link (Mode A)5. check_coverage — make sure there are no orphan requirements6. export_traceability_matrix — save the initial state