currentAutomated scan100/100version: "1.0.0" name: requirements_validate description: > Skill BABOK 7.3 — Validate Requirements. Use this skill when the BA wants to check that the requirements are truly needed by the business: aligned with business goals, create value, do not contradict strategy, and are accepted by stakeholders. Triggers: "validate requirements", "does the business need this", "goal alignment", "business value", "are these the right requirements", "acceptance". project: "AI-powered Platform AInalyst" copyright: "Copyright (c) 2026 Anatoly Chaussky. Licensed under AGPL v3. Commercial licensing: chaussky@gmail.com"
SKILL.md — BABOK 7.3 Validate Requirements
What this task is about
Validation answers the question: "Did we write the right requirements?"
Distinction from verification (7.2):
- 7.2 Verify → "Are the requirements written correctly?" (quality of wording)
- 7.3 Validate → "Do we need these requirements?" (value to the business)
A requirement can be perfectly worded — atomic, unambiguous, testable — but useless to the business. Validation is what catches that.
Key principle: 7.3 is an iterative task. It can be invoked multiple times at different stages of the project, unlike 7.2 (a one-time pass).
Three axes of validation (BABOK)
Axis 1: Value
Does the requirement bring benefit to stakeholders?
- Every req should trace back to a business goal (BG)
- An orphan req without traceability is a candidate for removal or decomposition
Axis 2: Alignment with the future state
Does the req help achieve the Future State described in the business context?
check_business_alignmentchecks this automatically (BFS + title-matching)- The coverage matrix shows which BGs are not covered by any req
Axis 3: Assumptions and risks
Have assumptions been identified, and are the related risks managed?
- Every contestable assumption must be logged via
log_assumption - High-risk assumptions block validation (warning in
mark_req_validated)
Pipeline (steps in order)
1. set_business_context ← once, at the start of validation2. check_business_alignment ← check all verified req3. set_success_criteria ← [optional] for critical req4. log_assumption ← [as you go] when an assumption surfaces5. resolve_assumption ← [as you go] after confirming/refuting6. mark_req_validated ← move verified → validated7. get_validation_report ← summary report
MCP tools
1. set_business_context
When: once, at the start of work on validating the project.
set_business_context(project_id = "crm_upgrade",business_goals_json = '[{"id":"BG-001","title":"Reduce request processing time","kpi":"from 24h to 4h"},{"id":"BG-002","title":"Increase NPS","kpi":"from 45 to 65"}]',future_state = "Operators handle requests in a single window, prioritization is automated",solution_scope = "In scope: CRM module, integration with 1C. Out of scope: mobile app")
Data is stored in {project}_business_context.json. The business context is synced with tasks 6.1/6.2.
2. check_business_alignment
When: after creating the business context, before mark_req_validated.
check_business_alignment(project_id = "crm_upgrade")# Checks all verified reqcheck_business_alignment(project_id = "crm_upgrade",req_ids = '["US-001", "FR-005", "UC-002"]')# Checks specific req
What it checks:
- BFS traversal of the 5.1 graph: is a node of type
businessreachable from the req? - Title-matching against the BGs from business_context
- Returns: aligned / orphan for each req
- Coverage matrix: which BGs are not covered
Interpretation:
aligned(bfs) → traced through the 5.1 graph — the best outcomealigned(title-match) → keyword match — worth adding an explicit link in 5.1orphan→ neither BFS nor title-match → requirement without a business justification
3. set_success_criteria
When: optional — for critical req where it matters to measure the outcome.
set_success_criteria(project_id = "crm_upgrade",req_id = "FR-001",criteria_json = '{"baseline": "Assignment time: 45 min manually","target": "Assignment time: ≤ 30 sec automatically","measurement_method": "Average time in the monitoring system over 1 week","kpi_ref": "BG-001"}')
Tip: the tool automatically shows the KPI from the linked business goal as a reference point.
Link to 8.1: the success_criteria data from 7.3 becomes input for Measure Solution Performance.
4. log_assumption
When: whenever a contestable assumption is discovered while working on validation.
log_assumption(project_id = "crm_upgrade",description = "We assume operators are willing to switch to the new interface without extensive training",req_ids = '["US-005", "US-006"]',risk_level = "high",assigned_to = "A. Petrova")
Risk levels:
high→ warning atmark_req_validatedwhile still openmedium→ logged, does not blocklow→ low risk, informational record
5. resolve_assumption
When: after confirming or refuting an assumption (interview, test, research).
resolve_assumption(project_id = "crm_upgrade",assumption_id = "AS-001",resolution = "confirmed",resolution_note = "Ran a pilot with 3 operators — the switch went smoothly within 2 hours")resolve_assumption(project_id = "crm_upgrade",assumption_id = "AS-002",resolution = "refuted",resolution_note = "Integration with the legacy system is not possible without a data migration")
On `refuted`: the tool produces a list of related req for re-examination. A new round of elicitation (4.1–4.3) may be needed.
6. mark_req_validated
When: a req is ready — verified, no high-risk assumptions, and traced to a BG.
mark_req_validated(project_id = "crm_upgrade",req_ids = '["US-001", "FR-001", "FR-002"]')# Override when warnings are present:mark_req_validated(project_id = "crm_upgrade",req_ids = '["US-007"]',force = True)
Three preconditions — warnings, not blockers:
- Req status =
verified(from 7.2) - No open high-risk assumptions for this req
- Traced to a business goal
Lifecycle: draft → verified (7.2) → validated (7.3)
7. get_validation_report
When: at the end of validation work, to hand off to 7.5.
get_validation_report(project_id = "crm_upgrade")
What it contains:
- % validated out of total req
- Coverage matrix (BG → req)
- List of orphan req without traceability
- Open assumptions by risk_level
- % of req with success_criteria
- Readiness verdict for 7.5
Typical workflow
Start of the project
- Verify the requirements (7.2)
- Call
set_business_context— enter the business goals from the customer
Main body of work
check_business_alignment— find orphan req and gaps in BGs- For orphan req: add traceability via 5.1 (
add_trace_link) or exclude the req log_assumption— log contestable assumptions as they are discovered- Verify assumptions through work: interviews, pilots, analysis →
resolve_assumption
Finalization
mark_req_validatedfor ready reqget_validation_report→ report to hand off to 7.5
Files created by task 7.3
| File | Contains | |
|---|---|---|
{project}_business_context.json | Business goals, Future State, scope | |
{project}_assumptions.json | Assumption registry AS-001/AS-002/... | |
{project}_traceability_repo.json | Updated validated statuses in 5.1 | |
7_3_business_alignment_*.md | Alignment report | |
7_3_validation_report_*.md | Final report → 7.5 |
Links to other tasks
| From | What comes in | |
|---|---|---|
| 5.1 | Traceability graph — BFS traversal for check_business_alignment | |
| 7.2 | verified status — precondition for mark_req_validated |
| To | What we hand off | |
|---|---|---|
| 7.5 | Validation Report — basis for Design Options | |
| 8.1 | success_criteria from 7.3 — for measuring outcomes |
Detailed methodology and techniques
- Three axes of validation, BABOK techniques, error patterns →
references/validation_guide.md
- Working with assumptions, risk classification, assumption patterns in IT →
references/assumptions_guide.md