BABOK 6.3 skill — Assess Risks. Use this skill when the BA wants to collect, structure, and assess project risks: run a risk matrix, determine tolerance, define response strategies, and produce a recommendation for the sponsor. Triggers: "assess risks", "risk assessment", "risk matrix", "project risks", "likelihood and impact", "risk register", "risk tolerance".
Install
npx vskill@latest install chaussky/ainalyst/risk-assessmentSKILL.md
SKILL: 6.3 — Assess Risks
BABOK chapter: 6 — Strategy Analysis Task: 6.3 Assess Risks MCP server: skills/risk_assessment_mcp.py
What this task is about
Risks are uncertainty that threatens business objectives. The goal of 6.3: identify risks, assess them semi-quantitatively (likelihood × impact), plan response measures, and give the sponsor a justified recommendation: proceed / proceed with mitigation / do not proceed.
Key inputs:
- 6.1
{project}_current_state.json— root causes, business needs - 6.2
{project}_future_state.json— constraints, gap analysis - 4.2 elicitation results — risks mentioned by stakeholders
- Stakeholder registry 3.2 — for owner assignment
Key outputs:
{project}_risk_assessment.json— full risk register (→ 6.4){project}_risk_assessment_report.md— report for the sponsor
When to read references
| Situation | Read | |
|---|---|---|
| Need help categorizing or wording a risk | references/risk_assessment_guide.md | |
| Unsure how to assess likelihood/impact | references/risk_assessment_guide.md §2–3 | |
| Sponsor didn't set tolerance explicitly | references/risk_tolerance_guide.md §5 | |
| Need industry benchmarks | references/risk_tolerance_guide.md §4 | |
Unsure what the run_risk_matrix result means | references/risk_assessment_guide.md §10 |
Pipeline — 7 steps
Step 1 — scope_risk_assessment
What it does: fixes the scope: initiative type, analysis depth, risk sources, link to projects 6.1/6.2.
Parameters:
project_id— same as in 6.1/6.2initiative_type— process_improvement / new_system / regulatory / cost_reduction / market_opportunity / otheranalysis_depth— quick (High only) / standard (H+M) / comprehensive (all)source_project_ids— list of project_id from 6.1/6.2 for auto-import (optional)ba_notes— additional context
Questions for the BA before calling:
1. What type of initiative (see initiative_type)?2. How deep should the analysis be? (quick = an hour of work, comprehensive = half a day)3. Are there already completed 6.1 or 6.2 artifacts for this project?
Step 2 — import_risks_from_context (recommended)
What it does: scans the 6.1, 6.2, 4.2 artifacts and proposes risk drafts. Drafts have status draft — the BA decides which to confirm via add_risk.
Parameters:
project_idsource_project_ids— list of project_id to scan
What to do with the result: The tool returns a list of drafts. For each draft:
- Want to add it → call
add_riskwith the draft's data (adjusting as needed) - Not relevant → just skip it
Graceful degradation: if the 6.1/6.2 artifacts aren't found — continue without them.
Step 3 — add_risk (repeat for each risk)
What it does: adds a risk to the register. Automatically:
- Assigns
risk_id(RK-001, RK-002...) - Computes
risk_score = likelihood × impact - Sets
status = identified
Required parameters:
project_idcategory— strategic / operational / financial / technical / regulatory / people / externalsource— change / current_state / future_state / requirement / stakeholder / assumption / constraintdescription— format "If X, then Y"likelihood— 1–5 (see references/risk_assessment_guide.md §2)impact— 1–5 (see references/risk_assessment_guide.md §3)response_strategy— accept / mitigate / transfer / avoid
Recommended parameters:
likelihood_rationale— rationale for the likelihood estimateimpact_rationale— rationale for the impact estimatemitigation_plan— required if strategy=mitigateowner— stakeholder_id from the 3.2 registry
Wording rule: "If [trigger/condition], then [consequence]" Bad: "Integration risk". Good: "If the legacy system's API doesn't support the required methods, then integration will take 6 weeks longer".
How many risks are enough?
| Depth | Minimum risks | |
|---|---|---|
| quick | 3–5 | |
| standard | 7–15 | |
| comprehensive | 15–30 |
Quality matters more than quantity — 7 well-defined risks beat 25 vague ones.
Step 4 — set_risk_tolerance
What it does: sets the tolerance level and the numeric threshold for High risks.
Parameters:
project_idtolerance_level— risk_averse / neutral / risk_seekingmax_acceptable_score— score ≥ this = High risk (default: 15)organization_context— context (industry, type)sponsor_risk_appetite— sponsor's position (text)
If the sponsor didn't set tolerance explicitly: use the questions from references/risk_tolerance_guide.md §5 to determine it.
Quick guideline:
- Bank / public sector / pharma →
risk_averse, threshold 10–12 - Commercial company, standard project →
neutral, threshold 15 - Startup / digital transformation →
risk_seeking, threshold 18–20
Step 5 — run_risk_matrix
What it does: classifies risks into zones (Low/Medium/High), builds the cumulative profile, prepares data for the recommendation.
Parameters: only project_id
Reading the result:
high_risks_count— number of risks above the thresholdtotal_score— total "severity"zones— list of risks with zones 🟢🟡🔴
After calling: be sure to discuss the top 3 High risks with the BA before the next step.
Step 6 — generate_recommendation
What it does: deterministic logic determines the recommendation type, Claude writes the narrative rationale (2–4 sentences with concrete data).
Parameters:
project_idpotential_value_summary— brief description of the expected value from 6.2
(if 6.2 is filled in, it's pulled automatically)
value_vs_risk— optional. Your judgement on whether the expected value justifies
the cumulative risk exposure: value_exceeds_risk / comparable / risk_exceeds_value. There is no honest arithmetic for this: 6.2 states value qualitatively, while the cumulative exposure is a sum of 1–25 risk scores — comparing them numerically would be false precision. So the call is yours. (The precise numeric version of this trade-off lives in 7.6, which scores value against a risk penalty.)
Recommendation types:
| Type | When | |
|---|---|---|
do_not_proceed | Critical risks with no possible mitigation — outranks everything | |
seek_higher_value | You passed value_vs_risk="risk_exceeds_value": risks are manageable, but they outweigh the value | |
proceed_despite_risk | No risks above the threshold | |
proceed_with_mitigation | High risks exist, mitigation is possible |
If High risks are present and you do not passvalue_vs_risk, the type is decided bythe risk logic alone and the tool reminds you to state the trade-off.
Your job (Claude): write 2–4 sentences of rationale with concrete numbers. For example: "Of 12 identified risks, 3 are in the High zone (score 15–20). The most critical is the integration risk (RK-007, score 20): a Sprint 0 prototyping effort is recommended before development starts. If the mitigation plans are executed, the cumulative profile drops from 94 to ~55 — the project can proceed."
Step 7 — save_risk_assessment
What it does:
- Saves
{project}_risk_assessment.jsonto DATA_DIR (input for 6.4) - Generates a Markdown report via
save_artifact() - Optionally: registers risks in the 5.1 repository as
risk-type nodes
Parameters:
project_idpush_to_traceability— True if you're maintaining 5.1 traceability (default: False)traceability_project_id— project_id of the 5.1 repository (if different)
When push_to_traceability=True:
- Each RK-xxx is registered as a
risknode in the 5.1 repository threatens-type links are created: RK-001 threatens BN-001, etc.
After saving — tell the BA:
- Path to the JSON (for 6.4 Define Change Strategy)
- Path to the Markdown report (for the sponsor)
- Top 3 priority risks for immediate action
Quick answers to common BA questions
"How many risks do I need to find?" Enough to cover the main threats to the project's objectives. Quick = 3–5, standard = 7–15. Fewer risks with clear mitigation plans beat more vague ones.
"How do I choose between mitigate and avoid?" Avoid — if the risk is Critical (impact=5) and mitigation is technically impossible or costs more than the potential benefit. Otherwise — mitigate with a concrete plan.
"Do I need to fill in 6.1 and 6.2 before 6.3?" No, 6.3 works independently. But if 6.1/6.2 are filled in — import_risks_from_context saves time and helps avoid missing obvious risks.
"What do I do if the sponsor says 'we have no risks'?" Use import_risks_from_context — the 6.1/6.2 artifacts almost always contain hidden risks in the constraints and gap analysis. Show them the concrete drafts.
Relationship to other tasks
| Task | Relationship | |
|---|---|---|
| ← 6.1 | RCA and business needs → risk sources | |
| ← 6.2 | Constraints and gaps → risk drafts | |
| ← 4.2 | stakeholders' risks_mentioned → drafts | |
| → 6.4 | {project}_risk_assessment.json → input for Define Change Strategy | |
| → 7.6 | Risk profile is factored into the value assessment of options | |
| → 5.1 | push_to_traceability=True → risk nodes + threatens links |
Security
- Security scanPassed, 95 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/risk_assessment/SKILL.md
Popularity
- 7-day trend score
- 5
Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/chaussky/ainalyst/risk-assessment)