BABOK 6.3 skill — Assess Risks. Use this skill when the BA wants to collect, structure, and assess project risks: run a risk matrix, determine tolerance, define response strategies, and produce a recommendation for the sponsor. Triggers: "assess risks", "risk assessment", "risk matrix", "project risks", "likelihood and impact", "risk register", "risk tolerance".

Install

npx vskill@latest install chaussky/ainalyst/risk-assessment

SKILL.md

SKILL: 6.3 — Assess Risks

BABOK chapter: 6 — Strategy Analysis Task: 6.3 Assess Risks MCP server: skills/risk_assessment_mcp.py


What this task is about

Risks are uncertainty that threatens business objectives. The goal of 6.3: identify risks, assess them semi-quantitatively (likelihood × impact), plan response measures, and give the sponsor a justified recommendation: proceed / proceed with mitigation / do not proceed.

Key inputs:

  • 6.1 {project}_current_state.json — root causes, business needs
  • 6.2 {project}_future_state.json — constraints, gap analysis
  • 4.2 elicitation results — risks mentioned by stakeholders
  • Stakeholder registry 3.2 — for owner assignment

Key outputs:

  • {project}_risk_assessment.json — full risk register (→ 6.4)
  • {project}_risk_assessment_report.md — report for the sponsor

When to read references

SituationRead
Need help categorizing or wording a riskreferences/risk_assessment_guide.md
Unsure how to assess likelihood/impactreferences/risk_assessment_guide.md §2–3
Sponsor didn't set tolerance explicitlyreferences/risk_tolerance_guide.md §5
Need industry benchmarksreferences/risk_tolerance_guide.md §4
Unsure what the run_risk_matrix result meansreferences/risk_assessment_guide.md §10

Pipeline — 7 steps

scope_risk_assessment
↓
import_risks_from_context ← optional, but recommended
↓
add_risk × N ← main loop, repeat as many times as you have risks
↓
set_risk_tolerance
↓
run_risk_matrix
↓
generate_recommendation
↓
save_risk_assessment

Step 1 — scope_risk_assessment

What it does: fixes the scope: initiative type, analysis depth, risk sources, link to projects 6.1/6.2.

Parameters:

  • project_id — same as in 6.1/6.2
  • initiative_type — process_improvement / new_system / regulatory / cost_reduction / market_opportunity / other
  • analysis_depth — quick (High only) / standard (H+M) / comprehensive (all)
  • source_project_ids — list of project_id from 6.1/6.2 for auto-import (optional)
  • ba_notes — additional context

Questions for the BA before calling:

1. What type of initiative (see initiative_type)?
2. How deep should the analysis be? (quick = an hour of work, comprehensive = half a day)
3. Are there already completed 6.1 or 6.2 artifacts for this project?

Step 2 — import_risks_from_context (recommended)

What it does: scans the 6.1, 6.2, 4.2 artifacts and proposes risk drafts. Drafts have status draft — the BA decides which to confirm via add_risk.

Parameters:

  • project_id
  • source_project_ids — list of project_id to scan

What to do with the result: The tool returns a list of drafts. For each draft:

  • Want to add it → call add_risk with the draft's data (adjusting as needed)
  • Not relevant → just skip it

Graceful degradation: if the 6.1/6.2 artifacts aren't found — continue without them.


Step 3 — add_risk (repeat for each risk)

What it does: adds a risk to the register. Automatically:

  • Assigns risk_id (RK-001, RK-002...)
  • Computes risk_score = likelihood × impact
  • Sets status = identified

Required parameters:

  • project_id
  • category — strategic / operational / financial / technical / regulatory / people / external
  • source — change / current_state / future_state / requirement / stakeholder / assumption / constraint
  • description — format "If X, then Y"
  • likelihood — 1–5 (see references/risk_assessment_guide.md §2)
  • impact — 1–5 (see references/risk_assessment_guide.md §3)
  • response_strategy — accept / mitigate / transfer / avoid

Recommended parameters:

  • likelihood_rationale — rationale for the likelihood estimate
  • impact_rationale — rationale for the impact estimate
  • mitigation_plan — required if strategy=mitigate
  • owner — stakeholder_id from the 3.2 registry

Wording rule: "If [trigger/condition], then [consequence]" Bad: "Integration risk". Good: "If the legacy system's API doesn't support the required methods, then integration will take 6 weeks longer".

How many risks are enough?

DepthMinimum risks
quick3–5
standard7–15
comprehensive15–30

Quality matters more than quantity — 7 well-defined risks beat 25 vague ones.


Step 4 — set_risk_tolerance

What it does: sets the tolerance level and the numeric threshold for High risks.

Parameters:

  • project_id
  • tolerance_level — risk_averse / neutral / risk_seeking
  • max_acceptable_score — score ≥ this = High risk (default: 15)
  • organization_context — context (industry, type)
  • sponsor_risk_appetite — sponsor's position (text)

If the sponsor didn't set tolerance explicitly: use the questions from references/risk_tolerance_guide.md §5 to determine it.

Quick guideline:

  • Bank / public sector / pharma → risk_averse, threshold 10–12
  • Commercial company, standard project → neutral, threshold 15
  • Startup / digital transformation → risk_seeking, threshold 18–20

Step 5 — run_risk_matrix

What it does: classifies risks into zones (Low/Medium/High), builds the cumulative profile, prepares data for the recommendation.

Parameters: only project_id

Reading the result:

  • high_risks_count — number of risks above the threshold
  • total_score — total "severity"
  • zones — list of risks with zones 🟢🟡🔴

After calling: be sure to discuss the top 3 High risks with the BA before the next step.


Step 6 — generate_recommendation

What it does: deterministic logic determines the recommendation type, Claude writes the narrative rationale (2–4 sentences with concrete data).

Parameters:

  • project_id
  • potential_value_summary — brief description of the expected value from 6.2

(if 6.2 is filled in, it's pulled automatically)

  • value_vs_risk — optional. Your judgement on whether the expected value justifies

the cumulative risk exposure: value_exceeds_risk / comparable / risk_exceeds_value. There is no honest arithmetic for this: 6.2 states value qualitatively, while the cumulative exposure is a sum of 1–25 risk scores — comparing them numerically would be false precision. So the call is yours. (The precise numeric version of this trade-off lives in 7.6, which scores value against a risk penalty.)

Recommendation types:

TypeWhen
do_not_proceedCritical risks with no possible mitigation — outranks everything
seek_higher_valueYou passed value_vs_risk="risk_exceeds_value": risks are manageable, but they outweigh the value
proceed_despite_riskNo risks above the threshold
proceed_with_mitigationHigh risks exist, mitigation is possible
If High risks are present and you do not pass value_vs_risk, the type is decided by
the risk logic alone and the tool reminds you to state the trade-off.

Your job (Claude): write 2–4 sentences of rationale with concrete numbers. For example: "Of 12 identified risks, 3 are in the High zone (score 15–20). The most critical is the integration risk (RK-007, score 20): a Sprint 0 prototyping effort is recommended before development starts. If the mitigation plans are executed, the cumulative profile drops from 94 to ~55 — the project can proceed."


Step 7 — save_risk_assessment

What it does:

  • Saves {project}_risk_assessment.json to DATA_DIR (input for 6.4)
  • Generates a Markdown report via save_artifact()
  • Optionally: registers risks in the 5.1 repository as risk-type nodes

Parameters:

  • project_id
  • push_to_traceability — True if you're maintaining 5.1 traceability (default: False)
  • traceability_project_id — project_id of the 5.1 repository (if different)

When push_to_traceability=True:

  • Each RK-xxx is registered as a risk node in the 5.1 repository
  • threatens-type links are created: RK-001 threatens BN-001, etc.

After saving — tell the BA:

  1. Path to the JSON (for 6.4 Define Change Strategy)
  2. Path to the Markdown report (for the sponsor)
  3. Top 3 priority risks for immediate action

Quick answers to common BA questions

"How many risks do I need to find?" Enough to cover the main threats to the project's objectives. Quick = 3–5, standard = 7–15. Fewer risks with clear mitigation plans beat more vague ones.

"How do I choose between mitigate and avoid?" Avoid — if the risk is Critical (impact=5) and mitigation is technically impossible or costs more than the potential benefit. Otherwise — mitigate with a concrete plan.

"Do I need to fill in 6.1 and 6.2 before 6.3?" No, 6.3 works independently. But if 6.1/6.2 are filled in — import_risks_from_context saves time and helps avoid missing obvious risks.

"What do I do if the sponsor says 'we have no risks'?" Use import_risks_from_context — the 6.1/6.2 artifacts almost always contain hidden risks in the constraints and gap analysis. Show them the concrete drafts.


Relationship to other tasks

TaskRelationship
← 6.1RCA and business needs → risk sources
← 6.2Constraints and gaps → risk drafts
← 4.2stakeholders' risks_mentioned → drafts
→ 6.4{project}_risk_assessment.json → input for Define Change Strategy
→ 7.6Risk profile is factored into the value assessment of options
→ 5.1push_to_traceability=True → risk nodes + threatens links

Security

  • Security scanPassed, 95 of 100Pattern checks on the skill's files.
  • Model reviewPassed

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
5

Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces