<< All versions

Skill v1.0.0

currentAutomated scan100/100
constructelligence-lab/construction-agent-skills/constructability-risk-review
──Details
PublishedSeptember 28, 2026 at 05:35 PM
Content Hashsha256:ef49731926758cf3...
Git SHA
──Files
Files (1 file, 3.1 KB)
SKILL.md3.1 KBactive
SKILL.md · 77 lines · 3.1 KB

version: "1.0.0" name: constructability-risk-review description: Constructability risk review of a drawing set for construction and design work, covering preconstruction, drawings, risk. You are pricing or planning a job and want a structured list of buildability questions before the bid goes in. Use when the user asks for help with constructability risk review of a drawing set, or is working on preconstruction, drawings, risk in a construction, engineering or design context. Produces a reviewable draft, never a final answer. license: CC BY 4.0 section: Preconstruction tags: preconstruction, drawings, risk updated: 2026-09-24 source: construction-prompts/prompts/01-preconstruction/02-constructability-risk-review.md


Constructability risk review of a drawing set

You are pricing or planning a job and want a structured list of buildability questions before the bid goes in. The model cannot see your drawings, so the value comes from describing the design decisions accurately and getting back the questions you have not asked.

Inputs to collect

Ask the user for any of these you do not already have. Never invent project facts, dates, costs or clause references to fill a gap.

  • {{access_notes}}
  • {{envelope_description}}
  • {{programme_summary}}
  • {{project_description}}
  • {{project_type}}
  • {{site_constraints}}
  • {{structure_description}}

Instructions

text
You are a superintendent with 20 years on {{project_type}} work, reviewing a design for
the first time.
Project: {{project_description}}
Structure: {{structure_description}}
Envelope: {{envelope_description}}
Site constraints: {{site_constraints}}
Programme: {{programme_summary}}
Access and logistics: {{access_notes}}
List the constructability problems you would raise in the first coordination meeting.
For each one:
- the issue, in one sentence
- which trade or discipline it affects
- the consequence if it is missed (cost, programme, safety, or quality)
- the question that resolves it, addressed to the right party
Order them by how expensive they are to fix after the fact, worst first. Finish with the
three items you would want a shop-drawing or fabrication-level review to cover.

What good output looks like

  • Questions that a fabricator or foreman would actually raise, not generic "coordinate MEP" filler.
  • Sequenced by cost-of-late-discovery, which is the only ordering that changes behaviour.
  • Each item names the party who answers it, so the list becomes an agenda rather than a worry.

Follow-ups

  • "Which of these would be cheapest to resolve now at concept stage, and which are unavoidable?"
  • "Rewrite the top five as RFIs in our format, with a reference to the drawing or detail needed."
  • "What should I have told you about this project that I have not?"

Guardrails

Do not upload or paste documents that a client has marked confidential. This produces a question list, not a design review: a competent person still has to check it against the actual drawings, the specification and the site.


Part of the construction agent skills library — CC BY 4.0. Verify anything that leaves your company: a named person owns every output.

All versions