Skill v1.0.0
currentAutomated scan100/100version: "1.0.0" name: risk-register description: >- Build, score, maintain, and report a NIST-aligned cybersecurity risk register that persists in a local file and tracks how risk changes over time. Turns messy inputs (a CSF gap export, an assessment, rough notes, or a conversation) into properly-worded risks (event statements in the CAC house format, carrying NISTIR 8286A r1's scenario elements), deterministic Likelihood×Impact scoring and banding (rating labels from SP 800-30 Rev. 1; the arithmetic and thresholds are CAC's own), risk-appetite flagging (CSF 2.0 GV.RM), an append-only change log with rationale, named review snapshots, and reporting — heat matrix, themes, trend, and operational and executive/board dashboards. Use whenever the user mentions a risk register, risk log, risk matrix, heat map, risk assessment, residual vs inherent risk, risk treatment or acceptance, over-appetite risks, tracking risk over time, running a risk review, or reporting risk to the board — even if they don't say "NIST." Not for writing security policies, running a maturity assessment itself, or generic project risk logs.
Risk Register
Turn identified security risks into a tracked, scored, board-ready register aligned to NIST guidance — one that lives in a local file, remembers how it changed, and reports to both the team and the board. This skill does the parts a spreadsheet can't: wording risks so they're defensible, scoring them identically every time, tracking change with reasons, and translating the result into language a board acts on.
What "good" looks like here
A register earns its keep only if these are true, and each is where people usually fail:
- Risks are written as events, not topics. "Phishing" is a topic. "If employees are targeted by
credential-harvesting phishing, then stolen passwords enable account takeover" is a risk. The reason is that you cannot score or treat a topic — a topic has no likelihood and nothing to estimate an impact against. If-then is the CAC house format, and it carries the scenario elements NISTIR 8286A r1 §2.2 prescribes: asset, threat, vulnerability, impact. NIST does not prescribe the template — 8286A r1 asks for the four elements combined into a scenario, and 8286r1's own example is cause-and-effect prose. Earlier releases of this file said "8286 wants this if-then framing", which claimed more of the source than the source says. Always draft it for them.
And `vulnerability` there is wider than a scanner finding. 8286A r1's element is a condition that enables a threat event to occur, explicitly including planning gaps, training deficiencies, physical access and supply-chain conditions. A register that reads the word as unpatched software silently excludes every risk whose enabling condition is a process nobody owns — which is most of what a CSF gap import produces.
Enforced since v0.78.0, and it was only a documented precondition before that: add refuses without --description, and set-score refuses to re-score a risk that has none. The shape is not validated — no regex, no startswith("If"). Requiring the field is a record requirement; judging whether a human's sentence is a good risk statement is the tool deciding something a person should, and it would reject legitimate phrasings while passing anything from someone who worked out the rule.
Two deliberate exceptions, both about not breaking a working path. The import commands still create description-less rows — that is what provisionalTitle is for, and the sanctioned order is set-score to assess, then set-text to reword. And a register written before v0.78.0 still loads and renders unchanged: refusals guard writes, never loads, so an old risk with no event statement refuses on the next write that re-scores it rather than on the next time you open the file.
- Scoring is deterministic. Two people scoring the same risk must get the same band — so banding
is done by the script, never by eye. See Scoring.
- It's a living record, not a snapshot. The value compounds through change tracking: what moved,
when, and why. Every material change is logged. See Maintaining the register. The same record is what lets the register raise its own hand: escalations surfaces what worsened since the last review without anyone remembering to look — detection is automatic, action is not.
- The output speaks to its reader. A technical register bores a board; a board summary
frustrates an engineer. Generate both. Use ciso-board-translation for the executive layer.
The file is the source of truth
Everything persists in one local .rr file (JSON, schema v2): the risk data, an append-only change log, named review snapshots, theme definitions, and settings. A skill run is stateless; the file is the memory. Dashboards are generated on demand from the file, never stored in it (a rendered dashboard goes stale the instant a risk changes; the data and snapshots don't). Full model: references/schema.md.
Two core workflows
A — Build or update the register (add/score/treat risks). B — Run a risk review (the recurring ritual that surfaces what's stale or over appetite, captures decisions, snapshots, and reports to the board). Most sessions are one or the other. Workflow B is in references/history-and-review.md; the build workflow is below.
Build workflow
- [ ] 1. Set up: `init` — client, assessor, matrix size (default 5×5), appetite (default medium)- [ ] 2. Intake risks — from a CSF gap CSV (run the import) or elicited in conversation- [ ] 3. Draft each risk as an if-then event statement (`set-text` for imported ones);set owner, category, theme, response- [ ] 4. Assign inherent + residual likelihood × impact (1..matrixSize)- [ ] 5. Score with scripts/score_register.py — never band by hand- [ ] 6. Log every material change with a rationale; write the file back- [ ] 7. Report — heat matrix, dashboards, board summary — as needed
Step 2 — Intake
From a CSF gap assessment (common path). The nist-csf skill's export-gaps writes a gap CSV (subcategory_id, function_id, category_id, current_tier, target_tier, priority, subcategory_text, note). Map it to candidate risks:
# Preview first — --into alone writes nothing.python3 scripts/score_register.py import-gaps <gaps.csv> --into <existing.rr># Then apply.python3 scripts/score_register.py import-gaps <gaps.csv> --into <existing.rr> --write
Imported risks land unreviewed in two independent ways, each with its own flag, because each is cleared by a different act:
provisionalTitle— the title is still framework wording ("Identities … are managed", a
control objective phrased as a good thing). Cleared only by set-text. While set, board-facing renderers print a placeholder instead of the title.
provisionalScore— the scores are a seed off the gap's priority that nobody has assessed. Cleared
only by set-score.
Rescoring does not authorize the wording for a board, and rewording does not make the seeded numbers an assessment. Details: references/csf-import.md.
Seeds inherent scores from each gap's priority (critical→5, high→4, medium→3, low→2), carries the CSF subcategory as the dedupe key, and — with --into — updates matching risks instead of duplicating. Seeded scores are a starting point; refine with the user. Details: references/csf-import.md.
From conversation. No export? Elicit directly: for each concern, ask the asset, the threat/event, the consequence, what's in place today, and who owns it — then draft the event statement yourself.
Step 3–4 — Draft and rate (judgment)
Wording and rating are where you add value over a template:
- Inherent = before/without today's controls. Residual = with them working as described.
Residual should be below inherent wherever a real control exists; if they're equal, either the control is missing or the risk is being accepted — make that explicit (response.type: accept).
⚠️ They are not a permanent pair, and on a first assessment they are not one at all. NIST IR 8286r1: "On the first iteration… this may also be considered the initial assessment, whereas subsequent cycles refer to this as inherent." A register on its first pass is recording an initial assessment, and reading it as before-controls/after-controls asserts a relationship that pass has not established. Later cycles earn the word. The engine treats both fields identically either way — this is about what a board is told the comparison means. Full note in references/schema.md, Vocabulary.
- `residual` here is always the ACTUAL residual. NIST IR 8286r1 also uses *target residual
risk* — what a treatment is aiming at — and this register does not record one. If somebody arrives from the source expecting residual to be an aspiration, it is not.
- Record WHERE a risk came from, if you want to.
set-refsstores a plural list of free-text references — an ATT&CK technique ID, a CSF subcategory, an internal ticket. NIST IR 8286r1 §3.2.2 names MITRE ATT&CK™ as a threat-modelling technique that "provide[s] a knowledge base of adversarial tactics", and a CISO who enumerates threats that way produces risks the register could not previously attribute. It answers a board question — what did we look at to find these? — and it deliberately answers no more than that. Nothing is validated against any catalogue and nothing claims coverage: no matrix is bundled, no percentage is computed, no "techniques you have not considered" is reported. All three would need the matrix this field exists to avoid.
⚠️ Put references here, not in sourceRef or csfSubcategoryId. Both of those are merge_import matching keys, so a hand-typed technique ID in either would let a later import silently update an assessed risk instead of adding a new one.
- Record HOW you analysed it, not just what you concluded.
set-methodstores the
method's name, one of NIST's three analysis types, whether you followed it in full or in part, and — when in part — in what respect. NIST ties defensibility to the method: quantitative analysis "may provide defensible prioritization and treatment evidence for later analysis by executive leadership" (NIST IR 8286r1 §3.3.1). Without it, two registers scored by wholly different methods are byte-indistinguishable.
Not sure which method fits? suggest-method prints NIST's own selection criteria verbatim (IR 8286A r1 §2.3.1) beside the catalogue in references/analysis-methods.json. It writes nothing, ranks nothing and shortens nothing — every method is shown every time, because NIST is explicit that "there are benefits to both qualitative and quantitative risk analysis methodologies and even the use of multiple methodologies". --context changes which caution is attached to which entry, never which entries survive; with no --context it still proposes and names the criteria you left unstated, because the run that needs it most is the one where nothing has been recorded yet.
An unfamiliar method name is recorded, not refused. --name is free text: this tool holds no catalogue of every method a CISO might legitimately use, and refusing an unknown one would make it the arbiter of that. A name outside references/analysis-methods.json gets a note saying nothing here can check its prerequisites or quote NIST on it — and the record is written either way.
A declared method whose prerequisites are unmet escalates at `medium` — flag, never block. Two checks only: quantitative analysis with no currency recorded, and partial conformance with no deviation stated.
⚠️ Methods marked `external` in the catalogue — Monte Carlo, Bayesian, event tree, Open FAIR — escalate nothing AND are refused nothing about their conformance. Their real prerequisites live in the analyst's workbook and this toolkit cannot see it, so conformance and deviations are recorded but not checked: set-method will accept partial with no deviation stated and say nothing about it afterwards. The accepted cost is that an incomplete record goes unreported for those methods. The boundary is absolute on purpose — a boundary with an exception is a rule with a footnote, and "this tool says nothing about analysis it cannot see" has to survive being repeated to a third party.
Per risk, because a register commonly holds both — three risks somebody modelled with loss distributions and thirty scored by judgement in a workshop. settings.analysisMethodDefault covers the ordinary case, and a risk's own record outranks it in both directions: a register defaulting to quantitative must be able to say this one is qualitative because we have nothing to count.
⚠️ Never rename somebody else's method. A FAIR analysis without monetised loss is open-fair at conformance: partial with that deviation stated — not a coined "FAIR-lite". Renaming a licensed third-party standard to describe a reduced variant is a false claim about work that is not ours. The refusal says so.
Absent means not declared, never no method was used. Full model in references/schema.md.
- Band order ranks severity; it does not schedule work. NIST IR 8286r1: *"priority is not
necessarily a reflection of the chronological order in which risk should be mitigated."* A critical risk whose treatment waits on a system being replaced next quarter may legitimately be sequenced after a high one that closes this week. The register ranks, the plan sequences, and they are allowed to differ — as long as somebody can say why.
- Choose the response honestly:
transfer(e.g. insurance) moves financial loss but rarely reduces
likelihood or impact, so a transferred risk often stays over appetite. Don't let a response type flatter the residual.
- Set a
theme(the board-rollup axis) and areviewDate. Keep likelihood/impact within 1..matrixSize. - Accepting a risk requires structured acceptance — approver, justification, expiry,
re-validation date — not just a note. This is the audit-defensible layer (DORA RTS Art. 3(d), NYDFS §500). See references/schema.md → Structured acceptance.
Step 5 — Scoring (always use the script)
Never compute bands or over-appetite flags yourself — thresholds scale with matrix size and hand-banding drifts:
python3 scripts/score_register.py score <register.rr> # readable tablepython3 scripts/score_register.py score <register.rr> --json # scored JSON for renderingpython3 scripts/score_register.py self-test # verify engine parity anytime
--json adds inherentExposure/Band, residualExposure/Band, overAppetite, and a summary block. Feed it to the renderers in step 7.
A word about `exposure`, because this skill cites two documents that do not use the same one. exposure means likelihood × impact, and it is NIST IR 8286r1's word — "the combination of impact and likelihood is referred to as exposure." SP 800-30 Rev. 1, which this skill cites for its rating labels, calls the same quantity *level of risk*. They are aliases here, and they are not aliases in general: 800-30 Rev. 1 combines the two through Table I-2, a 5×5 lookup, and this tool multiplies. So level of risk names the same axis and a different calculation — which is why the description above says the labels are 800-30's and the arithmetic is CAC's own. Full note in references/schema.md, Vocabulary.
What the treatments cost
summary.treatmentCost totals response.cost and is what the board pack prints. Three things about it are deliberate:
- Open risks only. A closed risk's treatment is already paid for; counting it would
overstate what is still being asked for.
- `unpriced` always travels with the total. Six of nine risks priced reads very
differently from nine of nine, and the figure is a floor, not the bill. Both the script's own output and the board pack's label carry the denominator — a total without it is the false precision this toolkit refuses everywhere else.
- `settings.currency` is optional and never guessed. Set it at
init --currency GBP, or
later with set-currency --currency GBP --why '...', and the total renders with it; leave it and the number renders bare, labelled currency not recorded. A total shown in the wrong currency is worse than one shown in none, because only the second is obviously incomplete to whoever reads it. set-currency relabels and never converts — the amounts are the numbers somebody entered, and re-denominating them would be the tool deciding what a figure means.
- A treatment cost is a whole number, and `0` is a real answer.
--cost 0means *priced,
and the answer is nothing*; omitting --cost means nobody has priced it. The two render differently and the register keeps them apart. A negative is refused outright — it would reduce the board's total and there is no reading of it that is true. Entered wrongly at add, a cost is corrected with set-response, never by editing the file.
Step 6 — Maintaining the register (the core loop)
Every change follows the same discipline so the file stays canonical and its history stays intact: load → apply the change → append a history event → write back. Do this through the script's mutation commands rather than editing the JSON by hand — each one appends the history event and writes a schema-valid file for you, so append-only history and determinism are enforced by tooling, not by memory:
python3 scripts/score_register.py init <reg.rr> --client 'Acme Corp' --assessor 'CISO' \--matrix 5 --appetite medium --scope-note '...' --currency GBPpython3 scripts/score_register.py add <reg.rr> --title '...' \--description 'If <event>, then <consequence>' --il 4 --ii 5 --rl 2 --ri 4 \--category PR --owner '...' --theme identity --response mitigate --cost 45000 --why '...'python3 scripts/score_register.py set-text <reg.rr> <id> --title '...' --description '...' --why '...'python3 scripts/score_register.py set-response <reg.rr> <id> --cost 45000 --why '...'python3 scripts/score_register.py set-currency <reg.rr> --currency GBP --why '...'python3 scripts/score_register.py set-method <reg.rr> <id> --name 'OPEN FAIR' \--type quantitative --conformance partial \--deviations 'no monetised loss magnitude' --why '...'python3 scripts/score_register.py suggest-method [--context data-scarce,cost-constrained]python3 scripts/score_register.py set-refs <reg.rr> <id> --ref 'ATT&CK T1566.001' 'ID.RA-03' --why '...'python3 scripts/score_register.py set-score <reg.rr> <id> --residual L I --why '...'python3 scripts/score_register.py accept <reg.rr> <id> --approver '...' --justification '...' \--revalidate 2027-01-31 --expiry 2027-07-31 --why '...'python3 scripts/score_register.py confirm <reg.rr> <id> --why '...' --review 2027-05-31python3 scripts/score_register.py set-status <reg.rr> <id> closed --why '...'python3 scripts/score_register.py add-theme <reg.rr> --id third-party --name 'Third-Party & Supply Chain'python3 scripts/score_register.py set-theme <reg.rr> <id> third-party --why '...'python3 scripts/score_register.py snapshot <reg.rr> --label 'Q3 2026 Board Review' --note '...'python3 scripts/score_register.py set-escalation <reg.rr> --dwell-days 90 --why '...'python3 scripts/score_register.py export-csv <reg.rr> --out register.csv# 22 columns. `references` is multi-value and holds a NEWLINE between entries inside the# quoted cell — the house form for a multi-value column here, because the field is free text# and any printable separator could occur inside a value.
What the register raises on its own
Everything above needs somebody to type it. escalations is the one thing that does not:
python3 scripts/score_register.py escalations <reg.rr> --today 2026-07-31
Four triggers — a crossed band, sustained drift without a crossing, a long dwell over appetite, and a lapsed acceptance — each printed with the comparison that fired it. It exits 0 either way: this flags, it does not gate, and nothing downstream refuses to run because something escalated. Nothing is auto-rescored either; a lapsed acceptance does not move a residual, because residual is an assessment and reverting one on a date would invent one.
Thresholds are per register and travel inside snapshots. Tune them with set-escalation, which takes a --why and logs the change — a threshold that quietly rewrote which risks escalate would report a calmer quarter without a single risk having improved.
`revalidate` is deliberately not here. exceptions-register owns the acceptance lifecycle: re-validation as a recorded act, the DORA inventory, the whole clock. This skill keeps the lightweight marker and feeds it one-way through export-acceptances, which now names an expired acceptance on stderr and still exports it — a dead acceptance silently missing from the intake is worse than one that arrives flagged. Two homes for one clock is how the two homes come to disagree.
Material changes (score moves, acceptances, closures, confirmations) require --why — the rationale is what makes the log an audit trail and a board narrative rather than a bare diff, so always capture it from the user. Full rules, trend/velocity derivation, and the review workflow: references/history-and-review.md.
confirm records that a risk was reviewed and nothing changed — it resets the risk's confirmation age and moves no score, status or band. Use it instead of re-entering an identical score, which would log a score-changed event where no score changed. --review optionally books the next review date in the same breath, because that is the actual review-meeting workflow.
Two refusals worth knowing before you type them:
- Date flags take canonical `YYYY-MM-DD` only.
--review(onaddandconfirm) and
--revalidate / --expiry / --accepted (on accept) reject both 2027-2-01 and 20270201. Those fields are compared as plain strings downstream, so an unpadded date made an eight-month-overdue review render as on time. A register that already carries a non-canonical date still loads and renders — only new writes are refused.
- `confirm` and `accept` refuse while `provisionalScore` is set, because no affirming event may
attach to a score nobody has assessed. set-score is the way through: it affirms the number and clears the flag. A provisional title only warns. Both: references/schema.md.
Step 7 — Reporting
Generate on demand from the scored data:
- `.rr` file — the register as pretty JSON (schema v2). Portable source of truth.
- CSV — the register table for spreadsheets.
- Heat matrix + operational dashboard — dense working view (tiles, matrix, filterable table,
attention lists, owner load).
- Executive/board dashboard — themes, top risks with business-outcome translations, trend since
last snapshot, "what changed," decisions needed.
- PDF board report — cover, executive summary, residual heat map, register table, over-appetite
focus, footer stamp.
Generate the HTML with the renderers. Each one takes the register as an argument and derives everything — themes, trend, staleness, owner load — from it:
python3 renderers/render_dashboard.py <reg.rr> working-view.html --today 2026-07-26python3 renderers/render_board.py <reg.rr> executive.html --today 2026-07-26 --translations t.jsonpython3 renderers/render_report.py <reg.rr> board-report.html --today 2026-07-26 --translations t.json
--today sets the reference date every age and deadline is judged against, and defaults to today's date in UTC — the register's own history timestamps are UTC, and comparing them against a local date gave confirmations a negative age that read as fresh. Every artifact stamps the zone beside the date. --age-threshold DAYS (default 180) sets the confirmation-age band width; it is reporting furniture and rescores nothing. --translations supplies the board language from ciso-board-translation. Without `--translations` the narrative slots render as marked placeholders — never hand-write board prose into a renderer. Sidecar shape, the confirmation-age surfacing, and a worked example: references/dashboards.md and references/example-translations.json.
Dashboards are self-contained, CAC-branded HTML (tokens in assets/brand.md; layouts in references/dashboards.md and assets/report-layout.md). Deliver as files; persist board-facing ones as artifacts so they survive the conversation. Every deliverable carries the footer "A Cyber Aware Creation · Not affiliated with NIST."
The applicability profile (CAC-AP-1)
python3 $E score register.rr --context context.json
Optional, and absent is the normal case — a run without one behaves exactly as it always did and its output is byte-for-byte identical. The payload comes from business_context.py export <file.biz>; this skill reads it as data and imports nothing (§2.6).
What a profile narrows here is the question set, not the arithmetic. A risk is scored, banded and flagged against appetite identically whether it concerns OT or payroll. So what changes is which completeness questions this skill puts to you:
- OT scenarios — gated on
otPresent - AI scenarios — gated on
aiInUse
A flag declared false removes its question and records the skip with the flag, the declarer and the date, so an auditor can tell a question that was out of scope from one nobody asked (§2.4). A flag that is absent, or declared `null`, asks the question anyway — §2.2, absence asks more, because silently narrowing on undeclared data produces an assessment that looks complete and is not.
It asks; it does not answer. Nothing in a .rr records whether a risk concerns OT or AI: category is the CSF Function and theme derives from it. A coverage figure would be inferred from data that is not there, and this skill refuses to invent the number it asks for — the same rule that makes it demand an appetite band rather than guess. That is also why there is no conflict record here as there is in incident-materiality: a conflict needs both sides stated, and one side is missing.
A payload from another contract version, or one carrying no decision, is refused rather than ignored: --context was passed on purpose, and a silently un-narrowed run reads as a profile that decided nothing applied.
Board layer
For the executive summary, the theme narrative, the over-appetite story, the trend, and any "what do we tell the board" ask, invoke the `ciso-board-translation` skill rather than writing board language here. Pass it the scored summary, theme rollup, top risks, and the snapshot diff; drop its output into the executive dashboard and the PDF. Keeping that logic in one skill means every CAC tool tells the board story the same way — and it's the part a blank prompt can't reproduce.
Guardrails
- Not affiliated with NIST. Aligns to NISTIR 8286r1 and 8286A r1 (both **finalised 18
December 2025** — February 2025 was their initial public draft, not the revision; the earlier editions are withdrawn and differ substantively), SP 800-30 Rev. 1 and CSF 2.0 — not endorsed by NIST. Say so; never imply certification. Where this suite's format is its own rather than NIST's, it says so: see the if-then note above.
- Structure, not data exfiltration. Everything runs locally on the risks the user provides. Never
suggest uploading a client's register anywhere.
- Append-only history. Never rewrite or delete past history events — that's what keeps the log
defensible.
- Don't invent risks, scores, or rationales to fill space. A tight register of real, well-worded,
honestly-scored risks beats a padded one.
Rendering under a client brand
Every renderer takes --brand FILE:
python3 renderers/render_board.py analysis.json report.html --brand northwind.json
{"ink": "#101820", "muted": "#5A4436", "patina": "#C0701F", "bg": "#FAF7F2","measure": "#8A4B12", "measureTrack": "#EFE0D2", "patinaText": "#8A4B12","wordmark": "Northwind Group", "mark": "Northwind", "whiteLabel": true}
It is refused rather than approximated. A palette that leaves body text on the dark band below 4.5:1, or the patina kicker on the dark band below 4.5:1, is rejected with every failing pairing named — not the first, and not silently nudged into range. whiteLabel drops the maker's name and keeps the "Not affiliated with NIST" line, because one says who built the document and the other is a statement about the world.
What does not follow the brand, deliberately: the RAG status ramp. Red/amber/green is a contract with the reader about severity, not styling the client is buying. Only the shell — ink, muted, background, patina, and the steps derived from them — moves.
Reference files
references/schema.md— full data model (risks, themes, acceptance, history, snapshots), taxonomy,
matrix sizes, band thresholds, confirmation age and the age-affirming event taxonomy, the canonical date rule, v1→v2 migration.
references/history-and-review.md— the maintain loop, change-log rules, trend/velocity, and the
risk-review workflow (workflow B).
references/dashboards.md— operational and executive dashboard specs, heat matrix, theme rollup,
trend charts.
references/csf-import.md— CSF gap-CSV contract, priority seeding, dedupe behavior.references/example-register.rr— worked 20-risk register (v1; import/migration + scoring fixture).examples/example-register-v2.rr— worked v2 register with themes, structured acceptance, change
history, and a snapshot. The few-shot for the full model.
references/example-gaps.csv— sample CSF gap export for testing import.references/example-translations.json— workedciso-board-translationsidecar; the--translations
contract for the renderers.
assets/brand.md— Cyber Aware Creations palette, fonts, CVD-safe risk-band colors.assets/report-layout.md— the board PDF report structure.scripts/score_register.py— scoring, summary, CSF import, and persistence. Every command,
so this list can be checked against COMMANDS rather than trusted:
- read —
score,escalations,export-csv,export-acceptances,self-test - intake —
init,import-gaps,import-findings - mutate a risk —
add,set-text,set-score,set-response,set-status,accept,
confirm, set-theme
- mutate the register —
add-theme,set-currency,set-escalation,snapshot
All append-only-history and schema-safe. Standard library only; self-test verifies parity with the reference engine, and asserts that every command either declares the flags it accepts or is named in the shrink-only _FLAGS_UNDECLARED list.
renderers/—render_dashboard.py(operational working view),render_board.py(executive board
dashboard), render_report.py (printable board report), over a shared _common.py derivation layer. All three take the register path as an argument; nothing about a client is hardcoded.