version: "1.0.0" name: "duration-prediction" description: "Predict project duration using k-NN and regression. Estimate timeline based on similar historical projects." homepage: "https://datadrivenconstruction.io" metadata: {"openclaw": {"emoji": "🤖", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
Duration Prediction
Business Case
Problem Statement
Project duration estimation challenges:
- Subjective expert estimates
- Lack of historical benchmarking
- Inaccurate early-stage predictions
- Difficulty comparing similar projects
Solution
Machine learning-based duration prediction using k-Nearest Neighbors and regression models trained on historical project data.
Technical Implementation
python
import pandas as pdimport numpy as npfrom typing import Dict, Any, List, Optional, Tuplefrom dataclasses import dataclass, fieldfrom datetime import datefrom enum import Enumimport mathclass ModelType(Enum):KNN = "knn"LINEAR_REGRESSION = "linear_regression"WEIGHTED_KNN = "weighted_knn"class ProjectType(Enum):OFFICE = "office"RESIDENTIAL = "residential"INDUSTRIAL = "industrial"RETAIL = "retail"HEALTHCARE = "healthcare"EDUCATION = "education"@dataclassclass ProjectFeatures:project_id: strproject_type: ProjectTypesize_sf: floatfloors: intcomplexity: int # 1-5location_factor: float # Cost adjustment factorhas_basement: bool = Falseis_renovation: bool = Falseactual_duration: Optional[int] = None # Days@dataclassclass PredictionResult:predicted_duration: intconfidence_interval: Tuple[int, int]similar_projects: List[str]model_used: ModelTypefeatures_importance: Dict[str, float]class DurationPredictor:"""Predict project duration using ML techniques."""def __init__(self):self.training_data: List[ProjectFeatures] = []self.feature_weights: Dict[str, float] = {'size_sf': 0.30,'floors': 0.15,'complexity': 0.25,'location_factor': 0.10,'has_basement': 0.10,'is_renovation': 0.10}self.type_baseline_days: Dict[ProjectType, Dict[str, float]] = {ProjectType.OFFICE: {'base': 300, 'per_1000sf': 0.5},ProjectType.RESIDENTIAL: {'base': 240, 'per_1000sf': 0.4},ProjectType.INDUSTRIAL: {'base': 180, 'per_1000sf': 0.3},ProjectType.RETAIL: {'base': 200, 'per_1000sf': 0.35},ProjectType.HEALTHCARE: {'base': 400, 'per_1000sf': 0.6},ProjectType.EDUCATION: {'base': 320, 'per_1000sf': 0.45}}def add_training_project(self, project: ProjectFeatures):"""Add project to training dataset."""if project.actual_duration is not None:self.training_data.append(project)def load_training_data(self, df: pd.DataFrame):"""Load training data from DataFrame."""for _, row in df.iterrows():project = ProjectFeatures(project_id=str(row['project_id']),project_type=ProjectType(row['project_type'].lower()),size_sf=float(row['size_sf']),floors=int(row['floors']),complexity=int(row['complexity']),location_factor=float(row.get('location_factor', 1.0)),has_basement=bool(row.get('has_basement', False)),is_renovation=bool(row.get('is_renovation', False)),actual_duration=int(row['actual_duration']))self.add_training_project(project)def _extract_features(self, project: ProjectFeatures) -> np.ndarray:"""Extract feature vector from project."""return np.array([project.size_sf / 10000, # Normalize to 10k SFproject.floors,project.complexity,project.location_factor,1 if project.has_basement else 0,1 if project.is_renovation else 0])def _calculate_distance(self, features1: np.ndarray,features2: np.ndarray) -> float:"""Calculate weighted Euclidean distance."""weights = np.array(list(self.feature_weights.values()))diff = (features1 - features2) ** 2weighted_diff = diff * weightsreturn math.sqrt(np.sum(weighted_diff))def _find_k_nearest(self, target: ProjectFeatures, k: int = 5,same_type: bool = True) -> List[Tuple[ProjectFeatures, float]]:"""Find k nearest neighbors."""target_features = self._extract_features(target)distances = []for project in self.training_data:if same_type and project.project_type != target.project_type:continueproj_features = self._extract_features(project)distance = self._calculate_distance(target_features, proj_features)distances.append((project, distance))distances.sort(key=lambda x: x[1])return distances[:k]def predict_knn(self, target: ProjectFeatures, k: int = 5) -> PredictionResult:"""Predict duration using k-NN."""nearest = self._find_k_nearest(target, k)if not nearest:# Fall back to baselinereturn self._predict_baseline(target)# Simple average of k nearestdurations = [p.actual_duration for p, _ in nearest]predicted = int(np.mean(durations))# Confidence interval (using std dev)std = np.std(durations)lower = int(predicted - 1.96 * std)upper = int(predicted + 1.96 * std)return PredictionResult(predicted_duration=predicted,confidence_interval=(max(1, lower), upper),similar_projects=[p.project_id for p, _ in nearest],model_used=ModelType.KNN,features_importance=self.feature_weights)def predict_weighted_knn(self, target: ProjectFeatures, k: int = 5) -> PredictionResult:"""Predict duration using distance-weighted k-NN."""nearest = self._find_k_nearest(target, k)if not nearest:return self._predict_baseline(target)# Inverse distance weightingtotal_weight = 0weighted_sum = 0for project, distance in nearest:weight = 1 / (distance + 0.001) # Add small value to avoid division by zeroweighted_sum += project.actual_duration * weighttotal_weight += weightpredicted = int(weighted_sum / total_weight)# Confidence intervaldurations = [p.actual_duration for p, _ in nearest]std = np.std(durations)lower = int(predicted - 1.96 * std)upper = int(predicted + 1.96 * std)return PredictionResult(predicted_duration=predicted,confidence_interval=(max(1, lower), upper),similar_projects=[p.project_id for p, _ in nearest],model_used=ModelType.WEIGHTED_KNN,features_importance=self.feature_weights)def predict_regression(self, target: ProjectFeatures) -> PredictionResult:"""Predict duration using linear regression."""if len(self.training_data) < 3:return self._predict_baseline(target)# Filter by project typesame_type = [p for p in self.training_data if p.project_type == target.project_type]if len(same_type) < 3:same_type = self.training_data# Build feature matrix and target vectorX = np.array([self._extract_features(p) for p in same_type])y = np.array([p.actual_duration for p in same_type])# Simple linear regression using normal equationsX_with_intercept = np.column_stack([np.ones(len(X)), X])try:# beta = (X'X)^-1 X'yXtX = X_with_intercept.T @ X_with_interceptXtX_inv = np.linalg.inv(XtX)beta = XtX_inv @ X_with_intercept.T @ yexcept np.linalg.LinAlgError:return self._predict_baseline(target)# Predicttarget_features = self._extract_features(target)target_with_intercept = np.array([1] + list(target_features))predicted = int(target_features @ beta[1:] + beta[0])# Calculate residuals for confidence intervaly_pred = X_with_intercept @ betaresiduals = y - y_predrmse = math.sqrt(np.mean(residuals ** 2))return PredictionResult(predicted_duration=max(1, predicted),confidence_interval=(max(1, int(predicted - 1.96 * rmse)),int(predicted + 1.96 * rmse)),similar_projects=[p.project_id for p in same_type[:5]],model_used=ModelType.LINEAR_REGRESSION,features_importance=dict(zip(self.feature_weights.keys(),[abs(b) / sum(abs(beta[1:])) for b in beta[1:]])))def _predict_baseline(self, target: ProjectFeatures) -> PredictionResult:"""Fall back to baseline prediction."""baseline = self.type_baseline_days.get(target.project_type,{'base': 250, 'per_1000sf': 0.4})predicted = int(baseline['base'] +(target.size_sf / 1000) * baseline['per_1000sf'] * 30)# Adjustmentsif target.complexity > 3:predicted = int(predicted * (1 + (target.complexity - 3) * 0.1))if target.has_basement:predicted = int(predicted * 1.1)if target.is_renovation:predicted = int(predicted * 1.2)predicted = int(predicted * target.location_factor)return PredictionResult(predicted_duration=predicted,confidence_interval=(int(predicted * 0.8), int(predicted * 1.2)),similar_projects=[],model_used=ModelType.LINEAR_REGRESSION,features_importance=self.feature_weights)def predict(self, target: ProjectFeatures,model: ModelType = ModelType.WEIGHTED_KNN,k: int = 5) -> PredictionResult:"""Predict duration using specified model."""if model == ModelType.KNN:return self.predict_knn(target, k)elif model == ModelType.WEIGHTED_KNN:return self.predict_weighted_knn(target, k)elif model == ModelType.LINEAR_REGRESSION:return self.predict_regression(target)return self._predict_baseline(target)def evaluate_model(self, test_data: List[ProjectFeatures],model: ModelType = ModelType.WEIGHTED_KNN) -> Dict[str, float]:"""Evaluate model performance."""actuals = []predictions = []for project in test_data:if project.actual_duration is None:continueresult = self.predict(project, model)actuals.append(project.actual_duration)predictions.append(result.predicted_duration)if not actuals:return {}actuals = np.array(actuals)predictions = np.array(predictions)mae = np.mean(np.abs(actuals - predictions))mape = np.mean(np.abs((actuals - predictions) / actuals)) * 100rmse = math.sqrt(np.mean((actuals - predictions) ** 2))return {'mae': round(mae, 1),'mape': round(mape, 1),'rmse': round(rmse, 1),'samples': len(actuals)}def get_similar_projects(self, target: ProjectFeatures, n: int = 10) -> pd.DataFrame:"""Get most similar projects."""nearest = self._find_k_nearest(target, k=n, same_type=False)data = [{'Project ID': p.project_id,'Type': p.project_type.value,'Size (SF)': p.size_sf,'Floors': p.floors,'Complexity': p.complexity,'Duration (days)': p.actual_duration,'Distance': round(d, 3)} for p, d in nearest]return pd.DataFrame(data)
Quick Start
python
# Create predictorpredictor = DurationPredictor()# Add training datatraining_projects = [ProjectFeatures("P001", ProjectType.OFFICE, 50000, 10, 3, 1.0, True, False, 365),ProjectFeatures("P002", ProjectType.OFFICE, 75000, 15, 4, 1.1, True, False, 450),ProjectFeatures("P003", ProjectType.OFFICE, 30000, 5, 2, 0.9, False, False, 280),ProjectFeatures("P004", ProjectType.OFFICE, 60000, 12, 3, 1.0, True, False, 390),]for p in training_projects:predictor.add_training_project(p)# Predict for new projectnew_project = ProjectFeatures(project_id="NEW-001",project_type=ProjectType.OFFICE,size_sf=55000,floors=11,complexity=3,location_factor=1.0,has_basement=True,is_renovation=False)result = predictor.predict(new_project, ModelType.WEIGHTED_KNN)print(f"Predicted duration: {result.predicted_duration} days")print(f"Confidence interval: {result.confidence_interval}")print(f"Similar projects: {result.similar_projects}")
Common Use Cases
1. Compare Models
python
knn_result = predictor.predict(new_project, ModelType.KNN)weighted_result = predictor.predict(new_project, ModelType.WEIGHTED_KNN)regression_result = predictor.predict(new_project, ModelType.LINEAR_REGRESSION)print(f"k-NN: {knn_result.predicted_duration}")print(f"Weighted k-NN: {weighted_result.predicted_duration}")print(f"Regression: {regression_result.predicted_duration}")
2. Model Evaluation
python
metrics = predictor.evaluate_model(test_data, ModelType.WEIGHTED_KNN)print(f"MAE: {metrics['mae']} days")print(f"MAPE: {metrics['mape']}%")
3. Find Similar Projects
python
similar = predictor.get_similar_projects(new_project, n=5)print(similar)
Resources
- DDC Book: Chapter 4.5 - Future: Predictions and Machine Learning
- scikit-learn: https://scikit-learn.org/
- Website: https://datadrivenconstruction.io