Skill v1.0.0
currentAutomated scan100/100name: simple-first-building description: > GOVERNING skill of the library: the simple-first principle and its German civil-law machinery. Default every building decision to the simplest proven solution at the agreed standard tier; escalate complexity only on explicit client request. Owns the § 633 BGB three-step defect test, the implied promise of "allgemein anerkannte Regeln der Technik" (aarRdT), the DIN presumption and its rebuttal, lawful downward deviation ("Beschaffenheitsvereinbarung nach unten", Beweislast, insurance exclusion, Gleichwertigkeit/Unverhältnismäßigkeit), liability through the Kauf-/Miet-kette, Gebäudetyp E (BGB-Eckpunkte Nov 2025, what is/isn't relaxed, the public-vs-private trap), and the Bavaria/Hamburg/Schleswig-Holstein pilot standards with their numbers. Provides the complexity ladder every other skill defaults to and the contract checklist that makes "einfach bauen" legally survivable. metadata: version: "1.0.0"
Simple-First Building — Governing Principle & Civil-Law Machinery
This skill governs how every other skill in the library is applied. Read itfirst in any new project. Its core rule: **the first design answer is the simplestproven one; demanding construction is an explicit, priced, documented decision —never a default.**
0. The two problems this skill solves
(1) Cost/complexity drift. German building is expensive partly because two independent legal engines push standards upward without anyone deciding to:
- Public law: Landesbauordnungen + incorporated technical Baubestimmungen set
growing requirements.
- Civil law (the silent engine): BGH case law treats planners/contractors as
impliedly promising ("stillschweigend zugesichert") the usual quality/comfort standard of comparable, contemporaneously completed buildings and the allgemein anerkannten Regeln der Technik (aarRdT) — so every designer plans defensively high to avoid later Haftungsvorwürfe ("lieber mit zu hohen Standards geplant"). Rising standards therefore = defensive over-engineering, embedded in private law, invisible to the client's budget conversation.
(2) The mirror risk — "simplification ≠ safety collapse". A design culture of simplicity that quietly under-builds gets destroyed by the same machinery: an aarRdT-deviation without proper agreement is an automatic Mangel even with zero symptoms. This skill's job is to let simplicity be chosen knowingly and lawfully, upward or downward, instead of either drifting up by default or dropping down by accident.
Timeline of the political answer (status knowledge — re-verify before use): 2022 "Gebäudetyp e" initiative (Bayerische Architektenkammer; "e" = einfach/ experimentell) → 2024 Referentenentwurf → Nov 2024 "Gebäudetyp-E-Gesetz" draft (BT-Drs. 20/13959) — failed with the end of the Wahlperiode → 05.05.2025 coalition agreement safeguards Gebäudetyp E → Nov 2025 BMJV + BMWSB "Gemeinsame Eckpunkte Gebäudetyp E" (civil-law amendments to the BGB Bauvertragsrecht; § 6 of D). Legislative status must be checked current [VERIFY before relying].
1. THE COMPLEXITY LADDER — simple first, per discipline
1.1 The gate rule
For every design axis below, the library's default answer is Level 0. Moving up a level requires all three:
- an explicit client wish (named in the program of requirements / contract —
not inferred from "quality expectations"),
- a cost and schedule impact statement to the client before commitment
(rough figures below; market-dependent [VERIFY per project]),
- where the escalation changes structural physics, **a design review against the
owning skill** (e.g. wide spans → structural-systems/structural-analysis).
Moving down below the usual standard/aarRdT requires the § 3 machinery (documented downward Beschaffenheitsvereinbarung) — public-law permission is not enough (§ 2.6 central trap).
1.2 Escalation axes, defaults and triggers
| # | Axis | Level 0 default (simple & proven) | Escalations (only on explicit wish) | Typical impact of leaving L0 | Owning skill for detail | |
|---|---|---|---|---|---|---|
| A1 | Geometry | compact rectangle, one volume, gable or shed roof, no split levels | L/U shape, cantilevers, Kink, Staffel, split-level, Sonderform | each bend of the envelope ≈ +5–15 % KG300/400 (α = A/V worsens; see building-physics compactness bands) [VERIFY project] | building-typology, construction-detailing | |
| A2 | Storeys/basement | Erdgeschoss + 1–2 OG on slab, no UG; Kellerverzicht as default question | full UG, partial UG with reduced ceiling, Tiefgarage | UG ≈ +300–600 €/m² NF vs. slab solution; Hamburg pilot: Verzicht on UG/Fassade/Aussenanlagen alone ≈ 1,000 €/m² (§ 6.2) | geotechnics-foundations, cost-management-din276 | |
| A3 | Structure | loadbearing masonry + precast or RC floor slabs on simple grid (spans ≈ 3.5–6.5 m), standard footings | wide spans, flat decks, point supports, long cantilevers, exposed concrete, timber hybrid on non-standard grid, special systems (Aussteifungskern variants beyond standard) | flat deck/cantilever premium on KG300–302 ≈ 10–30 % + detailing risk; every jump = full EC2/EC5/EC6 re-check | structural-systems, concrete-detailing, masonry-construction, timber-steel-design | |
| A4 | Envelope | monolithic or masonry + WDVS, standard Putz surface | ventilated RVS, Naturstein, Sonderbeschichtungen, memory/special formats, double skin | RVS ≈ +80–200 €/m² WNF; specialisation raises both cost and execution-error surface (§ 1.4 "Komplexitätssteuer") | construction-detailing, building-materials | |
| A5 | Roof | pitched, standard tile/small-form, simple geometry, no dormers | flat roof (+ strict DIN 18195/18531 regime), Gründach, Photovoltaik-Integration, Faltungen, Dachfenster instead of Gaupen | flat-roof build-up cost ≈ 1.5–2× pitched per m² and higher maintenance; every fold = detail + water risk | roofing-waterproofing | |
| A6 | Openings | series-typical window sizes, standard turn-tilt, no special formats | large glass, Hebe-Schiebe, Sonderformen, brandabschnitte doors, special shading | lifting equipment + statik + Einbruch/Brandschutz consequences; U-Wert/Glas cost non-linear from ≈ 2.5 m width [VERIFY] | openings-windows-doors | |
| A7 | Stairs/circulation | straight single-flight or standard U-flight, off-the-shelf landing | spindless winding, freitragend, Balustradensonderlösungen, Raumspartreppe | bespoke stairs ≈ 2–4× series price; every special statics case needs its own calc | stairs-vertical-circulation | |
| A8 | Services (TGA) | heat pump + FBH (or simplest compliant heating per GEG), window ventilation, standard electrical per DIN 18015 | additional Lüftungsanlage (only where Schallschutz/BSK/airtightness logic demands it), Kälte, RWA beyond requirement, full AVS, smart building, dezentrale WL | each added system ≈ +1.5–4 % total cost + maintenance annuity; Bayern pilot ran WITHOUT Lüftung in multi-storey (§ 6.1) — proof of L0 feasibility with agreed comfort | building-services-tga | |
| A9 | Comfort tiers (vereinbar!) | normaler Standard: DIN 4109-1 Mindestschallschutz, DIN 18040-2 (barrier-reduced where funding demands), standard room heights 2.50–2.70 m | erhöhter Schallschutz (Exec), gehobene Ausstattung, Raumhöhe ≥ 2.80, Wellness-/Sonderbereiche | tier choice = the FIRST cost lever; note the tier also re-anchors which aarRdT are owed (§ 2.3) | building-acoustics, accessibility-universal-design | |
| A10 | Water/site | surface drainage to street per Satzung, standard versickerungsfrei | Retention/Zisterne, Schwammstadt-Bausteine, begrüntes Versickerungsmodell, grauwasser | each ≈ four- to five-figure € + Pflegevertrag; often B-Plan-driven (then not optional) | construction-scheduling-site, building-regulations-permits | |
| A11 | Process/delivery | one-off craft execution, classical Hochbau plan | serielles Bauen/Typologie, Typengenehmigung, Taktplanung, BIM full-LoIN, AVP generalplanerisch | serialisation amortises the § 3 documentation effort across N objects; single-object = keep documentation lean | construction-scheduling-site, bim-management |
Reading the ladder: a "simple" house (EFH/DHH at L0 across all axes) is not a lesser building — it is the compact rectangle on a slab, masonry + WDVS, tiled gable roof, series windows, straight stairs, heat-pump + FBH, normal tier, surface-drained, one-off delivery. Every departure from that description is a named, priced decision. Put the ladder in the client conversation at Leistungsphase 1–2, not at detail design.
1.3 Simplicity checks the ladder must pass
Before proposing L0, verify it is actually sufficient (function governs, § 2.2):
- site loads/water →
geotechnics-foundations(a WU slab where groundwater demands
it IS the simple solution; "schwarze Wanne" then needs § 3.6 machinery, not a shrug);
- span needs →
structural-systems(L0 grid must fit the program; forcing L0
geometry onto a program that needs spans manufactures complexity later at worse cost);
- fire/egress →
fire-protection-building(Gebäudeklasse thresholds are hard
gates: L0 MFH ≠ L0 EFH — GK 4/5 add second routes, Wände, Bekleidungsklassen);
- acoustics floor →
building-acoustics(DIN 4109 minimum is aarRdT; anything
below needs § 3 machinery);
- energy floor → current GEG requirements are law; "simple" never means "below GEG"
unless the client accepts it as a contracted tier statement (see § 3, and note Typ-E proposals anchor exactly at the Länder Baubestimmungen).
1.4 Komplexitätssteuer — hidden cost of every extra level
Complexity taxes: more trades with mutual interfaces (Schnittstellen = where the BGH sees coordination defects), more unique details = more abZ/Ingenieurtext surface, longer coordination, higher execution-error probability, maintenance annuity. Rule of thumb for client conversation: each non-L0 axis multiplies the number of failure-relevant junctions ≈ +1–3 per axis on top of the price delta. Process speed (Hamburg field 3: ≈ 400 €/m², § 6.2) is available to everyone without touching standards — exhaust it before buying complexity.
1.5 When complexity pays — legitimate escalations
Escalation is right when L0 fails a hard constraint or the client's explicit programme demands otherwise: poor soil + no UG (mat vs pile → geotechnics), B-Plan wall-height/roof-band conflicts resolved by flat-roof variants, Innenbereichsschutz noise forcing Lüftungsanlage instead of open windows (building-services-tga), accessibility programme (DIN 18040-1 lifts), heritage or city-representative façade. Document WHY (a one-paragraph Entwurfsbegründung per escalated axis) — it is the cheapest liability insurance and the input for § 3.4 templates.
2. CIVIL-LAW DEFAULT MECHANICS — what "built simply" legally means
2.1 § 633 BGB three-step defect test
Mangel = Ist-Beschaffenheit negatively deviates from Soll-Beschaffenheit. Assessment order (§ 633 Abs. 2 S. 2 BGB):
- vereinbarte Beschaffenheit — express agreement dominates absolutely
(including an agreed standard label: "einfach"/"normal"/"gehoben").
- Eignung für die nach dem Vertrag vorausgesetzte Verwendung — fitness for
the contractually presupposed purpose.
- gewöhnliche Verwendung + übliche Beschaffenheit — ordinary-use fitness
PLUS "quality the customer of works of the same kind can expect."
Interpretation via the whole contract body (BGH NJW 2012, 518); public procurement = objective bidder view (BGH NZBau 2014, 185) and a silent LV may be supplementally construed against the bidder (BGH NZBau 2002, 324).
2.2 The functional concept — why specs never exhaust duty
The contractor always owes a working result for the recognised purpose — independently of wording. Bridge case (→ § 5.1): agreed Tragfähigkeit formally met, contractor knows heavy vehicles will cross → Mangel despite spec-conformity. Contractor's exit: advise, offer sufficient design against Nachtrag; if the informed client insists → freed of liability to that extent. Compliance with aarRdT does NOT immunise against the functional test (BGH NJW-RR 2011, 1240); the two limbs coexist: functionally deficient work = mangelhaft even if DIN-perfect; aarRdT-deficient work = mangelhaft even if presently functional.
2.3 aarRdT — the impliedly owed minimum
- Definition (OLG Hamm NZBau 2020, 29; consensus): technical rules for
Entwurf/Ausführung that are (i) scientifically recognised ("wissenschaftliche Durchdringung"; no fundamental Meinungsstreit) AND (ii) proven in practice ("praktische Bewährung"), durchweg known among and accepted by the "Träger der Praxis". Exist even without a written rule (BGH NJW-RR 1995, 472); unwritten ones count (BGH NJW 2014, 620).
- Gradient ladder: aarRdT (scientifically accepted + proven — the civil
minimum) < Stand der Technik (highest currently feasible; no proof needed) < Stand von Wissenschaft und Technik (newest science; e.g. § 7 Abs. 2 Nr. 3 AtG). Only the middle floor is impliedly owed; higher floors only if expressly agreed.
- Implied promise (BGH NJW 2013, 1226; NJW-RR 2011, 1240): the customer may
redlich expect the Qualitäts-/Komfortstandards of comparable, contemporaneously completed and accepted buildings; the contractor "sichert diesen Standard üblicherweise stillschweigend zu". Consequence in VII. Zivilsenat doctrine: every deviation = Mangel, automatically.
- Tier relativity: which aarRdT are owed follows the agreed/interpretable
standard tier — "gehobener Standard" → its rules; "normaler Standard" → correspondingly (BGH NJW 1998, 2814; VII ZS BauR 2024, 1725, 1726). The contractual tier label is therefore the first cost lever — choose it explicitly.
- Defect without damage: mere deviation suffices — no symptoms needed.
Schaufenster case: execution "das Risiko eines Schadens in sich birgt" = Mangel (BGH NJW 1981, 2801); confirmed OLG Stuttgart NJW-RR 2023, 1317 (aarRdT breach + Schadensneigung = Mangel ohne Mangelsymptome). Durability proxies actionable (asphalt deck: ~16 y usual life; shortened = Mangel even if extent unquantifiable → § 5.3).
- Systemic rationale: warranty 5 y (§ 634a Abs. 1 Nr. 2 BGB) / 4 y
(§ 13 Abs. 4 S. 1 VOB/B) vs > 60 y real service life — aarRdT compliance is the proxy that keeps buildings usable beyond the warranty window. A defect surfacing in year 10 is time-barred; the rules exist precisely to prevent year-7 disasters.
- Timing: decisive = state of aarRdT at Abnahme; mid-project rule changes
shift the owed standard, contractor must instruct, client decides, adaptation earns Mehrvergütung (BGH NJW 2018, 391). Keep a rule-change radar on long projects.
- BGB vs VOB/B: VOB/B writes it down (§ 4 Abs. 2 Nr. 1 S. 2 — duty already
during execution; § 13 Abs. 1 — defect definition includes aarRdT at Abnahme). Pure BGB has no express clause — yet aarRdT are owed identically via the implied promise. Cumulative minimum: agreed Beschaffenheit + function + aarRdT (tier-matched) + übliche Beschaffenheit of Zeitgebäude.
- Critique noted for honesty: some doctrine would limit the implied promise
to safety standards (Standsicherheit, Brandschutz, Feuchteschutz, ggf. Schallschutz — Zöller 2024, 443 [IBR/BauR pages vary, VERIFY]); comfort vs safety may not be cleanly separable (BeckOK/Voit). Leupertz: Schallschutz and "Anzahl Steckdosen" are verhandelbarer Komfortstandard — "sollte vertraglich vereinbart werden", not litigated after the fact.
2.4 The DIN presumption — and its rebuttal
- Written vehicles that can carry aarRdT: DIN (incl. VOB Teil C), Einheiten
Technische Baubestimmungen (ETB, via Institut für Bautechnik), VDI-Richtlinien, VDE, Flachdachrichtlinien. Scale: > 3,300 private technical norms already in 2015 (BMU/Baukostensenkungskommission) — unüberblickbar; this mass is itself the reason full downward deviation agreements are doctrinally "kaum rechtssicher darstellbar" (Popescu BauR 2024, 1585, 1589; Leupertz BauR 2025, 378).
- Prevailing construction-law view: widerlegliche Vermutung that DIN reflect
aarRdT → breach of DIN → defect PRESUMED → with the implied promise this produces "DIN-Hörigkeit": over-satisfying feels safer than under-satisfying — the engine of defensive over-standardisation.
- Foundation cases: BGHZ 103, 338 (341 f.) — DIN are anerkannte Regeln;
breach in excavation support → presumption of causation for neighbour damage (defendant must prove the damage would have occurred anyway — in tort the presumption doubles); OLG Hamm NJW-RR 1995, 17: "tatsächliche, jederzeit widerlegbare Vermutung", but the concept übersteigt DIN (DIN subordinate); OLG Brandenburg NJW-RR 2009, 1468: regional craft practice "im Norden" cannot remove the defect — not DIN-gerecht ⇒ aarRdT disregarded; client may demand "sichere Gewähr der Ordnungsmäßigkeit". DIN 820-1 (2022-12) Ziff. 8.1 self-describes: norms must first establish themselves as aarRdT; only sicherheitstechnische Festlegungen carry a concrete Vermutung of Fachgerechtigkeit.
- THE SENATE CONFLICT: the VII. Zivilsenat des BGH (competent for
Werkvertrags-/Architektenrecht) states no such Vermutung exists — DIN are private "technische Regelungen mit Empfehlungscharakter" (Stellungnahme on the Typ-E draft, BauR 2024, 1725, 1727). Older presumption cases came from other senates/divisions and non-construction matters. Plan around the worse case (presumption alive) until legislation settles it.
- Rebuttal evidence that worked: OLG Hamm NZBau 2020, 29 — DIN 4109 sound
values presumed aarRdT but rebutted: where wirtschaftlich akzeptable, aarRdT-conforming Bauweisen reach 63/67 dB, fixed private-rule Schalldämm-Maße are not aarRdT; sound requirements are "dynamisch". Newer softening: OLG Düsseldorf IBR 2025, 280 (Vermutung not "in allen Fällen"); OLG Brandenburg IBR 2026, 60 (rebutted where neither function nor appearance impaired); NJW 2024, 839 (no actionable breach without Gebrauchsnachteile). Critique of procedure: closed-door committee work, manufacturer capture (Ritter-Höll/Vogel BauR 2019, 1681 ff.; Steffen NJW-Spezial 2023, 492); 10. Deutscher Baugerichtstag (Mai 2025, Hamm; Thesen BauR 2025, 18 ff., AK V/VI) demands transparent standardisation.
2.5 Public-law permission ≠ civil-law compliance
Compliance with aarRdT is owed "unabhängig davon, ob öffentlich-rechtlichgeringere Anforderungen … gestellt werden" — a publicly permitted, usablebuilding can still be mangelhaft (appellate ruling on § 13 Nr. 1 VOB/B (2006)in that tradition [court unnamed in material, VERIFY]).
This is the axis on which every "simple building" programme (Befreiungen, pilot standards, Typ E) must be read: see § 4.5 central trap.
2.6 Defenses menu when an "einfach" build is attacked
Contractor/planner facing an aarRdT-based claim (in practice the only three exits):
- prove an effective downward Beschaffenheitsvereinbarung (§ 3);
- prove Gleichwertigkeit — execution achieves the functionally equivalent
result by other means (the OLG Hamm 63/67 dB logic inverted: show the better or equal economical construction was used);
- Unverhältnismäßigkeit of cure (§ 635 Abs. 3; BGH NJW-RR 2015, 1300;
OLG Düsseldorf IBR 2021/3, 125) — a defense, never a design strategy.
3. DEVIATING DOWNWARD, LAWFULLY — the "Beschaffenheitsvereinbarung nach unten"
3.1 Doctrine
Downward deviation from (a) the übliche Qualitäts-/Komfortstandards of Zeitgebäude and (b) the tier-matched aarRdT is possible in principle (VII ZS, BauR 2024, 1725, 1726) — the parties may agree it. But case law sets hurdles, for the client's protection: the vehicle is a rechtsgeschäftliche Risikoübernahme — a "besondere Absprache" (BGH NJW 1984, 2457), termed "Beschaffenheitsvereinbarung nach unten" (Langen/Berger/Dauner-Lieb/Langen § 633 Rn. 83).
3.2 Cumulative validity requirements
- Disclose the usual standard — what would be owed WITHOUT the deviation,
in concrete, not abstract, terms.
- Disclose the concrete deviation — what will actually be built instead.
- Make it understandable to a layperson — "Fachkunde" cannot be presumed;
to a client without it the deviation must be MADE understandable (BGH NJW 2018, 391); full disclosure of Unsuitability + ensuing disadvantages (OLG Brandenburg NJW 2024, 839); client must grasp "vollständige Tragweite".
- Express, unambiguous agreement — "ausdrücklich und eindeutig", not from
fine print, not by silence; the deviation itself must be the named, negotiated object.
- Client consent provable — Unterschrift or zustimmende E-Mail (Textform);
the contractor bears the Beweislast for the agreement (OLG Hamm NJW-RR 1995, 17 → he must plead and prove it).
3.3 What courts rejected (study these — they are how projects die)
- "Einschalige Haustrennwand" in the Baubeschreibung of terraced houses sold
to lay buyers: no effective deviation — buyers could not deduce without Fachkunde that aarRdT Schallschutz is missed (BGHZ 181, 225 [230] = NJW 2009, 2439).
- Express 40 mm stair-stringer dimension, below aarRdT: even an explicit
DIMENSION is not an agreement to fall below the owed minimum when its significance was never pointed out (BGH NJW 2013, 1226).
- DIN references / dB figures / "Schallschutzfenster gewünscht?" — none can
describe usual vs lower standard to a layperson (OLG Saarbrücken NJW-RR 2021, 149). Binding descriptions contrast perceptual experience: what one hears — conversations, music, footsteps, from which direction, whether "in Ruhe wohnen" is possible (BGH NJW 2009, 2439).
- Regional market practice ("im Norden macht man das so") — irrelevant
against the presumption chain (NJW-RR 1995, 17; NJW-RR 2009, 1468).
- Bloße Kenntnis of the risk — not enough; for risky/non-permittable
planning even the client's known willingness needs "eingehende und umfassende Beratung über das Risiko" + agreement (BGH NJW 2013, 3442; OLG Celle NJW 2024, 2542).
- Limit of the limits: the true minima for Standsicherheit, Brandschutz,
Feuchteschutz, (a Schallschutz-Minimum) are seriously doubtful to be waivable at all without destroying function (Zöller 2024, 443 [VERIFY locus]) — and the functional concept (§ 2.2) binds regardless. Realistic deviation fields: comfort tiers, execution choices with preserved end-function (e.g. black vs white tub), above-GEG energy levels, Untergeschosse, Fassade, Außenanlagen, "sicherheitstechnische Anlagen" as in Bayern pilots — each per-case.
3.4 Documentation architecture (what actually works)
- Entscheidungsvorlagen per deviation: usual/aarRdT solution + est. cost →
chosen deviating solution + est. saving → consequences/risks incl. the durability horizon that is NOT guaranteed → client's signed decision reference. Make them Vertragsbestandteil.
- Präambel in planner + construction contract: project to be built simpler/
cost-efficiently, deviation from übliche standards INTENDED — necessary but not sufficient alone (the per-item documents do the work).
- Explicit tier definition ("einfacher Standard"/label) — imports the tier's
aarRdT as the minimum (BGH NJW 1998, 2814). Today's-law approximation of Typ E: anchor the owed minimum by reference to the applicable technical Baubestimmungen of the Land — already possible without the new statute.
- Model scripts — Feuchteschutz: "Due to site soil conditions only a
WU-Konstruktion meets the aarRdT ⇒ building should stay tight for its whole life ⇒ cost X. Alternative Bitumenabdichtung ⇒ estimated saving Y ⇒ risk: not tight for whole life; moisture damage possible after [stated horizon]." Schallschutz: "Comparable recent buildings achieve [usual level]; you would hear [list]. Our option achieves [level]; you would hear [list]. Cost difference: [X]. Do you want the lower standard?" — client signs.
- No universal recipe — the more areas deviate, the harder the naming duty
gets (you must name the aarRdT you leave); limit deviations to überschaubare Bereiche (Popescu). Residual litigation risk never reaches zero; exhaustiveness is the only de-risker — and Privatautonomie ("geschlossene Verträge gelten") is real too.
- Serialisation amortises documentation: one deviation-legal documentation →
Typengenehmigung/serielles Bauen → reused across N objects (§ 1.2 A11).
- HOAI trap: lowering standard lowers anrechenbare Kosten → fee can FALL
despite extra advisory effort (advising deviations is often NOT a Besondere Leistung). Fix contractually: effort-mirroring fee or synergy pricing after the first object; ask "ab wann lohnt das?" per project size.
- Early executor involvement (analogue Last Planner): cheaper alternative
designs must survive the ausführende Gewerk's veto — involve them in planning, not on site.
3.5 Insurance — before, not after
Berufshaftpflicht (AVB BHV) typically excludes damage from "bewusst gesetz-, vorschrifts- oder sonst pflichtwidriges Verhalten" (cf. OLG Hamm BauR 2007, 1290) → deliberate deviation can equal an uninsured gap. Action rule: written carrier position BEFORE the deviation decision meeting. This step is non-optional.
3.6 Worked example of a VALID design (the black-tub model)
Cellar where aarRdT demand "weiße Wanne"; parties want "schwarze Wanne". Holds if (i) the intended use "trockener Keller" is initially secured, (ii) contractor comprehensively instructs — black tub not proven for this Wasserlastfall, dryness over 50–60 y not ensurable — and (iii) client expressly agrees. Then "one can hardly construe an implied promise of the white tub". Counter-case (F.2, Leupertz): black tub chosen WITHOUT agreement, cellar dry after 4.5 y → still MANGEL; costly remediation owed; sole defense Unverhältnismäßigkeit — because dryness must hold 45–55 more years and year-7 dampness would be time-barred. The risk horizon, not the symptom, is the measure.
4. GEBÄUDETYP E — legislative vehicle & assessment
4.1 Vehicle
NOT a Musterbauordnung/LBO provision: the Typ-E route amends civil law — BGB Bauvertragsrecht (failed GebT-E-Gesetz Nov 2024, BT-Drs. 20/13959; Eckpunkte Nov 2025). Design: a new opt-in contract type "Gebäudetyp E-Vertrag" alongside Bauvertrag/Verbraucherbauvertrag/Architekten- und Ingenieurvertrag/Bauträgervertrag in Werkvertragsrecht, anchored to the technical Baubestimmungen der Länder. Without the express Typ-E agreement, the previous default machinery (§§ 2–3 above) applies unchanged.
4.2 The Gemeinsame Eckpunkte (Nov 2025), itemised
- Statutory provisions for the new "Gebäudetyp E".
- Express opt-in contract type; without it, previous law stays.
- Under Typ E only an "einfacher Standard" is owed:
- areas covered by the Land's technical Baubestimmungen → owed minimum = only
the aarRdT embedded in those Baubestimmungen; deviations from the Baubestimmungen no longer automatic Mangel, admitted where the LBO admits a "gleichwertige Lösung";
- content NOT covered by Baubestimmungen (quality/comfort) → "einfacher
Standard" = "einen Standard, mit dem beim kostenreduzierten und einfachen Bauen vom 'üblichen Standard' nach unten abgewichen wird … bestimmte Ausstattungs- und Komfortmerkmale reduziert …, wobei die zeitgemäße Gebrauchstauglichkeit sichergestellt bleibt" — only its tier-matched aarRdT are owed.
- Deviation from aarRdT allowed where no risk to **dauerhafte
Gebrauchstauglichkeit** (Gleichwertigkeit principle).
- Aufklärung: contractor must explain the MEANING of the Typ-E contract —
esp. that only "einfacher Standard" is owed; general instruction suffices vs Unternehmern; vs Verbrauchern: Textform incl. consequences + risks.
- Cost advantage shown in general terms (überschlägiger Schätzwert).
- Downstream information: later Kauf-/Mietvertrags-partners must be informed
the building was made only to the Baubestimmungen-minimum / "einfacher Standard".
- DIN clarification by statute: DIN are private technical rules with
recommendation character, not legal norms; no per-se Vermutung of reflecting aarRdT — it must be found per rule whether aarRdT are reflected.
4.3 What is / is NOT relaxed
Relaxed (if Typ E chosen): the civil minimum in Baubestimmungen-covered areas; non-covered comfort → tier-matched "einfacher Standard"; deviations with Gleichwertigkeit; the DIN presumption killed by statute. NOT relaxed: the public-law minima themselves (Typ E is a civil contract type; its Baubestimmungen deviation gate runs through the LBO's own "gleichwertige Lösung" admission); zeitgemäße/dauerhafte Gebrauchstauglichkeit; the safety core (Standsicherheit/Brandschutz/Feuchteschutz/Schallschutz-minimum) via function concept + LBO; everything if the contract is not chosen. No Bauregelliste/A-Liste/abZ or Feuerlöscheinrichtung specifics appear in the material — do not attribute any.
4.4 Assessment (doctrinal, with the critique currents)
- Consistent with VII ZS position (no DIN Vermutung, deviation possible) and
with criticism lines (Leupertz BauR 2025, 365; Schettler NZBau 2024, 587; Baureis/Dressel IBR 2024 [VERIFY pages]; Rehbein PrivBauR-HdB § 15 Rn. 106a).
- Critique: a dedicated new contract type cuts against the BGB's idea of
abstract, generally applicable rules; must first be "filled with life" by practice/courts — doubtful contribution to Rechtssicherheit. Points 3–7 largely restate today's law (anchoring Baubestimmungen as owed minimum, disclosure incl. onward chain — already possible). No tangible relief visible on the actually-painful Aufklärungspflichten — templates/aids for the instruction and for Beschaffenheitsvereinbarungen would help more (plus real Normgebungsverfahren transparency). Mere buyer/tenant INFORMATION (point 7) vs the negative- Beschaffenheitsvereinbarung case law = fragil [own note: the statute would need to override that line explicitly]. Point 8 "sinnvoll" but not requiring legislation per VII ZS.
4.5 THE CENTRAL TRAP (memorise)
Public-law easing ≠ private-law relief. Befreiungen/reduced pilot standards make the building permitted; they do not make a sub-standard build vereinbart. A publicly approved building remains zivilrechtlich mangelhaft when it misses the implied aarRdT/Zeitgebäude standard (§ 2.5; F.13 — even a missing Baugenehmigung is itself a Sachmangel at the sale tier, BGH NJW 2013, 2182). Typ E attacks the PRIVATE side — opt-in only, simpler-standard only, disclosure hurdles only partly eased. Therefore: every simplification decision lives twice — in the Baugenehmigungsakte AND in the contract text; only the second one deters the warranty claim.
5. LIABILITY CHAIN — Werk → Kauf → Miete
5.1 Delivery chain (Werkvertragsrecht recap for routing)
- Remedies ladder once Mangel: § 634 menu → § 635 Nacherfüllung (contractor
chooses repair/new; bears costs; may refuse as unverhältnismäßig) → § 636 Rücktritt/Schadensersatz after Fristsetzung (or dispensable/failed/unreasonable) → § 637 Selbstvornahme + Kostenvorschuss → § 638 Minderung.
- Planner/overseer liability: § 650q Abs. 2 BGB applies the Bauvertragsrecht
machinery to Architekten-/Ingenieurverträge → Planungsfehler = Haftung; a planning error realised in construction = zugleich Baumangel.
- Gesamtschuld client↔architect↔contractor (§ 426: client elects either; internal
Ausgleich/Regress); § 650t: supervising architect may refuse damages where the executing contractor is also liable and no Nacherfüllung-Frist has failed yet.
- Bauträger: §§ 631 ff. apply to Errichtung/Umbau (§ 650u Abs. 1 S. 2).
- Limitations: buildings 5 y (§ 634a Abs. 1 Nr. 2 BGB) / VOB/B 4 y
(§ 13 Abs. 4 S. 1) — vs > 60 y life (the asymmetry driving everything).
5.2 Kaufvertrag (selling the result)
§§ 433/434 BGB mirror § 633 (2022 reform): agreed Beschaffenheit → presupposed use → ordinary use + übliche Beschaffenheit by vernünftiger Durchschnittskäufer view at contract conclusion, incl. public statements/advertising (BeckOK/Faust § 434 Rn. 75; MüKo/Maultzsch § 434 Rn. 56). Condo: buyer may expect the Beschaffenheit of equal, simultaneous units. Missing Baugenehmigung = regularly Sachmangel of sold WEG (BGH NJW 2013, 2182). Compliance with usual standards AND aarRdT belongs to expectable Beschaffenheit of housing (LG Köln IBRRS 2023, 2844). Downward deviation from objective requirements toward consumers = negative Beschaffenheitsvereinbarung, "verschärfte formelle" prerequisites: "vor Vertragsschluss von der konkreten Abweichung eigens in Kenntnis gesetzt und gesondert zugestimmt". § 476 I 1: seller cannot rely on a liability limitation agreed before defect notification — the negative agreement, not the waiver clause, is the instrument. The Bauherr who accepted a reduced standard upstream must replicate the same instruction + consent downstream, or the "simplified" building re-emerges as his own defect liability.
5.3 Mietvertrag (renting the result)
§ 535 Abs. 1 S. 1, 2 BGB: grant + KEEP use-fit condition. § 536 Abs. 1: Mangel → Miete gemindert/befreit ("unerheblich" excepted). Without party agreement, the "zum vertragsgemäßen Gebrauch geeignete Zustand" = standard of comparable Wohnungen — Alter/Ausstattung/Art/Miete/Ortssitte — and "Gibt es … technische Normen, ist jedenfalls deren Einhaltung geschuldet … grundsätzlich der bei Errichtung des Gebäudes geltende Maßstab" (settled BGH Wohnraummietrecht line: NZM 2004, 736; NZM 2009, 855; NZM 2010, 618; NZM 2012, 611; NZM 2013, 575; NZM 2014, 163; NZM 2017, 256; NJW 2005, 218; NJW 2009, 2441). Trittschall: DIN applicable at Ausbau deemed contract content (NJW 2005, 218; NJW 1998, 2814). The one favourable limit: it is NOT material that at construction time elevated insulation beyond DIN 4109 was technically easily possible — the construction-law "higher possible standard" case law is NOT transferable to tenancy (BGH NZBau 2010, 701). Downward deviation in the tenancy contract: possible only "eindeutig" with tenant's declared Einverständnis (NJW 2004, 3174; NZM 2010, 356); transparency bar same as elsewhere; absolute hard limit § 536 Abs. 4: no advance waiver/exclusion of the Minderung rights to the tenant's detriment — only the owed STANDARD itself may be transparently fixed. Rent-reduction losses caused by Baumängel within the construction warranty window = Mangelfolgeschaden the landlord can pass through to contractor/planner.
5.4 Who bears what, for a deliberately lowered standard
| Actor | Bears | Mitigation | |
|---|---|---|---|
| Contractor/planner | Beweislast for the downward agreement; Gesamtschuld (§§ 426, 650t); insurance exclusion for deliberate rule-breaking | § 3.4 decision templates signed as Vertragsbestandteil; § 3.5 carrier sign-off; Gleichwertigkeit evidence file | |
| Bauherr/developer | residual standard risk if documents fail; downstream Kauf-/Miet exposure | replicate instruction + consent at every sale/lease (negative Beschaffenheitsvereinbarung; eindeutige Zustandsvereinbarung) | |
| Buyer | reduced reality only after eigens informed + gesondert consented | — (consumer-side protection is the doctrine) | |
| Tenant | nothing below owed standard unless eindeutige condition clause; § 536 IV floor intact | — |
Net: explicit, replicated contractual documentation is the ONE protective instrument across the whole chain — it converts "simplified" from defect into agreed condition at every tier.
6. FALLBEISPIELE — the 24 cases as a lessons table
| # | Case (court) | Facts → holding | Lesson for the ladder | |
|---|---|---|---|---|
| F.1 | Bridge rating (Fallbeispiel 1.1) | agreed Tragfähigkeit + known heavy vehicles → Mangel despite spec | specs never exhaust function duty; advise-or-upgrade | |
| F.2 | schwarze vs weiße Wanne (Leupertz) | dry after 4.5 y → still Mangel; remediation owed; Unverhältnismäßigkeit sole defense | risk horizon, not symptoms; documentation = only clean exit | |
| F.3 | Asphalt deck (BGH [VERIFY cite]) | ~16 y usual life; aarRdT breach → "Gebrauchstauglichkeit gemindert", extent open | durability proxies actionable without quantified damage | |
| F.4 | Schaufenster/Regelwasser (NJW 1981, 2801; Stuttgart NJW-RR 2023, 1317) | risk-bearing execution = Mangel; need not wait for damage | risk-embedded design = present defect from Abnahme | |
| F.5 | einschalige Haustrennwand (BGHZ 181, 225) | technical wording in Baubeschreibung ≠ instruction to lay buyers | describe what will be HEARD, not what is built | |
| F.6 | 40 mm Treppenwange (NJW 2013, 1226) | express dimension ≠ agreement to drop standard | the STANDARD, not the measurement, must be the negotiated object | |
| F.7 | Schallschutz communication (NJW 2009, 2439; Saarbrücken NJW-RR 2021, 149) | DIN/dB/Schallschutzfenster-question all insufficient; lay perception governs | instruction contrasts usual vs reduced in perceptual terms, both directions | |
| F.8 | DIN 4109 rebutted (OLG Hamm NZBau 2020, 29) | 63/67 dB economically attainable → presumption rebutted | norms are evidence, not verdicts — attack AND shield | |
| F.9 | "im Norden" roof trade (NJW-RR 1995, 17; 2009, 1468) | regional practice loses to presumption chain | market custom ≠ defence | |
| F.10 | Baugrube→Neuschaden (BGHZ 103, 338) | DIN breach → presumption of causation in tort | presumption doubles outside contract law | |
| F.11 | Spielgeräte (NJW 1987, 2222; DIN 7926-1/18034) | voluntary DIN concretize Verkehrssicherungspflichten | simplification re-enters via third-party duties | |
| F.12 | Sanierung/DIN-gerecht (Werner/Pastor line) | proper management only if DIN-gerecht | owners/managers inherit the chain | |
| F.13 | missing Baugenehmigung (NJW 2013, 2182) | public-law shortcut → Sachmangel at sale tier | approvals ≠ private compliance | |
| F.14 | tender silence (NZBau 2014, 185; 2002, 324; Celle VPR 2022/1) | bidder view; LV construed against drafter | simple scope must be WRITTEN | |
| F.15 | tier relativity (NJW 1998, 2814; VII ZS BauR 2024, 1725) | owed aarRdT follow agreed tier | tier label = first cost lever | |
| F.16 | mid-project rule change (NJW 2018, 391) | Abnahme state governs; instruct; Mehrvergütung | regulatory calendar = priceable joint decision | |
| F.17 | risky/non-permittable takeover (NJW 2013, 3442; Celle NJW 2024, 2542) | bloße Kenntnis ≠ Einwilligung; extensive Beratung + agreement required | draft deviation agreements against the strictest template | |
| F.18 | Unverhältnismäßigkeit valve (NJW-RR 2015, 1300; Düsseldorf IBR 2021/3, 125) | harmless deviations → cure disproportionate | defense, not strategy | |
| F.19 | presumption softening (Düsseldorf IBR 2025, 280; Brandenburg IBR 2026, 60; NJW 2024, 839) | not "in allen Fällen"; no functional/optical harm → rebutted | harmless small deviations increasingly survive | |
| F.20 | insurance exclusion (Hamm BauR 2007, 1290; AVB BHV) | deliberate rule-breaking uninsured | carrier sign-off BEFORE decision | |
| F.21 | "Das große kleine Haus" (Bayern) | ≈ 4,000 m² BGF coop; B-Plan-Befreiungen, Holzhybrid, reduced Schallschutz, no Lüftung, no sicherheitstechnische Anlagen, re-used steel; ≤ 200,000 € Holzbau-Förderung | public-law path already delivers real simple building; civil tier still needs § 3/§ 4 machinery | |
| F.22 | "Haus fast ohne Heizung" (Ingolstadt) | first completed/occupied Bayern pilot, near-zero heating | energy-standard reduction pilot-provable | |
| F.23 | Hamburg-Standard numbers | ≈ ⅓ ≈ 2,000 €/m² (KG 200–700) via 39 standard levers ≤ 600 + Verzicht UG/Fassade/Außenanlagen ≤ 1,000 + Prozesse ≤ 400; nothing above GEG energy | big levers are programmatic, pre-validated; speed is real but smaller | |
| F.24 | SH Regelstandard Erleichtertes Bauen | ARGE e.V. (Mitteilungsblatt 263, 2024): ≤ 25 % in Konstruktion + technischer Ausbau, WITHIN valid norms, funding-anchored | define the tier → tier-matched aarRdT are what's owed |
7. PILOT STANDARDS IN NUMBERS (the proof of concept)
7.1 Bayern — "Gebäudetyp-e" Modellvorhaben
- Driver: Bauwirtschaft crisis (costs, bureaucracy, falling project numbers);
goals: explore requirement leeway, cut bureaucracy, generate industry knowledge (Bayerisches StMB 2025).
- Flagship F.21 (above). Pipeline: 3 further pilots building; first occupied:
F.22; 19 pilots scientifically monitored; public buildings included (Ellis-Kaut-Grundschule Germering — first school project; findings feed future economical/sustainable school builds).
- Lessons: Befreiungen vom B-Plan are used deliberately (geometry), material
reuse (Stahlbauteile) and comfort reductions (Schallschutz, no Lüftung) are the real cost levers; subsidy stack works (Holzbau-Förderprogramm ≤ 200 k €).
7.2 Hamburg-Standard — Initiative "kostenreduziertes Bauen"
- Headline: **cost reduction up to one third — ≈ 2,000 €/m² brutto Wohnfläche in
KG 200–700** shown possible; systematic analysis, plausibilised + monetarily evaluated by external scientific assessors.
- Three Handlungsfelder: (1) kostenreduzierende Baustandards — 39 identified
simplification options across Baukonstruktion, Gebäudetechnik, Barrierefreiheit, Schall-/Brandschutz, ≤ ≈ 600 €/m²; (2) Verzicht/Vereinfachung selected technical/structural requirements — Untergeschosse, Fassadengestaltung, Außenanlagen — ≤ ≈ 1,000 €/m²; (3) Planung-/Genehmigungsprozesse — early planning, fewer Schnittstellen, delay avoidance — ≤ ≈ 400 €/m². (4th position: energetische Anforderungen — forgo standards ABOVE GEG; policy rec.)
- Continuous process: current results = baseline for reducing valid standards in
affordable rental new-build. [Not in material: Hamburg-specific dB/storey/ Stellplatz values — do not fabricate.]
7.3 Schleswig-Holstein — "Regelstandard Erleichtertes Bauen"
- Author: Arbeitsgemeinschaft für zeitgemäßes Bauen e.V. ("ARGE e.V."),
interdisciplinary (housing companies, planners, industry, science, public hand); Regelstandard published in ARGE e.V. Mitteilungsblatt Nr. 263 (2024).
- Concept: conscious reduction of bauliche/technische/ausstattungsbezogene
Anforderungen for cost-optimised building WITHOUT undercutting Sicherheit, Gebrauchstauglichkeit, Dauerhaftigkeit, Wohnqualität.
- Hook: defines the förderfähige Maßnahmen of sozialen Wohnraumförderung SH —
economical implementation ON THE BASIS OF VALID norms (compliant reduction, not norm suspension).
- Numbers: consistent application → up to 25 % savings esp. in
Bauwerkskonstruktion and technischer Ausbau vs previous common practice, plus lower resource use/GHG. [Not in material: ErprobungsVO/storey caps/€/m² — none.]
Pilot meta-lesson: all three ride public-law/funding-level simplification; none touches the civil default — which is exactly why § 3 documentation remains mandatory for private projects, and why Typ E's civil anchoring matters.
8. WORKING THE LIBRARY WITH THIS SKILL
8.1 Routing order for every project
- Set the tier + the ladder profile with the client (this skill § 1): which
axes at L0, which explicitly escalated, which deviation machinery needed (§ 3). Output: two-page Komplexitäts- und Standardvereinbarung → Vertragsbestandteil.
- Plan with all other skills at that tier: e.g.
building-typologychooses
type within L0 geometry logic; structural-systems picks the L0 system unless A3 escalated; construction-detailing draws the ordinary details first; building-services-tga sizes the minimal compliant system.
- Pre-submission audit against § 2/§ 3: every below-usual item has a signed
Entscheidungsvorlage; every above-GEG/DIN item has a signed "why".
bim-managementcarries tier + deviations as data (BIM property set
Standard- und Komplexitätsvereinbarung, deviation log); construction-freecad-bim models L0 members unless the escalated axis is signed.
- Downstream replication at every Kauf/Miet tier (§ 5.2/§ 5.3).
8.2 Per-skill "simple first" implications (the escalation map)
building-planning-spatial/building-typology: L0 = compact, regular;
typological Sonderformen are escalations with α/Ψ penalties priced.
structural-systems/structural-analysis/concrete-detailing/
masonry-construction / timber-steel-design: L0 = loadbearing walls + standard decks; every system jump triggers the full check chain, never a detail-library copy from an escalated project.
geotechnics-foundations: "no basement" is the simplest foundation; a WU
slab is still L0 where groundwater demands — function first (§ 1.3).
building-physics-thermal-moisture/building-acoustics/fire-protection-building:
law/GEG/LBO floors are hard; above-floor comfort (Ersschallschutz, comfortlüftung) is escalation territory; below-floor is § 3 territory.
construction-detailing/roofing-waterproofing/openings-windows-doors/
stairs-vertical-circulation: L0 = standard detail library of the trade; every unique detail = complexity tax (§ 1.4) + § 3 machinery if below aarRdT.
building-services-tga: L0 = minimal compliant system set; "sicherheitstechnische
Anlagen" beyond requirement are escalations (Bayern proof).
accessibility-universal-design: DIN 18040-1 programme = explicit client
decision; 18040-2/barrier-reduced = L0 where funding demands.
sustainable-construction: sufficiency (reducing demand: size, storeys,
systems) IS the simplest sustainability lever — ladder aligns with "Vermeidung vor Optimierung"; GEG-over-standard (EH40/55) = escalation decision.
construction-scheduling-site/bim-management: L0 delivery = classical;
serial/Typengenehmigung/Takt = escalations that PAY when they amortise § 3.4 documentation across objects.
cost-management-din276/building-regulations-permits: tier profile feeds KG
budgets; pilot numbers (§ 7) as cost-reduction evidence for the client decision; permit strategy = public layer only (§ 4.5 trap).
existing-structures-retrofit: simplest option = leave what works untouched
(Nachrechnung per its own tier rules); every "make it new" is escalation.
construction-freecad-bim: model gate — a non-L0 object needs the signed
escalation reference in its name/property, else it is a design defect in the data, not just the drawing.
construction-drawing-sketching: draw L0 first; escalate the drawing only when
the decision is made.
8.3 Pre-planning checklist (condensed)
- [ ] Standard tier chosen and NAMED (label) — § 2.3 tier relativity.
- [ ] Ladder profile per § 1.2: L0 default; every escalation listed with reason +
price/schedule impact.
- [ ] Deviation list: below-usual items only where § 3.3 limits respected
(Standsicherheit/Brandschutz/Feuchteschutz/function are off the table).
- [ ] Insurance carrier position obtained BEFORE deviation decisions (§ 3.5).
- [ ] Entscheidungsvorlagen drafted per deviation (§ 3.4 templates) → signature.
- [ ] HOAI/fee effect of tier reduction solved contractually (§ 3.4).
- [ ] Rule-change radar + Abnahme-date logic understood (§ 2.3 timing).
- [ ] Downstream: sale/lease templates carry the replicated instruction clauses (§ 5).
- [ ] Public-law route checked AND known to be insufficient alone (§ 4.5).
- [ ] Serialisation/Typengenehmigung considered when ≥ 2 similar objects (§ 3.4).
8.4 Reality check
This skill is planning and contract-practice knowledge, not legal advice and not construction-law counsel. Statutes/case law change; state law (BauO der Länder, introduced Baubestimmungen) differs; the VII-ZS-vs-h.M. conflict on the DIN presumption is live until a statute settles it; Typ-E legislation is pending per the Nov 2025 status of this skill [VERIFY before every project]. A deliberately simplified project MUST be walked through with a lawyer specialising in Bauvertragsrecht + the Berufshaftpflicht carrier before signing deviation agreements — the § 3 hurdles are individually fatal when missed, and no template (including this skill's) guarantees enforceability (Beweislast on the contractor).
8.5 Evidentiary tiers used here
- T1 law/case-law anchors: §§ 633/634/635/636/637/638/634a/650q/650t/650u/
426/433/434/476/535/536 BGB; § 4 Abs. 2 Nr. 1 S. 2, § 13 Abs. 1/4 VOB/B; BGH decisions as cited; DIN 820-1; ETB/Baubestimmungen anchoring — quoted/paraphrased from the doctrinal record, current text prevails.
- T2 settled doctrine: aarRdT definition, tier relativity, presumption
controversy, pilot programme facts (public sources, 2024–2026 publications).
- T3 [VERIFY]: every cost-delta percentage/€ in § 1 and § 7 (market- and
location-dependent), the pending legislative status, citation-year variants the material flags, and Zöller/Baureis loci. Never quote § 1 deltas as market figures; re-price per project via cost-management-din276.
8.6 Glossary (terms of art, retained German)
"aarRdT" — allgemein anerkannte Regeln der Technik (scientific recognition + practical proof). "Stand der Technik" / "Stand von Wissenschaft und Technik" — higher floors, express agreement required. "Beschaffenheitsvereinbarung (nach unten)" / "negative Beschaffenheitsvereinbarung" — downward deviation agreement (construction/sales). "funktionaler Mangelbegriff" — purpose-failure defect limb. "Abnahme" — acceptance, pins the owed standard date. "stillschweigende Zusage" — implied promise (BGH's vehicle). "rechtsgeschäftliche Risikoübernahme" — the agreed risk shift. "Gleichwertigkeit" — equal-value deviation gateway. "Beweislast" — contractor bears it for the deviation. "AVB BHV" — insurance conditions excluding deliberate rule-breaking. "technische Baubestimmungen der Länder"/ETB — administrative incorporated rules; Typ E's anchoring layer. "Befreiung" — public-law waiver (necessary, never sufficient). "Typengenehmigung"/"serielles Bauen" — the documentation-amortising delivery models. "Gebäudetyp E"/"einfacher Standard" — the proposed opt-in contract type and its owed tier.
9. KEY-NUMBERS REGISTER (memorisation block)
- Warranty: 5 y BGB buildings / 4 y VOB/B; building life > 60 y —
the asymmetry behind aarRdT doctrine; black-tub: dry at 4.5 y = still Mangel; dampness in y 7 escapes liability; required dryness horizon 45–55 y.
- Norm mass: > 3,300 private technical DIN/VDI/etc. (2015, BMU).
- Sound rebuttal values: DIN 4109 presumption REBUTTED where 63/67 dB
economically attainable (OLG Hamm NZBau 2020, 29).
- Failed-agreement classics: 40 mm stringer; "einschalige Haustrennwand" clause.
- Hamburg: ≈ ⅓ ≈ 2,000 €/m² (KG 200–700) = 600 (39 levers) + 1,000
(UG/Fassade/Aussenanlagen) + 400 (Prozesse) €/m²; energy: nothing above GEG.
- SH: ≤ 25 % (Konstruktion + technischer Ausbau), ARGE e.V. MBl. 263/2024,
within valid law via Wohnraumförderung.
- Bayern: flagship ≈ 4,000 m² BGF, subsidy ≤ 200 k €, 19 monitored
pilots (1 occupied, 3 under construction at material date).
- Legislation: RefE 2024 · BT-Drs. 20/13959 Nov 2024 (failed) ·
Koalitionsvertrag 05.05.2025 · Eckpunkte 11/2025.
- Limitation of waivers: § 476 I 1 BGB (sale), § 536 IV BGB (tenancy).
- Senate conflict: VII ZS (BauR 2024, 1725): no DIN Vermutung — vs h.M.
construction-law view (widerlegliche Vermutung).