gonka-ai/gonka/upgrade-bootstrap

Claude Code and agent skill by gonka-ai/gonka

Trust tier 2
  • community
LLM review pending
Source check pending

Checking that the SKILL.md file is still in the repository.

Bootstrap a new Gonka full automatic upgrade train for inference-chain and decentralized-api only. Use when the user wants to start a new upgrade branch from the latest main, scaffold the matching chain upgrade handler, make the initial bootstrap commit, and open the canonical draft PR against main. Do not use for MLNode-only or devshard-only work, release rollout, governance voting, or post-upgrade merge steps.

Install

npx vskill@latest install gonka-ai/gonka/upgrade-bootstrap

SKILL.md

Upgrade Bootstrap

This skill bootstraps an upgrade train. It does not finish one.

Use it only for the special full automatic upgrade flow that covers:

  • inference-chain
  • decentralized-api

Do not use this skill for:

  • MLNode upgrades
  • devshard upgrades
  • ad hoc API-only rollouts
  • release publishing
  • governance voting
  • testnet rollout
  • merge or post-upgrade cleanup

Required input

The caller must provide the target version in exact vX.Y.Z form.

Everything else is derived from that one string:

  • branch: upgrade-vX.Y.Z
  • upgrade package dir: inference-chain/app/upgrades/vX_Y_Z/
  • Go package: vX_Y_Z
  • upgrade constant: UpgradeName = "vX.Y.Z"
  • draft PR title: Upgrade vX.Y.Z

If the caller gives a partial version, a branch name without the v, or any other approximate form, normalize only after confirming the exact target version.

Goal

Produce the canonical starting point for the upgrade train:

  1. branch from the latest main
  2. scaffold the minimal chain upgrade handler
  3. make one bootstrap commit
  4. open a draft PR against main
  5. stop

That draft PR is the coordination anchor for the rest of the upgrade work.

Safety rules

  • Always branch from the latest main, not from the current branch and not

from an older upgrade branch.

  • Prefer non-interactive git commands.
  • If local work prevents switching to main or fast-forwarding it cleanly, do

not bulldoze through it. Pause and ask the user how to proceed.

  • Never include MLNode or devshard work in this bootstrap unless the caller

explicitly broadens scope.

  • Keep the initial scaffold intentionally small. Do not start implementing the

actual upgrade features unless the caller asks.

Bootstrap workflow

1. Prepare the branch

Start from the latest main:

bash
git fetch origin
git switch main
git pull --ff-only origin main
git switch -c upgrade-vX.Y.Z

If the repo is dirty and switching branches would disturb local work, stop and ask before proceeding.

2. Scaffold the upgrade handler

Create the minimal handler scaffold modeled after the current tracked-upgrade pattern. Touch only the upgrade-registration surface:

  • inference-chain/app/upgrades.go
  • inference-chain/app/upgrades/vX_Y_Z/constants.go
  • inference-chain/app/upgrades/vX_Y_Z/upgrades.go
  • inference-chain/app/upgrades/vX_Y_Z/upgrades_test.go

Do the following:

  • Add the new import in inference-chain/app/upgrades.go
  • Register the handler in setupUpgradeHandlers() using

app.setTrackedUpgradeHandler(...), not raw SetUpgradeHandler(...)

  • Create constants.go with the exact on-chain upgrade name
  • Create upgrades.go with a minimal handler that:
  • logs start and success
  • fixes missing capability version in fromVM
  • runs mm.RunMigrations(...)
  • does nothing else yet
  • Create upgrades_test.go with a test that pins UpgradeName exactly

The initial scaffold should not:

  • add real migration logic
  • bump module ConsensusVersion
  • register empty migrations in registerMigrations()
  • create proposal/release/governance artifact docs
  • modify join-stack image tags

Those belong to later upgrade work, not to bootstrap.

The registration helper matters: it keeps LastUpgradeHeight tracking attached to every software upgrade handler automatically. Do not bypass it unless the upgrade work is intentionally changing that behavior.

3. Keep the scaffold comments useful

The scaffold should explain the contract briefly:

  • UpgradeName must exactly match the future on-chain proposal name
  • future migration steps belong below the capability-version fix and above

RunMigrations

  • if later work bumps a module ConsensusVersion, that later work must also

register the corresponding migration in registerMigrations()

Keep these comments short and operational.

4. Verify only the bootstrap surface

Run a narrow test for the new package. When using Go commands, always go through zsh -lc so the shell loads the Go environment.

Example:

bash
cd inference-chain
zsh -lc 'go test ./app/upgrades/vX_Y_Z'

If the new package needs broader verification because of compile-time registration issues, extend to the smallest useful check. Do not turn bootstrap into a full upgrade test pass.

5. Make the initial bootstrap commit

Use a focused commit message. Default:

text
chore(upgrade): scaffold vX.Y.Z upgrade handler

Stage only the scaffold files and commit them. Do not mix unrelated work into this commit.

6. Push and open the draft PR

Push the new branch and open a draft PR against main.

The PR is the canonical upgrade thread. It should exist immediately after the bootstrap commit so future work has one shared place for review and scope.

Default PR title:

text
Upgrade vX.Y.Z

Default PR body should be short and clearly marked as bootstrap. Include:

  • that this is the draft upgrade train for the full automatic inference-chain
  • decentralized-api upgrade
  • that the branch currently contains only the initial upgrade-handler scaffold
  • that later commits on this branch will accumulate the actual upgrade changes
  • that MLNode and devshard work are out of scope for this PR unless explicitly

added later

Do not pad the PR with release, voting, or rollout instructions.

If GitHub connector tools are available, prefer them for PR creation. Otherwise use a non-interactive gh pr create --draft ... flow.

Stop condition

Stop as soon as all of the following exist:

  • local branch upgrade-vX.Y.Z
  • minimal handler scaffold in inference-chain/app/upgrades/vX_Y_Z/
  • one bootstrap commit
  • pushed branch
  • draft PR against main

Do not continue into feature implementation unless the caller explicitly asks.

Report back

When finished, report:

  • branch name
  • bootstrap commit hash
  • test command run
  • draft PR URL
  • any blocker or deviation from the standard bootstrap flow

Security

  • Security scanPassed, 100 of 100Pattern checks on the skill's files.
  • Model reviewNot runA model review is scheduled for the next rescan.

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

Repository stars
609
Repository forks
135
7-day trend score
32

Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/gonka-ai/gonka/upgrade-bootstrap/badge)](https://verified-skill.com/skills/gonka-ai/gonka/upgrade-bootstrap)

Something wrong with this skill or its page? Tell us.