version: "1.0.1" name: gcx-observability description: >- (Experimental) Runs an end-to-end observability rollout for an application on Grafana Cloud via gcx: instrumentation, SLOs, alerts, synthetic checks, k6, IRM, dashboards, cost, GitOps. Use to set up monitoring for a service from scratch. For LLM apps use agento11y-instrument. user-invocable: true argument-hint: "[phases]" allowed-tools: Bash, Read, Write, Edit, Glob, Grep, Agent, AskUserQuestion, TaskCreate, TaskUpdate, TaskList, TaskGet
You are helping the user implement comprehensive Grafana Cloud observability for their application using a test-driven approach. Use gcx to automate setup.
Test-driven observability principle: Define what "healthy" looks like before deploying instrumentation. Every signal needs a test that can fail: SLOs express availability/latency contracts, k6 tests express load requirements with pass/fail thresholds, and synthetic checks express uptime expectations. Instrumentation exists to make those tests meaningful - not the other way around. Phase 2 captures all test definitions up front; later phases deploy infrastructure to satisfy them.
Work interactively - explain each phase, generate YAML from gcx resources list-examples <type> where one exists (not every kind ships an example — fall back to gcx resources list-types <type> and a minimal manifest), confirm before creating anything, and validate success.
Command discovery: Before executing any action in a phase, use gcx <group> --help to discover the exact commands and flags available. Use gcx commands --flat -o json to see all command groups. Never assume a command's exact syntax - always discover it first. For Kubernetes operations, use kubectl --help and kubectl <verb> --help to discover the right flags.
Parallelism rules:
- Use
TaskCreateto register every unit of work before starting anything, so the user can see progress. - Use the
Agenttool to run independent operations concurrently. Launch multiple agents in a single message whenever their inputs don't depend on each other. - Within a phase, identify which resources are independent and launch them as parallel agents. Only serialize when there is a true dependency (e.g. a contact point must exist before a notification policy references it).
- Use background agents (
run_in_background: true) for slow operations (k8s prep, large exports) so you can continue other work while they run. - After all agents in a wave complete, collect results, report to the user, and move on.
Step 1: Select Phases
If the user passed arguments ($ARGUMENTS), use them directly as the selected phases - do not show the menu. all means all phases; a space-separated list like 0 1 2 means those specific phases.
Otherwise, show the following menu and ask which phases to run:
Grafana Cloud Observability Setup══════════════════════════════════Phase 0 Bootstrap Verify gcx config + stack authPhase 1 Discovery & Context Gather app info (clusters, namespaces, journeys)Phase 2 Test Definitions Define SLOs, k6 thresholds, synthetic checks FIRSTPhase 3 Instrumentation Alloy collector, setup instrumentation, Faro frontendPhase 4 SLO-Based Alerting Wire alert rules, contact points, policiesPhase 5 Synthetic Monitoring Deploy uptime checks (defined in Phase 2)Phase 6 k6 Load Testing Deploy load tests + schedules (defined in Phase 2)Phase 7 IRM Setup Oncall integrations, escalation chains, schedulesPhase 8 Custom Dashboards Dashboards via gcx resources pushPhase 9 Cost Optimization Adaptive metrics/logs/traces for cardinality controlPhase 10 GitOps Export Export managed resources as declarative YAMLPhase 11 Observability Review Validate signals, find gaps, recommend next stepsEnter phases to run (e.g. "0 1 2" or "all"):
Once phases are selected, immediately create a task for every selected phase using TaskCreate before executing anything. This gives the user a live progress view.
Step 2: Execute Selected Phases
Phases have dependencies:
- Phase 0 must complete before anything else.
- Phase 1 must complete before Phases 2-11 (provides context).
- Phase 2 must complete before Phases 3-6 (test definitions drive instrumentation and alerting).
- Phase 3 should complete before Phase 4 (signals must flow before SLOs are meaningful).
- Phase 4 must complete before Phase 7 (IRM wires into alerting contact points).
- Phases 5, 6, 8, 9 are independent of each other and of Phase 7 - run them in parallel after Phase 3.
- Phase 10 must be last (exports everything created).
- Phase 11 must be last (validates everything).
Verification principle: After every create operation, verify the resource exists and is healthy using list or get. Do not mark a phase completed until all resources pass verification. If a resource fails verification, debug before moving on.
Idempotency principle: At the start of every phase, check what already exists before creating anything. If a resource with the expected name already exists, skip creation and go straight to verification. If a phase is partially complete, resume from the first missing resource - never re-create resources that are already healthy.
Recommended parallel execution plan (after Phases 0-3):
Wave A (parallel): Phases 4, 5, 6, 8, 9Wave B (after Wave A): Phase 7 (needs Phase 4 contact points)Wave C (after Wave B): Phases 10, 11 (parallel with each other)
Launch Wave A agents in a single message. Do not wait for one to finish before starting another.
Within each phase, also parallelize at the resource level (see the per-phase instructions in references/).
Phase Instructions
The detailed per-phase instructions (pre-checks, commands, parallel agent breakdowns, verification steps) live in reference files. Read the file covering a phase before executing it - e.g. read phases-0-3-foundation.md at the start, and phases-4-7-alerting.md when Wave A begins.
| Phases | Read | Covers | |
|---|---|---|---|
| 0-3 | references/phases-0-3-foundation.md | Bootstrap, discovery & context, test definitions, instrumentation | |
| 4-7 | references/phases-4-7-alerting.md | SLO-based alerting, synthetic monitoring, k6 load testing, IRM | |
| 8-11 | references/phases-8-11-finalize.md | Custom dashboards, cost optimization, GitOps export, review |
Final Summary
After all tasks are completed:
- Call
TaskListto confirm all tasks are marked completed. - Show a summary table:
Resource Type Count Status─────────────────────────────────────────SLOs 3 okAlerting rule groups 4 okContact points 1 okSynthetic checks 5 okk6 tests 3 okk6 schedules 3 ok (every test must have one)IRM integrations 1 okFaro apps 1 ok (if frontend stack)Dashboards 4 okAdaptive metrics rules N okAdaptive logs rules N ok...
- Show stack URL from
gcx config view. - Next recommended action: commit the export directory and add the CI drift-check step.