version: "1.0.1" name: planning-and-task-breakdown description: >- Use when starting implementation of a feature or change that involves multiple files or steps. Produces a structured task list with vertical slices, acceptance criteria, and verification steps.
Planning and Task Breakdown
Overview
"The plan is the task — 10 minutes upfront prevents hours of rework." Break work into small, ordered, verifiable tasks before writing code. Each task is a vertical slice that leaves the system in a working state.
When to Use
- Before implementing any feature spanning more than 2–3 files
- After writing a spec (follows
spec-driven-development) - When a task feels "too big to start"
- When multiple developers will work on related code
Skip when: The change is a single-file fix with obvious scope.
Core Process
Step 1: Read-Only Analysis
- Read the spec (SPEC.md) or requirements — do not modify any code
- Map the codebase:
- Which modules are involved? (
:app,:feature:*,:core:*) - Which layers? (UI → ViewModel → UseCase → Repository → DataSource)
- What existing code can be reused?
- Identify constraints:
- Android API level requirements
- Existing architecture patterns to follow
- Library versions and compatibility
Step 2: Map Dependencies
- Draw the dependency graph:
- Data models → Repository → UseCase → ViewModel → UI
- Room entities → DAOs → Database migrations
- Navigation graph changes → Screen composables → ViewModels
- Identify the critical path — what must exist before other work can start
Step 3: Vertical Slicing
- Slice vertically, not horizontally:
Wrong (horizontal):
- Task 1: Create all Room entities
- Task 2: Create all DAOs
- Task 3: Create all repositories
- Task 4: Create all ViewModels
- Task 5: Create all screens
Right (vertical):
- Task 1: User can view item list (Entity + DAO + Repo + ViewModel + Screen)
- Task 2: User can create new item (AddScreen + ViewModel + Repo insert)
- Task 3: User can edit existing item (EditScreen + ViewModel + Repo update)
- Task 4: User can delete item (swipe-to-delete + Repo delete + undo)
- Each slice must:
- Deliver observable functionality
- Be testable in isolation
- Leave
./gradlew buildpassing
Step 4: Write Structured Tasks
- Check for an incomplete plan first. If
tasks/plan.mdortasks/todo.mdalready exists with unchecked tasks:
- Same work being replanned (the user asked to revise or extend it) → update the files in place
- Different work → stop and ask. The unchecked tasks may be mid-build in another session. Don't delete, overwrite, or rename them; let the user decide (finish the old plan, discard it explicitly, or say where the new plan goes). The same applies to an external tracker: never bulk-close another plan's open items to make room.
- Create `tasks/plan.md` with the dependency graph and approach. Always markdown — design decisions, risks, and open questions don't map onto tracker issues.
- Record tasks in the task list target, in execution order:
- Default: `tasks/todo.md` — the checklist the
/buildcommand expects - External tracker: if the project's agent rules (
AGENTS.md,CLAUDE.md) or the user designate one (GitHub Issues, Jira, Linear, …), create one item per task instead of writingtasks/todo.md. Put acceptance criteria and verification in the item body, dependencies in the tracker's "blocked by" links, and note the tracker intasks/plan.mdwith an ordered index of item IDs so future sessions know where to look.
Each task uses this structure, in either target:
markdown
## Tasks### Task 1: [Short description]**Files:** `feature/src/.../ItemListScreen.kt`, `core/data/src/.../ItemDao.kt`**Acceptance criteria:**-Item list loads from Room database-Empty state shown when no items exist-Loading state shown during fetch**Verification:**-[ ] `./gradlew test` passes-[ ] `./gradlew assembleDebug` succeeds-[ ] Compose Preview renders correctly
Step 5: Order by Dependencies
- Sequence tasks so each builds on the previous
- Add checkpoints every 2–3 tasks: run full test suite, review with human
- Flag risks on tasks with uncertainty — mark as "spike" if investigation needed
Task Sizing Guide
| Size | Files | Duration | Action | |
|---|---|---|---|---|
| Small | 1–2 | < 30 min | Execute directly | |
| Medium | 3–5 | 30–60 min | Execute with checkpoint | |
| Large | 6+ | > 60 min | Split further |
Split when: task touches >2 independent subsystems, or acceptance criteria exceed 5 items.
Common Rationalizations
| Shortcut | Why It Fails | |
|---|---|---|
| "I'll plan as I go" | Without a task list, you lose track of scope and dependencies. Rework multiplies. | |
| "The spec is the plan" | Specs describe what. Plans describe how and in what order. | |
| "Planning takes too long" | A 10-minute plan prevents hours of backtracking. | |
| "I know this codebase, I don't need a plan" | Plans catch dependency gaps that familiarity masks. | |
"The old tasks/plan.md is stale, I'll just replace it" | Unchecked tasks may be mid-build in another session. Overwriting them destroys work state that exists nowhere else. Stop and ask. |
Red Flags
- Implementing without a written task list
- Overwriting a
tasks/plan.mdortasks/todo.mdthat still has unchecked tasks for different work, without asking - Writing
tasks/todo.mdwhen the project designated an external tracker (or scattering tasks across both) - Tasks missing acceptance criteria
- No verification steps on tasks
- Tasks spanning >5 files without splitting
- No checkpoints between tasks
- Horizontal slicing (all DAOs, then all repos, then all VMs)
Verification
- [ ]
tasks/plan.mdexists with dependency graph - [ ] Ordered tasks recorded in the task list target (default
tasks/todo.md) - [ ] No pre-existing incomplete plan was overwritten without explicit user confirmation
- [ ] Every task has acceptance criteria and verification steps
- [ ] Tasks are vertically sliced (each delivers observable functionality)
- [ ] No task exceeds "Large" sizing without justification
- [ ] Checkpoints placed every 2–3 tasks
- [ ] Human has reviewed the plan before implementation starts