<< All versions

Skill v1.0.1

currentAutomated scan100/100
guillemroca/agent-skills-android/shipping-and-launch

+3 new

──Details
PublishedOctober 29, 2026 at 09:18 AM
Content Hashsha256:7d6df809a8bec5b9...
Git SHA68fd141eec5a
Bump Typepatch
Compare with v1.0.0
──Files
Files (1 file, 10.5 KB)
SKILL.md10.5 KBactive
SKILL.md · 264 lines · 10.5 KB

name: shipping-and-launch description: >- Use when preparing to release an Android app to production. Pre-launch checklist covering code quality, security, performance, accessibility, Play Store requirements, staged rollout, and rollback planning. metadata: version: "1.0.1"


Shipping and Launch

Overview

"Ship with confidence. Deploy safely, with monitoring, rollback plan ready." Shipping isn't just uploading an AAB — it's verifying that everything is production-ready, staging the rollout, monitoring for issues, and having a rollback plan if things go wrong.

When to Use

  • Before any release to Play Store (internal, alpha, beta, production)
  • Before any release via Firebase App Distribution
  • When promoting from one release track to another
  • After a hotfix that needs expedited release

Skip when: Not releasing (local development only).

Core Process

Step 1: Pre-Launch Checklist

  1. Code Quality:
bash
# All tests pass
./gradlew test
./gradlew connectedAndroidTest
# Build succeeds
./gradlew bundleRelease
# No lint errors
./gradlew lint
# Formatting is consistent
./gradlew spotlessCheck
# Static analysis passes
./gradlew detekt
  1. Manual code checks:
  • [ ] No TODO or FIXME without issue references
  • [ ] No Log.d() or Log.v() calls in production code (use ProGuard to strip)
  • [ ] No hardcoded strings in UI (use stringResource)
  • [ ] No BuildConfig.DEBUG-gated features shipping to production
  • [ ] Feature flags for incomplete features are OFF
  1. Security (see security-and-hardening):
  • [ ] No secrets in source code
  • [ ] Network Security Config enforces HTTPS
  • [ ] Certificate pinning configured
  • [ ] ProGuard/R8 enabled for release build
  • [ ] android:debuggable not set in release manifest
  • [ ] Dependency vulnerability scan clean
  1. Performance (see performance-optimization):
  • [ ] Android Vitals targets met (startup < 500ms, jank < 5%)
  • [ ] APK/AAB size within budget
  • [ ] Baseline Profiles included
  • [ ] No ANR-prone patterns (main thread blocking)
  • [ ] Images optimized (WebP, proper sizing)
  1. Accessibility (see android-accessibility):
  • [ ] TalkBack tested on all screens
  • [ ] Accessibility Scanner reports zero critical issues
  • [ ] Touch targets >= 48dp
  • [ ] Color contrast meets standards
  • [ ] Content descriptions on all meaningful elements
  1. Infrastructure:
  • [ ] Signing configuration correct (release keystore)
  • [ ] Environment-specific configs correct (API URLs, feature flags)
  • [ ] Crashlytics/error monitoring configured
  • [ ] Firebase Performance Monitoring enabled
  • [ ] Analytics events verified
  1. Documentation:
  • [ ] Release notes written
  • [ ] Play Store listing updated (screenshots, description)
  • [ ] ADRs written for significant changes
  • [ ] Internal changelog updated

Step 2: Staged Rollout

  1. Rollout progression:
Internal Testing (Play Store internal track)
→ Verified by team
↓
Closed Alpha (Play Store alpha track)
→ Verified by internal testers + QA
↓
Open Beta (Play Store beta track)
→ Verified by beta users (wider audience)
↓
Production (staged rollout)
→ 1% → 5% → 25% → 50% → 100%
  1. Staged rollout with Play Store:
Day 0: Release to 1% of users
→ Monitor Crashlytics, ANR rate, user feedback
Day 1: If clean → expand to 5%
→ Check Play Console Android Vitals
Day 3: If clean → expand to 25%
→ Review user reviews and ratings
Day 5: If clean → expand to 50%
Day 7: If clean → expand to 100%
  1. Decision thresholds:
MetricAction
Crash rate > 2x previous versionHalt rollout, investigate
ANR rate > 0.47%Halt rollout, investigate
Negative reviews spike > 2xHalt rollout, investigate
Error rate > 0.1% new errorsInvestigate, consider halt
Startup time regression > 20%Investigate, consider halt

Error Budget Release Gate

The thresholds above decide whether this rollout continues; the error budget decides whether you should be starting a rollout at all. Set a stability SLO — typically crash-free users (e.g. 99.5%) plus user-perceived crash and ANR rates below the Play bad-behavior thresholds (1.09% / 0.47%, see observability-and-instrumentation). The budget is the gap between the SLO and reality over a 28-day window, the same window Play Vitals uses:

kotlin
// SLO 99.5% crash-free users → 0.5% of users may crash in 28 days
fun budgetRemaining(sloCrashFree: Double, actualCrashFree28d: Double): Double {
val allowed = 1.0 - sloCrashFree // 0.005
val consumed = 1.0 - actualCrashFree28d // e.g. 0.003 at 99.7% crash-free
return ((allowed - consumed) / allowed).coerceAtLeast(0.0) // 0.4 → 40% left
}

Use it as an objective gate, not a negotiation:

Budget remaining > 20% → Normal staged rollout (1% → 5% → 25% → 50% → 100%)
Budget remaining 0–20% → Slow rollouts only: smaller steps, longer bake per step,
no high-risk changes (migrations, SDK upgrades, rewrites)
Budget exhausted → Freeze feature releases; ship only stability fixes
Play Vitals threshold → Treat as exhausted — Play may already be reducing
breached store visibility, so every release must lower the rate
Budget recovers → Resume normal pace; keep the fix that recovered it

Burn rate during rollout: a crash or ANR rate on the newest version that is rising faster than the previous version's baseline is a halt signal (Play Console → Halt rollout), even while every row in the thresholds table is still green. The mobile twist makes the gate stricter than on a server: you cannot roll back an installed binary. Remediation is halt plus hotfix forward, or a Remote Config kill switch (see Step 4) — so budget spent at 25% rollout stays spent until users take the next update.

Step 3: Feature Flag Management

  1. Feature flag lifecycle:
Created (disabled) → Enabled (internal) → Canary (5%) →
Expanded (25%) → Full (100%) → Removed (cleanup)
  1. Before shipping:
  • Verify all feature flags are in expected state
  • Remove flags for fully-rolled-out features (tech debt)
  • Document flag state in release notes

Step 4: Rollback Plan

  1. Always have a rollback strategy:
markdown
## Rollback Plan
### Option 1: Halt Staged Rollout
-In Play Console → Release → Production → Halt rollout
-Users who haven't updated keep the old version
-Already-updated users keep the new version (no downgrade)
### Option 2: Emergency Hotfix
-Create `hotfix/1.2.1` branch from `release/1.2.0`
-Apply minimal fix
-Fast-track through CI → Internal → Production (100%)
### Option 3: Feature Flag Kill Switch
-Disable the problematic feature via Firebase Remote Config
-Users get the update but broken feature is hidden
-Fastest response time (no new build needed)

Step 5: Post-Launch Monitoring

  1. First 24 hours after launch:
  • [ ] Crashlytics — new crash types?
  • [ ] ANR rate — within threshold?
  • [ ] Firebase Performance — startup time, network latency?
  • [ ] Play Console — user reviews, ratings?
  • [ ] Error monitoring — new error patterns?
  • [ ] Critical user flows — working end-to-end?
  1. First 7 days:
  • [ ] Android Vitals in Play Console — all green?
  • [ ] Staged rollout expanded on schedule?
  • [ ] Feature flag cleanup scheduled?
  • [ ] Retro/post-mortem if issues occurred

Step 6: Play Store Requirements

  1. Play Store checklist:
  • [ ] Target SDK meets Play Store requirements (the latest stable API level — new apps and updates must target API 36+ from Aug 31, 2026; check the current deadline at developer.android.com/google/play/requirements/target-sdk)
  • [ ] 16 KB page-size compliance verified if the app ships native libraries (required since Nov 2025 for apps targeting Android 15+; needs NDK r28+ / AGP 8.5.1+)
  • [ ] Edge-to-edge rendering verified (enforced for apps targeting Android 15+; no statusBarColor/navigationBarColor reliance)
  • [ ] Privacy policy URL set
  • [ ] Data safety form completed
  • [ ] Content rating questionnaire completed
  • [ ] App signing by Google Play enabled
  • [ ] AAB format (not APK) for new apps
  • [ ] Deobfuscation mapping file uploaded (R8/ProGuard)
  • [ ] Release notes in all supported languages

Common Rationalizations

ShortcutWhy It Fails
"We'll skip staged rollout, the tests pass"Tests don't catch device-specific bugs, carrier issues, or user-facing performance.
"Rollback plan isn't needed, it's a small change"Small changes can have outsized impact. A 1-line change can cause a crash.
"We'll monitor tomorrow"The first few hours are critical. Issues compound overnight.
"Let's ship 100% — we're confident"Confidence without staged rollout is hope, not engineering.
"The crash rate is under the halt threshold, keep expanding"Check the burn rate, not just the current rate. A newest-version crash/ANR rate climbing faster than baseline is a halt signal while every threshold is still green — and installed binaries can't be rolled back.
"The budget is gone, but this feature is already done"An exhausted budget means stability fixes only. Shipping features on top of a burning release spends budget you don't have and risks Play visibility.

Red Flags

  • No staged rollout (0% to 100% in one step)
  • No rollback plan documented
  • No monitoring configured before launch
  • Log.d calls in release builds
  • Hardcoded debug URLs shipping to production
  • Feature flags in unknown state
  • No Play Store compliance check
  • Missing deobfuscation mapping file upload
  • Launching on Friday (no monitoring over weekend)
  • Error budget exhausted (or a Vitals threshold breached) but feature releases continue unchanged
  • No stability SLO defined, so "is it safe to ship?" is decided by mood

Verification

  • [ ] Pre-launch checklist complete (quality, security, performance, accessibility)
  • [ ] Release build signed with production keystore
  • [ ] Staged rollout plan defined
  • [ ] Error budget checked against the 28-day stability SLO, and the rollout pace matches the gate (normal / slow / stability-fixes-only)
  • [ ] Rollback strategy documented
  • [ ] Monitoring configured (Crashlytics, Performance, Analytics)
  • [ ] Play Store requirements met
  • [ ] Release notes written
  • [ ] Team aware of launch timeline
  • [ ] Post-launch monitoring plan in place
← v1.0.0All versions