Shipping and Launch
Overview
"Ship with confidence. Deploy safely, with monitoring, rollback plan ready." Shipping isn't just uploading an AAB — it's verifying that everything is production-ready, staging the rollout, monitoring for issues, and having a rollback plan if things go wrong.
When to Use
- Before any release to Play Store (internal, alpha, beta, production)
- Before any release via Firebase App Distribution
- When promoting from one release track to another
- After a hotfix that needs expedited release
Skip when: Not releasing (local development only).
Core Process
Step 1: Pre-Launch Checklist
- Code Quality:
# All tests pass./gradlew test./gradlew connectedAndroidTest# Build succeeds./gradlew bundleRelease# No lint errors./gradlew lint# Formatting is consistent./gradlew spotlessCheck# Static analysis passes./gradlew detekt
- Manual code checks:
- [ ] No
TODOorFIXMEwithout issue references - [ ] No
Log.d()orLog.v()calls in production code (use ProGuard to strip) - [ ] No hardcoded strings in UI (use
stringResource) - [ ] No
BuildConfig.DEBUG-gated features shipping to production - [ ] Feature flags for incomplete features are OFF
- Security (see
security-and-hardening):
- [ ] No secrets in source code
- [ ] Network Security Config enforces HTTPS
- [ ] Certificate pinning configured
- [ ] ProGuard/R8 enabled for release build
- [ ]
android:debuggablenot set in release manifest - [ ] Dependency vulnerability scan clean
- Performance (see
performance-optimization):
- [ ] Android Vitals targets met (startup < 500ms, jank < 5%)
- [ ] APK/AAB size within budget
- [ ] Baseline Profiles included
- [ ] No ANR-prone patterns (main thread blocking)
- [ ] Images optimized (WebP, proper sizing)
- Accessibility (see
android-accessibility):
- [ ] TalkBack tested on all screens
- [ ] Accessibility Scanner reports zero critical issues
- [ ] Touch targets >= 48dp
- [ ] Color contrast meets standards
- [ ] Content descriptions on all meaningful elements
- Infrastructure:
- [ ] Signing configuration correct (release keystore)
- [ ] Environment-specific configs correct (API URLs, feature flags)
- [ ] Crashlytics/error monitoring configured
- [ ] Firebase Performance Monitoring enabled
- [ ] Analytics events verified
- Documentation:
- [ ] Release notes written
- [ ] Play Store listing updated (screenshots, description)
- [ ] ADRs written for significant changes
- [ ] Internal changelog updated
Step 2: Staged Rollout
- Rollout progression:
Internal Testing (Play Store internal track)→ Verified by team↓Closed Alpha (Play Store alpha track)→ Verified by internal testers + QA↓Open Beta (Play Store beta track)→ Verified by beta users (wider audience)↓Production (staged rollout)→ 1% → 5% → 25% → 50% → 100%
- Staged rollout with Play Store:
Day 0: Release to 1% of users→ Monitor Crashlytics, ANR rate, user feedbackDay 1: If clean → expand to 5%→ Check Play Console Android VitalsDay 3: If clean → expand to 25%→ Review user reviews and ratingsDay 5: If clean → expand to 50%Day 7: If clean → expand to 100%
- Decision thresholds:
| Metric | Action | |
|---|---|---|
| Crash rate > 2x previous version | Halt rollout, investigate | |
| ANR rate > 0.47% | Halt rollout, investigate | |
| Negative reviews spike > 2x | Halt rollout, investigate | |
| Error rate > 0.1% new errors | Investigate, consider halt | |
| Startup time regression > 20% | Investigate, consider halt |
Error Budget Release Gate
The thresholds above decide whether this rollout continues; the error budget decides whether you should be starting a rollout at all. Set a stability SLO — typically crash-free users (e.g. 99.5%) plus user-perceived crash and ANR rates below the Play bad-behavior thresholds (1.09% / 0.47%, see observability-and-instrumentation). The budget is the gap between the SLO and reality over a 28-day window, the same window Play Vitals uses:
// SLO 99.5% crash-free users → 0.5% of users may crash in 28 daysfun budgetRemaining(sloCrashFree: Double, actualCrashFree28d: Double): Double {val allowed = 1.0 - sloCrashFree // 0.005val consumed = 1.0 - actualCrashFree28d // e.g. 0.003 at 99.7% crash-freereturn ((allowed - consumed) / allowed).coerceAtLeast(0.0) // 0.4 → 40% left}
Use it as an objective gate, not a negotiation:
Budget remaining > 20% → Normal staged rollout (1% → 5% → 25% → 50% → 100%)Budget remaining 0–20% → Slow rollouts only: smaller steps, longer bake per step,no high-risk changes (migrations, SDK upgrades, rewrites)Budget exhausted → Freeze feature releases; ship only stability fixesPlay Vitals threshold → Treat as exhausted — Play may already be reducingbreached store visibility, so every release must lower the rateBudget recovers → Resume normal pace; keep the fix that recovered it
Burn rate during rollout: a crash or ANR rate on the newest version that is rising faster than the previous version's baseline is a halt signal (Play Console → Halt rollout), even while every row in the thresholds table is still green. The mobile twist makes the gate stricter than on a server: you cannot roll back an installed binary. Remediation is halt plus hotfix forward, or a Remote Config kill switch (see Step 4) — so budget spent at 25% rollout stays spent until users take the next update.
Step 3: Feature Flag Management
- Feature flag lifecycle:
Created (disabled) → Enabled (internal) → Canary (5%) →Expanded (25%) → Full (100%) → Removed (cleanup)
- Before shipping:
- Verify all feature flags are in expected state
- Remove flags for fully-rolled-out features (tech debt)
- Document flag state in release notes
Step 4: Rollback Plan
- Always have a rollback strategy:
## Rollback Plan### Option 1: Halt Staged Rollout-In Play Console → Release → Production → Halt rollout-Users who haven't updated keep the old version-Already-updated users keep the new version (no downgrade)### Option 2: Emergency Hotfix-Create `hotfix/1.2.1` branch from `release/1.2.0`-Apply minimal fix-Fast-track through CI → Internal → Production (100%)### Option 3: Feature Flag Kill Switch-Disable the problematic feature via Firebase Remote Config-Users get the update but broken feature is hidden-Fastest response time (no new build needed)
Step 5: Post-Launch Monitoring
- First 24 hours after launch:
- [ ] Crashlytics — new crash types?
- [ ] ANR rate — within threshold?
- [ ] Firebase Performance — startup time, network latency?
- [ ] Play Console — user reviews, ratings?
- [ ] Error monitoring — new error patterns?
- [ ] Critical user flows — working end-to-end?
- First 7 days:
- [ ] Android Vitals in Play Console — all green?
- [ ] Staged rollout expanded on schedule?
- [ ] Feature flag cleanup scheduled?
- [ ] Retro/post-mortem if issues occurred
Step 6: Play Store Requirements
- Play Store checklist:
- [ ] Target SDK meets Play Store requirements (the latest stable API level — new apps and updates must target API 36+ from Aug 31, 2026; check the current deadline at developer.android.com/google/play/requirements/target-sdk)
- [ ] 16 KB page-size compliance verified if the app ships native libraries (required since Nov 2025 for apps targeting Android 15+; needs NDK r28+ / AGP 8.5.1+)
- [ ] Edge-to-edge rendering verified (enforced for apps targeting Android 15+; no
statusBarColor/navigationBarColorreliance) - [ ] Privacy policy URL set
- [ ] Data safety form completed
- [ ] Content rating questionnaire completed
- [ ] App signing by Google Play enabled
- [ ] AAB format (not APK) for new apps
- [ ] Deobfuscation mapping file uploaded (R8/ProGuard)
- [ ] Release notes in all supported languages
Common Rationalizations
| Shortcut | Why It Fails | |
|---|---|---|
| "We'll skip staged rollout, the tests pass" | Tests don't catch device-specific bugs, carrier issues, or user-facing performance. | |
| "Rollback plan isn't needed, it's a small change" | Small changes can have outsized impact. A 1-line change can cause a crash. | |
| "We'll monitor tomorrow" | The first few hours are critical. Issues compound overnight. | |
| "Let's ship 100% — we're confident" | Confidence without staged rollout is hope, not engineering. | |
| "The crash rate is under the halt threshold, keep expanding" | Check the burn rate, not just the current rate. A newest-version crash/ANR rate climbing faster than baseline is a halt signal while every threshold is still green — and installed binaries can't be rolled back. | |
| "The budget is gone, but this feature is already done" | An exhausted budget means stability fixes only. Shipping features on top of a burning release spends budget you don't have and risks Play visibility. |
Red Flags
- No staged rollout (0% to 100% in one step)
- No rollback plan documented
- No monitoring configured before launch
Log.dcalls in release builds- Hardcoded debug URLs shipping to production
- Feature flags in unknown state
- No Play Store compliance check
- Missing deobfuscation mapping file upload
- Launching on Friday (no monitoring over weekend)
- Error budget exhausted (or a Vitals threshold breached) but feature releases continue unchanged
- No stability SLO defined, so "is it safe to ship?" is decided by mood
Verification
- [ ] Pre-launch checklist complete (quality, security, performance, accessibility)
- [ ] Release build signed with production keystore
- [ ] Staged rollout plan defined
- [ ] Error budget checked against the 28-day stability SLO, and the rollout pace matches the gate (normal / slow / stability-fixes-only)
- [ ] Rollback strategy documented
- [ ] Monitoring configured (Crashlytics, Performance, Analytics)
- [ ] Play Store requirements met
- [ ] Release notes written
- [ ] Team aware of launch timeline
- [ ] Post-launch monitoring plan in place