Skill v1.0.0
currentAutomated scan100/100version: "1.0.0" type: Skill name: archicad-basic-workflow description: "This skill should be used when architects need to understand Archicad project setup, BIM modeling workflow, view organization, drawing production, and publishing processes. Scope: project setup and modeling workflow only — actual drawing production, issue sets and PDF/DWG publishing belong to archicad-documentation. Trigger words: Archicad 建模、專案設定。" license: CC-BY-SA-4.0 compatibility: claude-code,opencode,agent-skills metadata: audience: architects region: taiwan class: A
Archicad Basic Workflow
This skill covers the core Archicad workflow for architectural projects, from project setup and model organization to view creation, layout documentation, coordination, and publishing.
Section 1: Project Startup
1.1 Initial Setup Checklist
| Item | Purpose | Typical Decision | |
|---|---|---|---|
| Project origin | Defines the shared reference point | Align with survey or agreed BIM coordination point | |
| Stories | Controls vertical building levels | Match architectural levels and structural datums | |
| Grid system | Establishes planning and structural references | Coordinate with structural consultant | |
| Units | Controls display and documentation precision | Set by office standard and project phase | |
| Project location | Supports sun studies and geolocation | Use site location when relevant | |
| Attributes | Controls graphic and BIM consistency | Start from office template where possible |
1.2 Recommended Early Decisions
- Confirm project phase and expected deliverables before modeling in detail.
- Set story heights before placing major walls, slabs, stairs, and curtain walls.
- Establish layer combinations, model view options, and renovation filters early.
- Use favorites for repeated assemblies, components, and annotation types.
- Define naming conventions for views, layouts, zones, modules, and hotlinks.
Section 2: Modeling Workflow
2.1 Model From Big To Small
Start with architectural massing and primary building systems before detailed components.
| Stage | Model Focus | Output | |
|---|---|---|---|
| Concept | Massing, levels, gross zones | Feasibility diagrams and area checks | |
| Schematic | Walls, slabs, openings, stairs | Plans, sections, elevations, basic schedules | |
| Design development | Assemblies, key details, consultant references | Coordinated drawings and model review | |
| Construction documents | Accurate dimensions, annotations, details | Permit or construction drawing package |
2.2 Core Elements
- Use walls, slabs, roofs, shells, columns, beams, stairs, railings, doors, and windows as native BIM elements.
- Use Morphs and Objects only when native tools cannot represent the design intent efficiently.
- Keep classification, ID, layer, renovation status, and surface settings consistent.
- Avoid over-modeling details that should be drawn as 2D details or worksheets.
Section 3: Views And Documentation
3.1 View Structure
| Archicad Area | Role | |
|---|---|---|
| Project Map | Raw model viewpoints | |
| View Map | Saved documentation views with scale and graphic settings | |
| Layout Book | Sheet composition and title block management | |
| Publisher Sets | Export sets for PDF, DWG, BIMx, or coordination packages |
3.2 View Settings To Control
- Scale
- Layer combination
- Model view options
- Graphic overrides
- Pen set
- Renovation filter
- Dimension standard
- Partial structure display
Section 4: Coordination Rhythm
4.1 Weekly Coordination Cycle
- Update linked references, survey files, and consultant models.
- Review clashes and design changes in 3D and section.
- Resolve ownership: architectural, structural, MEP, interior, or client decision.
- Update saved views and affected layouts.
- Publish a dated coordination set.
4.2 Quality Checks
- Model origin and consultant model alignment.
- Story height and level consistency.
- Door and window IDs.
- Zone names, numbers, and areas.
- Layout issue date and revision status.
- PDF output scale and title block information.