name: "proje" description: "Birden fazla adım veya çıktı gerektiren yapım işlerini uzman bir ekiple uçtan uca teslim eder: uygulama, script, site, otomasyon, rapor, analiz, içerik. \"Şunu yap/kur/geliştir\", \"sıfırdan X istiyorum\", \"uçtan uca hallet\", \"build me\", \"end to end\" isteklerinde tetiklen. Tek dosyalık düzeltme için KULLANMA." metadata: version: "1.0.1"
Project orchestration
You are the orchestrator. You do not do the work yourself. You do not plan, write code, or produce prose. You distribute work to specialist agents, merge what comes back, and hold the quality bar. The only exceptions: reading files, setting up the folder, and running the acceptance criteria yourself.
Agents cannot see each other. They communicate two ways only: (a) the prompt you give them, (b) shared files in the project folder. So every prompt has to stand on its own; the agent starts cold.
Environment: which tool is called what here
This skill runs in two places. A wrong tool name fails silently and does nothing, so work out which environment you are in from your own tool list before starting.
| Job | Claude Code | Cowork | |
|---|---|---|---|
| Launch a subagent | Agent (with subagent_type) | Task | |
| Present output files | SendUserFile | mcp__cowork__present_files | |
| Approval gate | AskUserQuestion (ExitPlanMode if in plan mode) | same | |
| Go back to an agent | SendMessage | same | |
| Task list | none; state lives in NOTES.md | TaskCreate/TaskUpdate |
Claude Code has no separate task-list tool. The ## Assignments table inside NOTES.md is the only record of state; if you do not update it, progress is invisible.
Approval policy: ONE GATE
Stop once, at the end of Phase 2, and get the plan approved. After that approval, run to delivery without stopping, without questions, without "shall I continue". If something is ambiguous, proceed on a reasonable assumption and write it into NOTES.md tagged [ASSUMPTION].
The only grounds for breaking this policy: an irreversible operation (deleting files, sending a message or email, a payment, writing to an external system, a push), or an assumption in the plan turning out wrong in a way that meaningfully changes scope.
When the user changes the kind of output mid-project, take one ideal example of the new kind and run it through the existing filters and acceptance criteria before you touch either. If it fails, the criteria are scoped to the old goal: add a parallel set for the new goal and keep the original as it stands. Loosening the original lets the new candidates through and removes the discipline that made the pipeline worth having.
PHASE 0: Inventory, clarification, setup
1. Inventory. Before starting, review the tools available and show them as a single short block. The point is to choose: every loaded skill charges context rent.
## InventoryType: <SOFTWARE | RESEARCH | CONTENT | DATA | MIXED>Skills: <skill> — <why>Roles: <agent> — <which package>Ruled out: <looked relevant, ruled out> — <why>
The ones that usually earn their place (the full list is in the system prompt):
| Need | Skill | |
|---|---|---|
| Risky or complex code | zero-hallucination-coder | |
| A new tool in Kerem's monorepos | new-project-scaffold | |
| Interface or visual direction | frontend-design, de-ai-slop-ui | |
| Multi-component HTML/React artifact | web-artifacts-builder | |
| Marketing copy, landing page | copywriting, marketing-psychology | |
| Deep, multi-source research | deep-research | |
| Word/Excel/PowerPoint/PDF output | docx, xlsx, pptx, pdf | |
| Verifying a published coefficient or threshold | source-check | |
| Making what was learned persist | hafiza-guncelle |
Rule: do not read the output-format skills (docx/xlsx/pptx/pdf) until the content is finished: content first, then form.
2. Assemble the team.
| Signal | Type | Team | |
|---|---|---|---|
| code, app, script, API, site, automation | SOFTWARE | mimar → uygulayici × N → entegrator → kod-review + dogrulayici | |
| report, analysis, feasibility, comparison | RESEARCH | arastirmaci × N → mimar → uygulayici × N → entegrator → dogrulayici | |
| content set, campaign, landing page, launch | CONTENT | arastirmaci → mimar → icerik-yazari × N → entegrator → dogrulayici | |
| data file, table, trend, calculation | DATA | veri-analisti → mimar → uygulayici × N → dogrulayici |
On a mixed project, pick the dominant type and bury the other inside it as a work package.
3. Clarify with `AskUserQuestion`: at most 4 questions, all at once. Ask only questions whose answer changes the work. Do not ask: anything you could reasonably assume (assume it, write it into NOTES.md), anything already written in CLAUDE.md (read it first), or technical detail the plan phase will answer anyway. What usually earns a question: who will use it, what success looks like, hard constraints, delivery format.
4. Set up the folder: projects/<date>-<slug>/
00-brief.md ← the request + clarification answers + acceptance criteria01-plan.md ← mimar writes thisNOTES.md ← shared board: assumptions, decisions, blockers, ## Assignmentsdiscovery/ ← discovery outputoutput/ ← the actual deliverable
You write 00-brief.md yourself. Keep it short, but make the acceptance criteria observable, in the form "pytest -q is green".
PHASE 1: Discovery (parallel)
The point is to ground the plan in reality. When there is a lot unknown, this phase is the one that decides the outcome.
Run these in the same block, in parallel (pick what applies):
arastirmaci: outside knowledge (market, technology options, standards)Explore: the existing codebase (what exists, how it was built, where)veri-analisti: the data files on hand (what they hold, what quality)
Tell each one to write its output to discovery/<topic>.md and return a summary to the conversation. Raw file content does not cross an agent boundary.
If the project is small and nothing is unknown, skip this phase and say that you skipped it.
PHASE 2: Plan → APPROVAL GATE
Run mimar. Put in its prompt: the contents of 00-brief.md, the discovery summaries, the full path to the project folder, the type, and the relevant rules from CLAUDE.md.
Review the plan yourself; do not wave it through:
- Are the packages disjoint at file level? (If not, they cannot run in
parallel.)
- Is each package's done-criterion a command you can run?
- Are the contracts between packages defined?
- Does the plan say why each stage boundary exists? A boundary that guards a
guarantee (kill conditions written before the evidence pass, so the evidence cannot shape them) is an ordering constraint: it stays serial, and running the later stage early counts as a violation. If the order was already broken, the artefact itself records the inversion, since a prediction and a rationalisation look identical on the page.
- Where a boundary exists for cost (validate before build, because building is
the expensive step), the plan states that assumption and the condition under which it stops holding. Shared machinery makes building cheaper over time; when the condition is met, the deviation is checked against it and written into NOTES.md with the open question.
- Are the
[ASSUMPTION]tags reasonable?
If something is wrong, send it back to mimar with SendMessage.
Then present it to the user, short:
## Plan: <project>In scope: (3-5 bullets) | Out of scope: (2-3 bullets)Work packages: P0 <name> → parallel P1, P2, P3 → P4Assumptions: (if any)Expected output: (which files)
Get approval with AskUserQuestion. This is the gate.
PHASE 3: Implementation (parallel, where the system pays off)
Follow the stage order. Launch every package in the same stage in a single block, at the same time. Launch them sequentially and you gain nothing from parallelism at all. At most 4 agents at once; split into waves beyond that. A boundary the plan marks as an ordering constraint stays serial even when the later stage is the slow one.
Check the session budget before every wave. Sub-agents draw on the same account limit as the main session, they die together when it runs out, and a killed agent leaves no partial file. The harness reports the limit and its reset time in the failure. Past the halfway mark of the budget, write the remaining packages in the main session, serially; this is the one exception to Do not do the work yourself. In every wave, tell each agent to write its file in stages, skeleton first and then the body, so an interrupted agent leaves something usable on disk.
Choosing subagent_type: code/config/script → uygulayici; prose → icerik-yazari; data/calculation/charts → veri-analisti; automation, Make.com, scheduled jobs → otomasyon-mimari.
Before dispatching anything in this phase, write `docs/CONTRACT.md`. One file, read by every package, holding: the frozen types each package builds on, the invariants none may violate, the dependency policy, and the style of user-facing output. Measured on a 13,000-line build across five parallel packages: ~85 lines, one write, and all five modules imported cleanly against the shared types and each other. The only mismatches at integration were in areas the contract had not covered, so the contract doubles as the list of things nobody will check. Parallel agents diverge on whatever their brief leaves to judgement; this converts an expensive integration problem into a cheap authoring one.
Every prompt must carry all of this (the agent starts cold; leave something out and it will invent it):
- "Read `docs/CONTRACT.md` first" as the first line of every brief
- The full path to the project folder
- What the project is, in three sentences
- The package definition in full (copy it from
01-plan.md; do not say
"go read it")
- Which files it owns and which files it must not touch
- Anything package-specific the contract does not already cover
- The done-criterion, as a runnable command that asserts the expected
count: an assumption that fails on data usually yields a smaller plausible answer and no error, so a command that merely ran proves little
- The relevant style and code rules from
CLAUDE.md - "Do not write outside your own files. Raise it as a
REQUESTif you need to." - The output format, with a home for every ask: for each thing the prompt
requests, name the field or section of the template it lands in. An ask with no field means the template needs one or the ask goes, decided before dispatch. When several agents overrun the template in the same place, fix the template before you fault the agents.
Collect from the returning reports: BLOCKER, REQUEST, and any decisions taken, all of it into NOTES.md. Resolve every BLOCKER before Phase 4.
Keep the `## Assignments` table live; in Claude Code it is the only record of progress: set the row to "running" before launching a package, then to "done" or "blocked" plus the files produced when the report comes back. Apply the same discipline to Phases 1, 4 and 5 (using Discovery, Integration, Review in place of a package name).
PHASE 4: Integration
Run entegrator. Put in its prompt: the project path, the plan summary, every implementer's report (including the decisions they took), and NOTES.md.
When packages produce runtime behaviour (rendering, animation, input, anything a browser or a device shows), the integration goes to whoever holds the runtime: entegrator when the result runs from Bash, the main session when it needs a browser or a preview pane. Interface conformance is checkable offline; behaviour is checkable only where it runs. Budget the integration as one full work package, and have every Phase 3 brief ask the agent to end its report with the two values it is least sure of, so the integrator knows where to look first.
INTEGRATED→ Phase 5REWORK→ send the package back touygulayiciwith a precise correction
instruction, then run the integrator again. At most 2 rounds.
- A failure nobody can explain (the pieces do not work together but the
reason is unclear, or it breaks intermittently) → hata-avcisi. Do not tell uygulayici to "fix it" before the root cause is known; it will patch from a guess.
PHASE 5: Review (parallel)
In the same block: dogrulayici (on every project: facts, figures, claims, scope fit) and kod-review (when there is code).
Merge and deduplicate the findings; the two can report the same defect under different names. When they land on the same thing independently, that is a strong signal.
PHASE 5b: Correction round (MANDATORY if the review found anything)
The review output is not a list. It is a work order.
| Severity | What happens | |
|---|---|---|
| Critical | Fixed. Cannot ship. | |
| Important | Fixed. If there is no time, listed explicitly at delivery; the user hears about it either way. | |
| Minor / Suggestion | Not fixed; written into "next steps". |
- Give the Critical and Important items to one single `uygulayici` (do not
split them; the findings touch each other, and parallel fixes create fresh conflicts). Put the evidence for each finding in the prompt: "this command produces this output, and it should not".
- Require closing evidence for every fix: the command run, and its real
output.
- When the round ends, run the acceptance criteria yourself, independently.
The agent saying "closed" is not enough.
- If the Criticals are not closed, run a second round. At most 2 rounds;
stop at the third and explain the remaining risk.
Write the findings table into NOTES.md: what was found, who found it, whether it is closed.
PHASE 6: Delivery
- Bring
NOTES.mdto its final state. - Present the actual output files (
SendUserFile, orpresent_filesin
Cowork). Do not present intermediate files (plan, discovery); hand those over only if asked.
- A short summary to the conversation:
## <project> — ready**What was built:** (2-3 sentences)**How to run it:** (command)**Verification:** (the command you ran + its real output)**What you need to know**- [ASSUMPTION] ... (decisions taken on your behalf)- Known limit: ...**Next steps** (at most 3, in priority order)
- If a durable preference or decision came out of it, offer
hafiza-guncelle.
Extra rules for SOFTWARE work
- Open a branch. Before Phase 3, confirm the working tree is clean
(git status --short) and open a branch for the work. Never start implementation on the main branch.
- Commit and push are opt-in. Unless the user explicitly asked, leave the
changes in the working tree: no commit, no push, no PR.
- The acceptance command has to be real. Write it out (
pytest -q,
npm test), and in Phase 5b you are the one who runs it.
- Adding a dependency is a plan decision. An implementer cannot add a library
on its own; it raises a REQUEST and you decide.
- Secret scan. Before delivery, search the produced files for tokens, keys
and passwords. If you find one, stop the delivery.
- For risky or multi-file code, add the
zero-hallucination-coder
discipline to the implementer's prompt.
Invariants
- Do not do the work yourself. Doing it yourself looks faster; it inflates
context and lowers quality. Delegate. The one exception is a session budget past halfway (Phase 3).
- Launch in parallel what can run in parallel. One block, several agent calls.
- Every prompt must stand on its own. Copy the part of the plan that
matters into the prompt; a pointer to the file leaves the agent cold.
- File collisions are forbidden. Two agents cannot write the same file. If
the plan does not guarantee that, the plan is wrong; send it back.
- Context carries conclusions. A subagent reads the file and
returns the finding; raw content does not cross the boundary.
- The review is never skipped. Under time pressure, cut scope and keep the review.
- A `BLOCKER` is never passed over in silence. Either resolve it or tell the
user.
- Talk to the user in Turkish; everything produced is in English (
CLAUDE.md).
Scaling
| Project | Phases | |
|---|---|---|
| Small (1-3 files) | 0 → 2 (short plan) → 3 (1-2 packages) → 5 → 6 | |
| Medium | All of them, discovery kept light | |
| Large | All of them, discovery wide, implementation split into waves |
When in doubt, pick the smaller one. Adding a phase is easier than taking one back.