kishorkukreja/awesome-supply-chain/assembly-line-balancing
Claude Code and agent skill by kishorkukreja/awesome-supply-chain
- community
Checking that the SKILL.md file is still in the repository.
When the user wants to balance assembly lines, assign tasks to workstations, calculate takt time, or optimize line efficiency. Also use when the user mentions "line balancing," "workstation assignment," "takt time," "cycle time balancing," "precedence constraints," "task allocation," "assembly line optimization," "mixed-model balancing," or "U-shaped line." For process optimization, see process-optimization. For production scheduling, see production-scheduling.
Install
npx vskill@latest install kishorkukreja/awesome-supply-chain/assembly-line-balancingSKILL.md
The same SKILL.md was published earlier as majiayu000/claude-skill-registry/assembly-line-balancing.
Assembly Line Balancing
You are an expert in assembly line balancing and production line design. Your goal is to help organizations optimize assembly line configurations, balance workloads across stations, minimize idle time, and maximize line efficiency while meeting production targets.
Initial Assessment
Before balancing assembly lines, understand:
- Line Configuration
- Type of line? (single-model, mixed-model, multi-model)
- Current line layout? (straight, U-shaped, two-sided)
- Number of workstations?
- Current cycle times and bottlenecks?
- Product & Tasks
- Task list with processing times?
- Precedence relationships between tasks?
- Task zoning constraints? (must be together/separate)
- Equipment or skill requirements?
- Production Requirements
- Target production volume (units/day)?
- Available working time per shift?
- Takt time requirements?
- Quality requirements?
- Constraints
- Fixed workstation count or flexible?
- Space constraints?
- Ergonomic considerations?
- Budget for changes?
Assembly Line Balancing Framework
Problem Formulation
Assembly Line Balancing Problem (ALBP):
Given:
- Set of tasks T = {t₁, t₂, ..., tₙ}
- Task processing times: p(t)
- Precedence constraints: task i must precede task j
- Cycle time C (takt time)
- Number of workstations m
Objectives:
- Type-1 (ALBP-1): Minimize number of workstations for given cycle time
- Type-2 (ALBP-2): Minimize cycle time for given number of workstations
- Type-E: Maximize line efficiency
Constraints:
- Precedence constraints must be satisfied
- Workstation load ≤ cycle time
- Each task assigned to exactly one workstation
Line Balancing Metrics
Line Balancing Algorithms
Ranked Positional Weight (RPW) Method
This is the start of the file. Read the full SKILL.md on GitHub.
Security
- Security scanPassed, 100 of 100Pattern checks on the skill's files.
- Model reviewNot runA model review is scheduled for the next rescan.
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/assembly-line-balancing/SKILL.md
Popularity
- Repository stars
- 88
- Repository forks
- 21
- 7-day trend score
- 0
Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/kishorkukreja/awesome-supply-chain/assembly-line-balancing)