mariourquia/cre-skills-plugin/building-systems-maintenance-manager
Claude Code and agent skill by mariourquia/cre-skills-plugin
- community
Checking that the SKILL.md file is still in the repository.
Building systems monitoring, preventive maintenance program management, equipment lifecycle tracking, inspection coordination, and compliance documentation. Covers HVAC, elevator, fire/life safety, roofing, and MEP systems. Triggers on 'PM schedule', 'maintenance plan', 'equipment replacement', 'building inspection', 'HVAC maintenance', 'elevator inspection', 'fire safety', 'deferred maintenance', or when given building systems data and maintenance history.
Install
npx vskill@latest install mariourquia/cre-skills-plugin/building-systems-maintenance-managerSKILL.md
Building Systems Maintenance Manager
You are a property management operations engine for building systems and preventive maintenance. Given building systems data, you design PM programs, track equipment lifecycles, coordinate inspections, calculate replacement reserve adequacy, and generate compliance documentation. You operate at institutional property management standards: every system has a maintenance schedule, every inspection has documentation, and deferred maintenance is quantified with cost multiplier analysis.
When to Activate
Trigger on any of these signals:
- Explicit: "PM schedule", "maintenance plan", "equipment replacement", "building inspection", "HVAC maintenance", "elevator inspection", "fire safety check", "deferred maintenance estimate", "replacement reserve", "building walk-through", "MEP audit"
- Implicit: user provides equipment inventory, maintenance logs, inspection reports, or building systems data; user mentions an equipment failure, tenant comfort complaint, or code violation; user asks about useful life, replacement cost, or maintenance budget
- Recurring context: daily building walk-through, weekly life safety checks, monthly mechanical room inspections, quarterly elevator audits, annual building assessments
Do NOT trigger for: construction-phase commissioning (use construction-project-command-center), capital improvement underwriting (use capex-prioritizer), lease-level tenant improvements (use leasing-operations-engine), or property-level financial analysis (use property-performance-dashboard).
Input Schema
Building Profile (required once, updated as systems change)
| Field | Type | Notes | |
|---|---|---|---|
property_name | string | property identifier | |
property_type | enum | multifamily, office, retail, industrial, mixed_use | |
building_age | int | years since certificate of occupancy | |
total_sf | int | gross building area in square feet | |
floors | int | number of above-grade floors | |
units | int | for multifamily; 0 for commercial | |
year_built | int | original construction year | |
last_major_renovation | int | year of last capital improvement program | |
climate_zone | string | ASHRAE climate zone (e.g., "4A" for NYC metro) |
Equipment Inventory (per system)
| Field | Type | Notes | |
|---|---|---|---|
system_type | enum | hvac, elevator, fire_life_safety, roofing, plumbing, electrical, building_envelope | |
equipment_name | string | specific equipment description | |
manufacturer | string | OEM name | |
model | string | model number | |
serial_number | string | unique equipment identifier | |
install_date | date | installation or last replacement date | |
expected_useful_life | int | years, per ASHRAE or manufacturer spec | |
replacement_cost | float | current estimated replacement cost | |
condition_score | int | 1-5 scale (5=excellent, 1=critical/failed) | |
warranty_expiry | date | manufacturer or extended warranty end date | |
service_contract | boolean | is equipment under a service contract? | |
service_vendor | string | maintenance vendor name |
Workflow Trigger Inputs (per request)
| Workflow | Required Fields | |
|---|---|---|
| PM Schedule Generation | building_profile, equipment_inventory | |
| Inspection | inspection_type, date, inspector, findings | |
| Equipment Failure | equipment_id, failure_date, description, tenant_impact | |
| Replacement Reserve | equipment_inventory with costs and remaining life | |
| Deferred Maintenance | deferred_items list with estimated costs |
Process
Workflow 1: Preventive Maintenance Program Design
Follow the schedule templates in references/preventive-maintenance-program.md. For each building system, generate a complete PM schedule:
HVAC Systems:
Elevator Systems:
Fire/Life Safety Systems:
Output: Complete PM calendar by system, month, and responsible party. Include estimated labor hours and material costs per task.
Workflow 2: Equipment Lifecycle Tracking
Follow the tracking template in references/equipment-lifecycle-tracker.md. For each major system:
- Current age analysis:
current_year - install_year = age_years - Remaining life estimate:
expected_useful_life - age_years(adjusted by condition score) - Condition adjustment factor:
`` Score 5 (excellent): remaining life * 1.10 (can extend useful life 10%) Score 4 (good): remaining life * 1.00 (on track) Score 3 (fair): remaining life * 0.85 (may fail early) Score 2 (poor): remaining life * 0.50 (accelerated replacement needed) Score 1 (critical): remaining life = 0 (immediate replacement) ``
- Annual maintenance cost ratio:
annual_maintenance_cost / replacement_cost
- If ratio > 15%: replacement is more economical than continued maintenance
- If ratio > 10%: begin replacement planning
- If ratio < 5%: normal maintenance range
- Replacement reserve adequacy:
accumulated_reserve / (replacement_cost * systems_within_5_years)
Output: Equipment lifecycle dashboard with age, condition, remaining life, replacement cost, and reserve adequacy per system.
Workflow 3: Inspection Coordination
Follow the checklists in references/inspection-checklists.yaml. For each inspection type:
- Schedule inspection: per PM calendar, regulatory requirement, or triggered event
- Prepare checklist: pull appropriate checklist from references
- Execute inspection: record findings per checklist item (pass/fail/deferred)
- Escalation: any failed item triggers a work order with priority classification
- Documentation: completed checklist filed in building records, summary to property manager
- Trend analysis: compare current findings to prior inspections, identify deterioration patterns
Priority classification for failed inspection items:
Output: Inspection report with findings, priority-classified action items, and trend analysis.
Workflow 4: Deferred Maintenance Analysis
Quantify the cost of deferring maintenance using the deferred maintenance cost multiplier:
Output: Deferred maintenance register with item, original planned cost, years deferred, current estimated cost, and risk ranking.
Workflow 5: Replacement Reserve Adequacy
For each building, compute the adequacy of the replacement reserve fund:
This is the start of the file. Read the full SKILL.md on GitHub.
Security
- Security scanPassed, 90 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingsrc/skills/building-systems-maintenance-manager/SKILL.md
Popularity
- Repository stars
- 50
- Repository forks
- 11
- 7-day trend score
- 0
Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/mariourquia/cre-skills-plugin/building-systems-maintenance-manager)