mariourquia/cre-skills-plugin/capital-project-intake-and-prioritization

Claude Code and agent skill by mariourquia/cre-skills-plugin

Trust tier 3
  • community
Source check pending

Checking that the SKILL.md file is still in the repository.

Intake for capital project ideas from any source (PM, regional, AM, engineering, capex plan cycle). Scores each project against the overlay's priority rubric (life safety, deferred maintenance, renovation yield, risk mitigation, regulatory). Produces the prioritized backlog and flags gated decisions.

Install

npx vskill@latest install mariourquia/cre-skills-plugin/capital-project-intake-and-prioritization

SKILL.md

Capital Project Intake and Prioritization

Workflow purpose

Convert raw capex ideas and deferred-maintenance flags into a ranked, costed, approvable backlog. Ensures life-safety items never lose priority; routes scope deferrals for approval.

Trigger conditions

  • Explicit: "capex intake", "prioritize capex", "capex backlog", "year-end capex plan".
  • Implicit: workflows/monthly_property_operating_review surfaces deferred maintenance; workflows/work_order_triage finds a repeat pattern; insurance claim or inspection produces a scope.
  • Recurring: quarterly intake; annual plan build pre-budget.

Inputs (required / optional)

InputTypeRequiredNotes
Intake itemslistrequireddescription, source, unit, scope
Capex line-item librarycsvrequiredcost ranges
Labor and material referencescsvrequiredmarket-specific
Priority rubric overlayyamlrequiredlife safety weight etc.
Existing capex planrecordrequiredconflict detection
Renovation program trackerrecordoptionalfor yield context

Outputs

OutputTypeShape
Prioritized backlogkpi_reviewper-item score, cost, priority, life-safety flag
Estimate per itemestimateline items from library
Backlog memomemonarrative + recommended sequence
Approval request listlistfor items that require approval

Required context

Asset_class, segment, form_factor, lifecycle_stage, management_mode, market.

Process

  1. Intake normalization. Each item normalized to (description, unit, scope tier, driver, source).
  2. Life-safety flag. Any item tagged life-safety cannot be deprioritized without approval_request row 4.
  3. Estimate. Apply library; adjust for market via labor/material references.
  4. Score. Per overlay rubric: life safety, deferred maintenance, renovation yield, risk mitigation, regulatory compliance, residual value.
  5. Sequence. Produce prioritized backlog with scheduling constraints (seasonality, tenant impact).
  6. Gated items. Any life-safety deferral, any program change above threshold: open approval rows 4 / 8-11.
  7. Feed budget / reforecast. Output feeds workflows/budget_build and workflows/reforecast.
  8. Confidence banner. References cited.

Metrics used

capex_spend_vs_plan, renovation_yield_on_cost, repeat_work_order_rate, controllable_opex_per_unit.

Reference files used

  • reference/normalized/capex_line_items__{scope}.csv
  • reference/normalized/labor_rates__{market}.csv
  • reference/normalized/material_costs__{region}_residential.csv
  • reference/normalized/capex_priority_rubric__{org}.yaml
  • reference/normalized/approval_threshold_defaults.csv

Escalation points

  • Life-safety deferral: row 4.
  • Program change above threshold: rows 8-11.
  • Bid award associated with a project: row 9.

Required approvals

  • Life-safety scope deferral (row 4).
  • Capex program change above threshold.

Failure modes

  1. Silent life-safety deprioritization. Fix: row 4 gate automatic.
  2. Library not market-adjusted. Fix: labor/material references required.
  3. Estimate without scope tier. Fix: tier required.
  4. Prioritization without rubric. Fix: overlay rubric governs.

Edge cases

  • Insurance claim scope: treat as capex intake if above reserve; flag insurance coordination.
  • Regulatory deadline (e.g., code compliance): auto-priority boost.
  • Tenant-impact scope: scheduling constraint; include tenant communication via workflows/move_in_administration or notice.
  • Renovation in progress with change order backlog: coordinate via workflows/change_order_review.

Example invocations

  1. "Quarterly capex intake for Ashford Park; prioritize backlog."
  2. "What's the life-safety queue across the portfolio?"
  3. "Build the 2027 capex plan input for Willow Creek."

Example outputs

Output — Prioritized capex backlog (abridged, Ashford Park)

Backlog. Per-item score, cost range, priority, life-safety flag. Top items: roof repairs (life safety), parking lot resurfacing (deferred maintenance), unit renovation cohort (yield).

Sequence. Proposed order with seasonal constraints.

Approvals. Two items above overlay threshold: rows 8-11 opened for program decisions.

Confidence banner. capex_line_items__value_add@2026-03-31, status=starter. labor_rates__charlotte@2026-03-31, status=sample. capex_priority_rubric@2026-03-31, status=starter.

Security

  • Security scanPassed, 90 of 100Pattern checks on the skill's files.
  • Model reviewPassed

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
0

Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/mariourquia/cre-skills-plugin/capital-project-intake-and-prioritization/badge)](https://verified-skill.com/skills/mariourquia/cre-skills-plugin/capital-project-intake-and-prioritization)

Something wrong with this skill or its page? Tell us.