version: "1.0.0" name: rollout disable-model-invocation: true description: >- Design a safe rollout/migration strategy for a risky or irreversible change — expand-contract (parallel change), strangler fig, feature flags / dark launch / canary — as a staged plan where every stage is independently deployable, verifiable, and reversible. TRIGGER when: the user asks how to ship/deploy/migrate something safely — a schema or data migration, an API contract change, a library/system replacement, a risky behavior change, or mentions zero-downtime, feature flags, canary, backfill, or "how do we roll this out". DO NOT TRIGGER when: the change is a mechanical many-file edit with no production sequencing concern (use /sweep), the user wants a release-readiness check on work already done (use /preflight), or an ordinary reversible code change is being planned (use /prepare). allowed-tools: Read, Grep, Glob, Bash, Write, WebFetch, AskUserQuestion effort: high


Rollout Strategy

Change to roll out: $ARGUMENTS

Principle

A risky change is never shipped as one atomic act of courage. It is decomposed into a sequence of stages where each stage is deployable alone, verifiable alone, and reversible alone — so maximum learning happens before the one-way step, and the one-way step is as small as it can be made. This is core.md's door rule made operational: when a change looks irreversible, first try to change the door.

This skill designs the strategy and writes the staged plan. It does not deploy anything — execution of each stage goes through the normal pipeline (/prepare → /implement), and deploy/migrate commands are always suggested, never run.

Phase 0 — Load profile

  • [ ] Read .claude/PROJECT.md — note Architecture, Commands (test / run / deploy /

migrate, if present), Integrations (monitoring/error tracking — verification signals live there), and Plans location (the strategy doc lands there).

  • [ ] Read applicable .claude/rules/* (e.g. a postgres pack's migration rules).
  • [ ] If PROJECT.md is missing or still `TEMPLATE`, fall back to the root CLAUDE.md (always

in context) when it carries the architecture and deploy/migrate commands — note you're running without a kit profile. Only if neither has them, STOP and tell the user to run /bootstrap.

Phase 1 — Characterize the change

Before picking a pattern, establish the facts that select it (cite evidence — path:line, schema definitions, caller inventories; per core.md this gates one-way actions on observed evidence):

  • [ ] What mutates? Code only / schema / data rows / an external contract (API consumers,

message formats, webhooks) / infrastructure.

  • [ ] Find the one-way components. Rewritten or dropped data, messages sent, contracts

third parties depend on, names published. Everything else is two-way and needs no ceremony. If no one-way component exists and no old/new coexistence is needed, say so and route to /prepare — don't stage what doesn't need staging.

  • [ ] Who writes it, and who only reads it? Inventory both, counted separately (grep; for

external consumers, what the repo can prove — logs, API docs, contract tests): writers are the blocking set, readers may not have to move at all. The window exists exactly for them.

  • [ ] What signal proves each stage healthy? Tests, metrics, error rates, row counts —

from PROJECT.md → Integrations/Commands. A stage without a checkable signal cannot be in the plan — find the signal or add the instrumentation as its own prior stage. A canary, a flag, or an automated rollback is worth exactly as much as the signal under it: a comparison on pre-aggregated metrics with no per-build or per-flag dimension is a deployment ritual, not a guardrail — say so plainly. Name what the canary cannot see (thresholds that only bite past 50%, an unrepresentative slice, retry storms, corruption that reaches no metric), and check the monitor does not share fate with the path it watches.

  • [ ] Blast radius if the worst stage fails anyway — who/what is affected, for how long,

recovered how.

Phase 2 — Pick the pattern

SituationPattern
Schema/data shape changes under live readers+writers — including a rename of a value stored as data (status strings, event/message type names, discriminators, routing keys, graph edge types)Expand–contract (parallel change): expand (add new alongside old) → migrate writers → backfill → migrate readers → verify adoption is total → contract (drop old). Expansion is only what the running code cannot see — a new table, view, nullable column, alias, procedure, or data copied aside; anything today's version would touch belongs in a later stage.
Replacing a system/module/library wholesale — a MERGE verdict arriving from /decompose lands here tooStrangler fig: route through a seam, move one slice at a time behind it, old path stays alive until the new one has eaten everything
Behavior change with product/user riskFlag + progressive exposure: dark launch (new path runs hidden and unused) → canary (a small % of real users) → ramp → 100% → remove the flag. Parallel run — both paths called per request, one answer served, the two diffed — is a fourth, dearer option, not a synonym for either.
External contract change (API/message consumers you don't control)Versioned coexistence: publish v2 alongside v1, migrate consumers, deprecate with evidence of zero v1 traffic, then remove
One-shot data fix (backfill/correction)Rehearse–snapshot–apply: dry-run against a copy of real production data with row-count expectations stated first (predict-before-peek), snapshot/backup, apply, verify counts

Combine when the change spans rows (a strangler slice may itself need expand–contract). When the old side can stay, replicate back instead of migrating readers: redirect the writes, make the old fields read-only — enforced by grant, trigger or model guard, not by convention — and feed them from the new owner. State the lag, and still move the one reader that writes then reads in one request.

Reach for parallel run only when being silently wrong costs money, records or safety — it doubles compute and needs a diff harness. Compare latency and error rate as well as outputs, and budget for mismatches that turn out to be defects in the old path, which you will then have to prove.

Present the chosen pattern and why the situation's facts select it — one paragraph, plus the rejected runner-up with the fact that killed it.

Phase 3 — Write the staged plan

For every stage, all four fields — a stage missing one is not a stage:

### Stage N — <name>
**Change**: what ships (code/schema/config), and whether it's two-way or one-way.
**Verify**: the signal that proves it healthy, with the expected value stated
BEFORE looking (e.g. "v1 endpoint traffic: expect 0 over 7 days").
Event-based where the signal allows: name the events that count, the ones excluded
(probes, synthetics), and what makes one good — slow-but-200 is a failure.
**Bake**: how long / what volume the stage must survive before the next one.
**Rollback**: the concrete undo for THIS stage (command/flag/revert) — and its limits.

Sequencing rules (hard):

  • The contract/destructive stage comes last and is gated on observed evidence of zero

dependence on the old path (traffic counts, log queries — not on "should be fine").

  • Every stage before the one-way stage must be safe to stop at — the system runs

indefinitely in any intermediate state (that's what makes the sequence abortable). Safe to stop at is not safe to stay in: name the intermediate states that must never become the final one.

  • Old and new must not silently diverge during coexistence: name the mechanism that

keeps them consistent (dual-write, sync job, comparison shadow-read) and the check that would catch drift.

  • Behaviour diverges on purpose too. While a slice is mid-migration, a fix or a feature goes into

both paths or waits — patching only the new one turns the rollback into a regression for users who already have the fix. If that is impossible, the stage is too big: shrink it until it is days.

  • When code and its data both move, fix the order and write it down. Schema first when you fear

the latency or consistency cost — it shows early and rolls back cheaply; code first otherwise, and then splitting the data is a numbered stage of this plan with Verify/Bake/Rollback, not a follow-up.

  • Ship the code before migrating the data, never after — an old instance meeting a new row is the

failure this ordering prevents. Prefer trickle-then-batch to one big backfill: migrate each row as it is touched, sweep the remainder once the old version is gone, then ship the release that deletes the check. While both shapes are live the sync must cover insert, update and delete in both directions without looping, and only one trickle runs per table at a time.

  • A kill switch is not a rollback. State both when they differ (a flag flips fast; a

dropped column comes back slow — from the snapshot named in the plan).

Run a pre-mortem on the finished sequence (core.md): "the rollout failed — why?" The top two causes get a mitigation stage, a widened bake, or an added signal.

Phase 4 — Deliver

Write the strategy to the Plans location from PROJECT.md (<plans>/<YYYY-MM-DD>-<slug>-rollout.md) — this doc is the deliverable; confirm before writing per the Artifact-Continuity Contract (planning-artifacts.md). Report: pattern + why, the stage table, the one-way stage highlighted, and the pre-mortem outcome. Each stage then flows through /prepare → /implement as normal work.

Hard rules

  • Never execute the rollout. Deploy/migrate/flag commands are suggested for the user to

run — this skill produces a strategy, not a deployment.

  • No stage without a Verify signal and a Rollback. "Monitor closely" is not a signal;

"revert if needed" is not a rollback.

  • The destructive step is gated on observed zero-dependence evidence, never on

schedule ("after two weeks") alone — time is a proxy, traffic is the fact. An in-process caller has no traffic metric: the deprecation warning is the counter, and it counts only if it names the caller's location rather than the old path's own, and if its category is not muted by default.

  • If nothing is one-way, say so and stand down to /prepare — ceremony where wrong is

cheap is waste (core.md).

See also

  • /sweep — the mechanical many-file edit inside a stage (inventory → batches → re-scan).
  • /preflight — release-readiness gate before each stage ships.
  • /incident — if a stage goes wrong in production, mitigate first.
  • rules/_generic/core.md — doors, pre-mortem, predict-before-peek.