currentLLM-judged scan90/100version: "1.0.0" name: updating-dependencies description: Upgrade packages without breaking the build or importing something nobody vetted — read the changelog, move in separate steps, and prove it still works. Use when updating a dependency, responding to a security advisory, or adding a new package.
Updating dependencies
Every upgrade is somebody else's code entering the project. It is ordinary work, but it is the kind where a green build is not the same as a safe change.
One at a time, and separately
- A security patch is its own change. A routine bump is its own change. A major version is its own
change, and usually its own task.
- Never mix a dependency update into a feature. When something breaks a week later, the first
question is "what changed", and a diff that did two things cannot answer it.
- Update the lockfile in the same commit as the manifest, always. A manifest and lockfile that
disagree is a build that works for you and nobody else.
Read before you upgrade
Look at the changelog or release notes for every version you are crossing, not just the one you are landing on.
- Breaking changes, deprecations, and anything about defaults changing.
- For a major version, find the migration guide. If there is not one, that is information about the
package.
- Check the package is still maintained: when was the last release, are issues answered.
If the update needs code changes, make them in the same change and say so in the message.
Prove it still works
The test suite passing is necessary and not sufficient.
- Full suite, typecheck, lint — the repo's own commands.
- Run the thing the dependency is actually used for. Tests often mock exactly the part that broke.
- Check the build output where it matters: bundle size for a client dependency, startup time for a
server one.
- Read the lockfile diff. One package bumped should not quietly bring in thirty transitive
changes; if it did, say so.
Security advisories
Do the smallest upgrade that fixes it, and do it first — before the routine bumps that were queued behind it.
If the fix requires a major version and a migration, that is a decision about time, so bring it to the owner with ask_user: what the advisory is, whether the project is actually exposed to it (often it is not — the vulnerable path may be unused), and what the two options cost.
Adding something new
Before adding a package, check the project does not already have one that does this, and that the standard library does not. Then look at what you are importing: maintenance, size, transitive dependencies, licence, and whether the name is a near-miss of a more popular package.
Adding a dependency is a long-term commitment on someone else's behalf. For anything substantial, ask rather than decide.
If it goes wrong
Revert the upgrade rather than patching around it under time pressure. Then say what broke, with the error, so the next attempt starts informed.