Kanban Phase 2 — Planning → Execution Contract (Human + Agent)
Argument: <feature_name>.
Phase 2 turns the confirmed requirement into a binding execution contract that the human approves. Everything written here is law for the rest of the pipeline — no silent scope creep afterwards.
1. Verify stage
kf status --change {feature_name} # must show stage = planning
If approval is already valid, keep the contract unchanged and go to the start/backlog decision in section 4. If the approval is changed or pending, finish the applicable contract and obtain fresh human approval.
Read work item kind from kf status --change {feature_name} --json. For kind: bug, use the confirmed bug report as the contract: reproduction, expected fix, scope, regression strategy and docs impact. Skip section 2; present this concise contract, run approval in section 3 and ask start/backlog in section 4. Do not create feature planning artifacts for a bug. If the request introduces behavior beyond correcting the defect, explain the scope change and follow the user's decision before creating a related feature.
2. Write the four plan artifacts (in order)
Read the confirmed Test Strategy from phase-1-spec-requirement.md (Level in a feature spec, Test Level in a bug report, plus UI Tests, Tools, Coverage Target) — it was agreed with the human in Phase 1. Everything below must honour it.
Print each template and fill the file at its path:
kf instruct implementation-plan --change {feature_name}kf instruct use-case-specification --change {feature_name}kf instruct use-case-diagram --change {feature_name}kf instruct test-cases --change {feature_name}kf instruct use-case --change {feature_name} --id UC-001
implementation-plan
- Scope: now / supporting / future / not-in-scope
TASK-###breakdown, complexity, impact analysis (backend / frontend / DB / API / infra / security / performance / regression / deps)- Testing strategy incl. coverage target from the spec's Test Strategy (default >= 80%) and Definition of Done
- When Test Level is
full: name the UI/E2E framework you will use (Playwright, Cypress and so on) and say which suite covers the critical flows and which covers everything.
use-case-specification
- Use
phase-2-use-case-specification.mdonly as an index and coverage summary. - Write one file per use case under
use-cases/UC-###.md, usingkf instruct use-case --id UC-###. - Each file contains one
UC-###: goal, actors, preconditions, trigger, main / alternative / exception flows, postconditions, business rules, data and acceptance criteria. - The file name and declared ID must match exactly. Do not put multiple UC narratives in one file.
use-case-diagram
- Mermaid
graph TD/flowchart: actors → use cases (one box per UC-###)
test-cases
- Generate test cases from the spec's Test Level (unit | unit+integration | full):
unit→Unitcases only, one per acceptance criterion and per edge case, each tied to an FR and a UC.unit+integration→ addIntegrationcases wherever the change meets another system, the database or an API.full→ add `UI / E2E` cases for the user-facing flows: what is clicked, what is typed, what appears on screen, following theUI Testsscope (critical or all). Add the matching## TC-###sections from the detailed template, with references that match that scope.- Keep the plan table-driven: fill overall totals, per-type counts, use-case coverage matrix and requirement coverage matrix before the detailed
## TC-###tables. - Define each test in a
## TC-###section referencingFR-###(spec) andUC-###(the matching individual use-case file).kf validateblocks missing or unknown references before approval. - If the user wants to change the test level during Phase 2, which is rare: update the Test Strategy in
phase-1-spec-requirement.mdbefore generating the cases, and say so when you present the contract for approval.
3. Human approval gate
kf validate --change {feature_name}
Before approval, approval_required is expected; approval_changed is expected when revising an old contract. Fix all other errors and assess warnings before presenting the contract. kf approve validates the artifacts without requiring an existing approval. Present a tight summary to the user:
- what the feature does (2-3 lines)
- implementation plan headlines (tasks, approach, risks)
- test strategy + coverage target (as agreed in the spec's Test Strategy: unit / unit+integration / full + UI scope)
- Definition of Done
Ask once: "approve?" On approval:
kf approve {feature_name}
kf approve fingerprints the requirement, four planning artifacts and all individual UC files for a feature; for a bug it fingerprints only the bug report. kf stage requires the approved contents to remain unchanged. Progress and test outcomes belong in tasks.md and the testing report; do not rewrite the approved contract during execution.
4. Start/backlog decision gate
Approval means the contract is valid; it does not mean implementation must start immediately. Ask the user once:
"The plan is ready. Start implementation now, or put it in the backlog?"
- Start now →
kf stage {feature_name} implementation - Defer →
kf stage {feature_name} backlog
Do not choose on the user's behalf. A deferred item keeps its approved contract in backlog and can resume to implementation later after the user chooses to start.
Done
Approval and the start/defer decision are recorded. Hand off:
If the user chose start, load kanban-implement and move the feature to implementation. If the user chose defer, leave it in backlog and resume only after an explicit start decision.