Plan Release Cycle

Plan structured release cycle: pick strategy (calendar or feature), set milestones, freeze criteria, RCs, go/no-go, rollback. Output: RELEASE-PLAN.md artifact guiding team dev → release.

Use When

  • Major/minor release planning starts
  • Ad-hoc → structured release cadence
  • Multi-team or multi-component release coord
  • Quality gates + criteria for regulated project
  • First public release (v1.0.0)

In

  • Required: Target version (e.g., v2.0.0)
  • Required: Release date or window
  • Required: Planned features/scope (backlog, roadmap, desc)
  • Optional: Team size + availability
  • Optional: Strategy pref (calendar or feature)
  • Optional: Regulatory/compliance reqs
  • Optional: Past release velocity or cycle data

Do

Step 1: Determine Strategy

Two primary strategies:

Calendar-based (time-boxed):

  • Fixed schedule (e.g., 4 wks, quarterly)
  • Not-ready features → next release
  • Predictable for users + downstream
  • Best for: libraries, frameworks, tools w/ external consumers

Feature-based (scope-driven):

  • Release when defined scope done
  • Date adjusts to scope
  • Risk: scope creep, indefinite delays
  • Best for: internal tools, first releases, major rewrites

Most projects → hybrid: target date + defined scope, 1-2 week buffer. Scope not met by buffer → defer remaining.

Doc strategy choice w/ rationale.

→ Strategy doc'd w/ rationale matching project context.

If err: team can't agree → default calendar-based w/ feature-priority list. Time-box forces prioritization.

Step 2: Define Milestones

Phases w/ target dates:

markdown
## Release Plan: v2.0.0
### Timeline
| Phase | Start | End | Duration | Description |
|---|---|---|---|---|
| Development | 2026-02-17 | 2026-03-14 | 4 weeks | Active feature development |
| Feature Freeze | 2026-03-15 | 2026-03-15 | 1 day | No new features merged after this date |
| Stabilization | 2026-03-15 | 2026-03-21 | 1 week | Bug fixes, documentation, testing only |
| RC1 | 2026-03-22 | 2026-03-22 | 1 day | First release candidate tagged |
| RC Testing | 2026-03-22 | 2026-03-28 | 1 week | Community/team testing of RC |
| RC2 (if needed) | 2026-03-29 | 2026-03-29 | 1 day | Second RC if critical issues found |
| Go/No-Go | 2026-03-31 | 2026-03-31 | 1 day | Final decision meeting |
| Release | 2026-04-01 | 2026-04-01 | 1 day | Tag, publish, announce |

Typical durations:

  • Development: 50-70% of cycle
  • Stabilization: 15-25% of cycle
  • RC testing: 10-20% of cycle

→ Milestone table: dates, durations, descriptions per phase.

If err: timeline too compressed (stabilization < 1 wk) → extend release date or reduce scope. Never skip stabilization.

Step 3: Set Feature Freeze Criteria

Define "feature freeze" for this release:

markdown
### Feature Freeze Criteria
After feature freeze (2026-03-15):
-**Allowed**: Bug fixes, test additions, documentation updates, dependency security patches
-**Not allowed**: New features, API changes, refactoring, dependency upgrades (non-security)
-**Exception process**: Feature freeze exceptions require written justification and approval from [release owner]
### Feature Priority List
| Priority | Feature | Status | Owner | Notes |
|---|---|---|---|---|
| P0 (must) | New export format | In progress | [Name] | Blocks release |
| P0 (must) | Security audit fixes | Not started | [Name] | Compliance requirement |
| P1 (should) | Performance optimization | In progress | [Name] | Defer if not ready |
| P2 (nice) | Dark mode support | Not started | [Name] | Defer to v2.1.0 if needed |

P0 → blocks release. P1 → in if ready. P2 → deferred w/o delay.

→ Freeze rules doc'd w/ exception process + prioritized list.

If err: P0 at risk of missing freeze → escalate immediately. Options: extend dev phase, split feature smaller, defer to point release (v2.0.1).

Step 4: Plan RC Process

How RCs are produced + tested:

`markdown
### Release Candidate Process
1. **RC1 Tag**: Tag from the stabilization branch after all P0 features merged and CI green
```bash
git tag -a v2.0.0-rc.1 -m "Release candidate 1 for v2.0.0"
```
2. **RC Distribution**: Publish RC to staging/testing channel
- R: `install.packages("pkg", repos = "https://staging.r-universe.dev/user")`
- Node.js: `npm install pkg@next`
- Internal: Deploy to staging environment
3. **RC Testing Period**: 5-7 business days
- Run full test suite including integration tests
- Verify all P0 features work as documented
- Test upgrade path from previous version
- Check for regressions in existing functionality
4. **RC Evaluation**:
- **No critical/high bugs**: Proceed to release
- **Critical bugs found**: Fix, tag RC2, restart testing period
- **More than 2 RCs needed**: Revisit scope and timeline
5. **RC2+ Tags**: Only if critical issues found in previous RC
```bash
git tag -a v2.0.0-rc.2 -m "Release candidate 2 for v2.0.0"
```

→ RC process doc'd: tagging convention, distribution, testing checklist, escalation.

If err: RC skipped (release pressure) → doc the risk. Untested releases → higher rollback prob.

Step 5: Define Go/No-Go Checklist

Criteria before release approval:

markdown
### Go/No-Go Checklist
#### Must Pass (release blocked if any fail)
-[ ] All CI checks passing on release branch
-[ ] Zero critical bugs open against this version
-[ ] Zero high-severity security vulnerabilities
-[ ] All P0 features verified and documented
-[ ] Changelog complete and reviewed
-[ ] Upgrade path tested from previous version (v1.x -> v2.0.0)
-[ ] License and attribution files up to date
#### Should Pass (release proceeds with documented risk)
-[ ] Zero high bugs open (non-critical)
-[ ] All P1 features included
-[ ] Performance benchmarks within acceptable range
-[ ] Documentation reviewed and spell-checked
-[ ] External dependencies at latest stable versions
#### Decision
-**Go**: All "Must Pass" items checked, majority of "Should Pass" items checked
-**No-Go**: Any "Must Pass" item unchecked
-**Conditional Go**: All "Must Pass" checked, significant "Should Pass" items unchecked — document accepted risks

→ Go/no-go checklist w/ clear pass/fail + decision rules.

If err: meeting → no-go → ID blockers, assign owners, new target (typically 1-2 wks later), update plan.

Step 6: Document Rollback Plan

Roll back if release causes critical prod issues:

markdown
### Rollback Plan
#### Rollback Triggers
-Critical bug affecting >10% of users
-Data corruption or loss
-Security vulnerability introduced by the release
-Breaking change not documented in changelog
#### Rollback Procedure
1.**Revert package registry**: Unpublish or yank the release
-R/CRAN: Contact CRAN maintainers (cannot self-unpublish)
-npm: `npm unpublish pkg@2.0.0` (within 72 hours)
-GitHub: Mark release as pre-release, publish point fix
2.**Communicate**: Notify users via GitHub issue, mailing list, or social channels
-Template: "v2.0.0 has been rolled back due to [issue]. Please use v1.x.y until a fix is released."
3.**Fix forward**: Prefer a v2.0.1 patch release over a full rollback when possible
4.**Post-mortem**: Conduct a post-mortem within 48 hours of rollback to identify process gaps
#### Point Release Policy
-v2.0.1 for critical bug fixes within 1 week of release
-v2.0.2 for additional fixes within 2 weeks
-Patch releases do not require full RC cycle but must pass CI and critical test suite

Write complete plan → RELEASE-PLAN.md or RELEASE-PLAN-v2.0.0.md.

→ Rollback plan doc'd: triggers, procedure, comm template, point release policy. Complete RELEASE-PLAN.md written.

If err: rollback not feasible (DB migration applied) → doc forward-fix instead. Every release needs recovery path.

Check

  • [ ] Strategy (calendar/feature/hybrid) doc'd w/ rationale
  • [ ] Milestone table all phases: dev, freeze, stabilization, RC, release
  • [ ] Freeze criteria w/ allowed/disallowed change types
  • [ ] Feature priority list (P0 / P1 / P2)
  • [ ] RC process doc'd: tagging, distribution, testing, escalation
  • [ ] Go/no-go has "must pass" + "should pass" sections
  • [ ] Rollback plan: triggers, procedure, comm template
  • [ ] RELEASE-PLAN.md created + saved
  • [ ] Timeline realistic (stabilization ≥ 15% of cycle)

Traps

  • No stabilization phase: Direct dev → release. Even 3-day stabilization catches issues active dev masks.
  • Scope creep after freeze: "Just one more feature" → resets testing, regression risk.
  • Ignore P0 risks: Not escalating early. Earlier scope adjust = less timeline disruption.
  • Skip RC for "small" releases: Even minor → benefit from 1 RC. Day of RC < post-release hotfix.
  • No rollback plan: Assume success. Every plan answers "what if this goes wrong?" before publish.
  • Calendar pressure > quality: Release on promised date despite failing go/no-go. Delayed release = minor inconvenience; broken release = trust violation.

→

  • apply-semantic-versioning — determine version for planned release
  • manage-changelog — maintain changelog feeding release notes
  • plan-sprint — sprint planning within dev phase
  • draft-project-charter — may define release roadmap + success criteria
  • generate-status-report — track progress vs milestones

Security

  • Security scanPassed, 95 of 100Pattern checks on the skill's files.
  • Model reviewPassed

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

Repository stars
15
Repository forks
1
Repository npm downloads, 7 days
22
7-day trend score
25

Stars and forks are for the whole GitHub repository, not this skill alone. Downloads are for the repository's npm package. Refreshed 15 May 2026, 5 months ago.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/pjt222/agent-almanac/plan-release-cycle/badge)](https://verified-skill.com/skills/pjt222/agent-almanac/plan-release-cycle)

Something wrong with this skill or its page? Tell us.