projectbluefin/common/release-promotion

Claude Code and agent skill by projectbluefin/common

Trust tier 3
  • community
  • ext:[{"type":"hook","description":"Pre/post lifecycle hooks"}]
Source check pending

Checking that the SKILL.md file is still in the repository.

Promotion criteria, monthly release cadence, hotfix procedure, and artifact verification for projectbluefin/common. Use when cutting a release, understanding the promotion pipeline, or verifying release artifacts.

Install

npx vskill@latest install projectbluefin/common/release-promotion

Semi-extensibleMentions customization, but needs skill-specific knowledge. Read the extensible skills standard

SKILL.md

Release and promotion — common

Load this when cutting a release, evaluating whether a monthly tag is safe to create, doing a hotfix, or verifying signed artifacts.

When to Use

  • Cutting or evaluating a monthly release tag
  • Doing a hotfix outside the monthly window
  • Verifying cosign signatures, SBOM, or SLSA attestations on a published image
  • Understanding how common changes propagate to downstream :testing builds
  • Debugging the testing→main squash promotion pipeline

When NOT to Use

  • CI workflow editing (SHA pinning, pre-commit, Renovate) → `ci-tooling.md`
  • Debugging silent CI failures or startup_failure → `ci-pitfalls.md`
  • PR review or issue triage workflows

Promotion criteria

A common release is safe when all of the following are true:

CriterionHow to verify
Post-merge E2E is greenCheck .github/workflows/e2e.yml run on latest main commit
No PRs on hold targeting maingh pr list --repo projectbluefin/common --search "label:hold" --base main
No open P0 issues~/src/hive-status — zero 🔴 blockers
Promotion-candidate E2E passed this weekCheck .github/workflows/promotion-candidate-e2e.yml (runs Tuesdays) — no open blocker issue from it

If any criterion fails, do not tag a release. File or escalate the blocker issue and wait.

Planned gate (common#513): The monthly release.yml will be updated to run the promotion-candidate E2E as a required prerequisite job before creating the GitHub Release. Until that ships, the check above is manual.

Monthly release cadence

  • Schedule: 1st of every month at 00:00 UTC (release.yml cron)
  • Tag format: v<YEAR>.<MONTH> — e.g., v2026.06
  • What it creates: A GitHub Release with a changelog since the previous tag, pointing at the current main HEAD
  • What it does NOT do: Promote or retag the OCI image — :latest is always the most recent merge to main

Emergency hotfix release

When a critical fix needs a versioned tag outside the monthly window:

  1. Merge the fix to main via normal PR process
  2. Verify all promotion criteria above are met
  3. Run release.yml manually via workflow_dispatch — it will tag the current main with the current month's tag (or create a patch tag manually with gh release create)
  4. Notify downstream image repos if the fix affects their builds

Common Rationalizations

RationalizationReality
"E2E is green, so we can tag."Check all four criteria — E2E alone is not sufficient.
"The promotion PR will auto-merge once CI passes."Merge queue enqueue can fail due to required status checks not completing; verify after squash branch rebuild.
"The squash conflict is from someone else's PR."You can still fix the squash branch — see troubleshooting.
"The ci(promote): PR title is what triggers execute-release."execute-release.yml matches the commit message that lands on the target branch (chore: promote ...), not the PR title.

Red Flags

  • Promotion PR has release/blocked with no E2E evidence → check post-testing-e2e.yml branches: filter
  • promote-testing-to-main.yml fails with UD conflicts → file deletions on testing haven't reached main
  • Publish workflow stuck in_progress > 30 min → zombie run holding concurrency queue
  • execute-release.yml not triggering after promotion PR merges → check commit subject match

Verification

  • [ ] Confirm all four promotion criteria are met before tagging
  • [ ] For artifact verification: run gh attestation verify (keyless, post-2026-06-11), not just cosign verify
  • [ ] After a hotfix: notify downstream repos if the fix affects their builds
  • [ ] After a squash branch rebuild: wait for PR Validation — testsuite to complete before enqueuing

References

FileDescription
references/supply-chain.mdSupply chain current state (signing, SBOM, SLSA, CVE), required permissions, and artifact verification commands.
references/downstream-propagation.mdHow common updates reach bluefin, bluefin-lts, and dakota :testing builds (Renovate + BST).
references/pr-based-release.mdPR-based squash promotion model, schedule, commit title rules, repo variants, E2E gate model, and reusable workflow patterns.
references/troubleshooting.mdTroubleshooting the testing→main squash promotion: gate stuck, UD conflicts, merge queue blocked, branch divergence, zombie publish runs, actions branch policy.

Security

  • Security scanPassed, 90 of 100Pattern checks on the skill's files.
  • Model reviewPassed

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
0

Not refreshed yet.

Extension points

  • hookPre/post lifecycle hooks

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/projectbluefin/common/release-promotion/badge)](https://verified-skill.com/skills/projectbluefin/common/release-promotion)

Something wrong with this skill or its page? Tell us.