Executing plans
The plan already did the thinking. Execute it exactly, prove each step with a test you watched fail and then pass, and leave a record that survives context compaction.
Required: read test-driven-development before Task 1. It governs every step.
Setup
- Work on an isolated branch or worktree (git-workflow). Never implement on
main/masterwithout explicit consent. - Read the plan and its spec once. The spec is the authority; conflicts inside the plan resolve against it. Set the plan's
Status: in progress.
Drift check: run git diff --stat <Base>..HEAD -- <the plan's files>. If they changed since the plan was written, record it in the ledger and re-check the affected tasks; if a task no longer fits the code, go back to writing-plans.
- Ledger: create
docs/plans/<plan-name>.progress.md(or the project's equivalent), first line# Ledger — plan: <path>. If it already exists and names this plan, tasks marked complete are done. Resume at the first incomplete one, and trust the ledger andgit logover your memory. - Pre-flight: for every task that consumes another task's output, compare the Interfaces blocks. Record conflicts and your rulings in the ledger.
- Run the verification commands once to record the baseline. Existing failures are noted in the ledger, not silently inherited.
Per task
- Re-read the task text (not your memory of it). Note
BASE=$(git rev-parse HEAD). - Work the steps in order. For every command, compare the output with the plan's
Expected:
- Matches: next step.
- The code is wrong: use systematic-debugging. Never patch the symptom to match.
- The plan is wrong: choose the smallest change that satisfies the spec, log
Ruling: <what> — <why> — <cost if wrong>, and continue.
- Commit as the plan says.
- Completion contract, with evidence from this session:
- every named test exists and ran;
- the full suite is green;
- every
Expectedwas compared; - every deviation has a ruling.
Then log Task N: complete (BASE..HEAD, <command> → <result>) and tick the checkbox.
Rulings, not stalls. Don't pause between tasks to ask "should I continue?". Stop and ask only for:
- an irreversible or destructive action;
- a security-sensitive action;
- a side effect outside this worktree (push to a shared branch, publish, deploy, a migration on a shared database, a real payment);
- a plan so broken that every way forward is a guess.
Keep long command output out of context: redirect it to a file and read the tail.
Subagent per task (when the user chose it)
For each task:
- Dispatch the kit's
implementeragent with only what it needs: the task text verbatim, the Interfaces it consumes, the global constraints, the verification commands, and the instruction "follow TDD; report DONE, DONE_WITH_CONCERNS, NEEDS_CONTEXT or BLOCKED with the commands you ran". - Don't trust the report. Check
git diff BASE..HEADand run the tests yourself. - Dispatch a fresh
revieweragent using../requesting-code-review/reviewer-prompt.mdonBASE..HEAD. - Have the implementer fix Critical and Important findings (resume the same agent, so it keeps its context), then re-review. After 3 rounds without convergence, stop and ask the user.
Run implementers sequentially, one at a time on the same tree. For independent read-only work, see dispatching-parallel-agents.
Finish
- Run the whole-branch review with requesting-code-review (range
$(git merge-base <base> HEAD)..HEAD). Include the plan's Review focus and a pointer to the ledger's rulings. - Fix Critical and Important findings in one pass, each with RED→GREEN plus a green full suite. Log Minor findings.
- Docs: do the plan's Post-implementation block, plus anything else the diff made stale (writing-documentation), in this branch.
- Set the plan's
Status: doneand the spec'sStatus: implemented (YYYY-MM-DD)with a link to its topic chapter, and tick the piece in the roadmap if there is one. - Apply verification-before-completion, then use the finishing section of git-workflow.