<< All versions
Skill v1.0.0
currentAutomated scan100/100togorashi45/skills-directory/contractor-scorecard
──Details
PublishedNovember 17, 2026 at 08:39 PM
Content Hashsha256:a974f807703d52e0...
Git SHA48fa51373516
──Files
Files (1 file, 5.8 KB)
SKILL.md5.8 KBactive
SKILL.md · 151 lines · 5.8 KB
metadata: version: "1.0.0"
Skill: Contractor Scorecard (#57)
Description
Evaluates contractor performance across a completed project using a structured scoring system. Rates quality, communication, timeliness, and budget adherence. Generates a hire/no-hire recommendation and a permanent record for future reference.
Inputs
- Contractor Name (required)
- Trade (required): GC / Plumber / Electrician / HVAC / Framer / Drywaller / Painter / Flooring / etc.
- Project Address (required)
- Project Dates (required): Start and end dates
- Contract Amount (required): Original contract price
- Final Amount Paid (required): What was actually paid including change orders
- Performance Notes (optional): Raw observations — can be detailed or rough notes
- Punch List Count (optional): Number of punch list items attributable to this contractor
- Would You Rehire? (optional): Owner's gut-check before scoring
Outputs
- Numeric score (0–100) across 4 dimensions
- Overall grade: A / B / C / D / F
- Hire/No-Hire recommendation with reasoning
- Contractor profile card (save to contractor database)
- Red flags summary (if any)
Scoring Dimensions
1. Quality of Work (30 points)
| Score | Criteria | |
|---|---|---|
| 28–30 | Zero punch list items, work exceeds expectation, no callbacks | |
| 22–27 | 1–3 minor punch list items, all fixed without issue | |
| 15–21 | Multiple punch list items (4–8), some required callbacks | |
| 8–14 | Significant rework required, code violations, or quality failures | |
| 0–7 | Major rework, failed inspection, or work was unacceptable |
2. Communication & Professionalism (25 points)
| Score | Criteria | |
|---|---|---|
| 23–25 | Responsive within hours, proactively updated, no surprises | |
| 18–22 | Usually responsive, communicated major issues in time | |
| 12–17 | Had to chase them, some surprises, communication gaps | |
| 6–11 | Hard to reach, left job without notice, poor follow-through | |
| 0–5 | Ghosted, lied, or created serious communication failures |
3. Schedule / Timeliness (25 points)
| Score | Criteria | |
|---|---|---|
| 23–25 | On time or early, delays they caused were minimal (<3 days) | |
| 18–22 | 3–7 day delay attributable to contractor | |
| 12–17 | 1–2 week delay attributable to contractor | |
| 6–11 | 2–4 week delay caused by contractor | |
| 0–5 | Abandoned project, caused major delays (4+ weeks), left mid-job |
4. Budget Adherence (20 points)
| Score | Criteria | |
|---|---|---|
| 18–20 | Final cost at or under contract amount | |
| 14–17 | 1–5% over contract (minor change orders, legitimate) | |
| 9–13 | 6–15% over contract (some questionable change orders) | |
| 4–8 | 16–30% over contract (scope creep, padding change orders) | |
| 0–3 | 30%+ over contract or contract disputes / incomplete work |
Overall Grade Scale
| Score | Grade | Hire Recommendation | |
|---|---|---|---|
| 90–100 | A+ | Strong hire — priority contractor, call first | |
| 80–89 | A | Hire — reliable, keep on shortlist | |
| 70–79 | B | Hire with oversight — good but watch | |
| 60–69 | C | Maybe — verify specific concerns before rehiring | |
| 50–59 | D | Do not hire — documented failures | |
| 0–49 | F | Blacklist — warn other investors |
Steps
Step 1: Collect Inputs
Gather all input data. If performance notes are rough/informal, extract key observations.
Step 2: Score Each Dimension
Apply the rubric above based on actual performance. Be honest — this record exists to protect future projects.
Step 3: Flag Red Flags
Automatically flag as Red Flags:
- Failed any inspection (code violation on their trade)
- Any instance of lying or misrepresentation
- Abandoned job mid-project
- Filed or threatened a lien
- Budget overrun > 20% without legitimate change order documentation
- Any criminal or legal issue during project
Step 4: Calculate Score and Grade
Sum all 4 dimensions. Apply grade and hire/no-hire recommendation.
Step 5: Output Contractor Profile Card
CONTRACTOR SCORECARD=====================Name: [name]Trade: [trade]Company: [company if applicable]Phone: [phone]Project: [address]Dates: [start] – [end]Contract: $[amount] | Final Paid: $[amount] | Variance: [+/-]%SCORES:Quality of Work: [X]/30Communication: [X]/25Timeliness: [X]/25Budget Adherence: [X]/20-----------------------------TOTAL: [X]/100GRADE: [A/B/C/D/F]HIRE AGAIN: [YES / NO / CONDITIONAL]SUMMARY:[2–3 sentence plain-language summary of performance]RED FLAGS:[None / list of flagged items]NOTES:[Any additional context for future reference]
Example Prompt
Contractor: Carlos Mendoza (painter)Project: 4521 Maple St, Dallas TXDates: 3/15/2026 – 3/22/2026Contract: $4,200 | Final paid: $4,200Notes: Good work overall. Had 3 punch list items — two paint drips on cabinets and overspray on LVP. He came back and fixed all three within 24 hours. Was responsive on texts, kept to schedule, came in on budget.Punch list items attributed: 3 (all fixed)Would rehire: yes
Expected output: Quality 25/30, Communication 23/25, Timeliness 24/25, Budget 20/20 = 92/100, Grade A, Strong hire.
Scripts
scripts/contractor-db-schema.md— Notion/spreadsheet schema for storing contractor recordsscripts/score-aggregator.md— multi-project averaging logic for repeat contractors
Notes
- Score every contractor on every project. Memory fades. Records don't.
- Share scores with other trusted investors when asked — good contractors are a community resource.
- For Matt Hoover's flips: add to his contractor database after each project, flag his top-tier subs.
- Conditional hire means: "would use again but only for [specific scope]" or "only with extra oversight"