v1bh0r/precise-ledger-pro/nw-production-readiness

Claude Code and agent skill by v1bh0r/precise-ledger-pro

Trust tier 3
  • community
Source check pending

Checking that the SKILL.md file is still in the repository.

Monitoring, observability, operational procedures, CI/CD lessons learned, and quality gate definitions. Load when assessing production readiness or validating operational excellence.

Install

npx vskill@latest install v1bh0r/precise-ledger-pro/nw-production-readiness

SKILL.md

The same SKILL.md was published earlier as nwave-ai/nwave/nw-production-readiness.

Production Readiness

Monitoring and Observability

Application Monitoring
  • Performance: response time | throughput | latency percentiles (P50, P95, P99)
  • Resources: CPU | memory | database connections | cache hit rates
  • Errors: exception tracking | error rate trends | integration failure detection
  • Business: KPI tracking | conversion funnels | feature usage | revenue impact
Infrastructure Monitoring

Server/container health and resource utilization | Network performance and connectivity | Storage capacity and I/O performance | Security event detection.

Alerting Tiers
TierConditionResponse
PageService down, data loss risk, security breachImmediate response
UrgentError rate >2x baseline, latency SLA breachResponse within 15 min
WarningCapacity >80%, error rate trending upResponse within 1 hour
InfoDeployment complete, metric threshold crossedReview next business day

Operational Procedures

Incident Response
  1. Detect: automated alerting identifies issue
  2. Triage: classify severity, assign responder
  3. Communicate: notify stakeholders per severity level
  4. Resolve: apply fix or rollback
  5. Review: post-incident review within 48 hours
  6. Improve: update runbooks and monitoring based on findings
Maintenance Procedures

Regular update and patching schedule | Backup verification (test restores quarterly) | Security vulnerability scanning (automated, weekly) | Performance baseline recalibration (after major changes).

Knowledge Transfer

Operational runbooks for common procedures | Architecture documentation with system diagrams | Deployment procedures and configuration management | Troubleshooting guides for known failure modes.

Quality Gates for Production Readiness

Before declaring production-ready, all must pass:

  • [ ] All acceptance tests passing
  • [ ] Unit coverage meets project standard (default: >= 80%)
  • [ ] Integration tests validated
  • [ ] Performance validated under realistic load
  • [ ] Security scan completed (0 critical, 0 high)
  • [ ] Monitoring and alerting configured
  • [ ] Logging structured and searchable
  • [ ] Rollback procedure documented and tested
  • [ ] Runbook created for operational procedures
  • [ ] On-call team trained on new feature

For CI/CD architecture lessons and measurement coupling pitfalls, see cicd-and-deployment skill.

Security

  • Security scanPassed, 90 of 100Pattern checks on the skill's files.
  • Model reviewPassed

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
5

Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/v1bh0r/precise-ledger-pro/nw-production-readiness/badge)](https://verified-skill.com/skills/v1bh0r/precise-ledger-pro/nw-production-readiness)

Something wrong with this skill or its page? Tell us.