cnfeat/top-pm-skills/product-launch-checklist

Claude Code and agent skill by cnfeat/top-pm-skills

Trust tier 3
  • community
Source check pending

Checking that the SKILL.md file is still in the repository.

Generate a comprehensive pre-launch, launch day, and post-launch checklist for any product release. Use when preparing for a product launch, feature release, or major update. Produces a role-assigned, tiered checklist covering engineering readiness, marketing and comms, support, and post-launch monitoring.

Install

npx vskill@latest install cnfeat/top-pm-skills/product-launch-checklist

SKILL.md

The same SKILL.md was published earlier as cnfeat/top-pm-skills/product-launch-checklist.

Product Launch Checklist Skill

Never launch without checking everything. Generate a complete, role-assigned checklist covering pre-launch readiness, launch day execution, and post-launch monitoring.

Required Inputs

Ask the user for these if not provided:

  • Launch name and planned launch date
  • Launch tier (1 = major product launch, 2 = significant feature release, 3 = incremental update)
  • Team members and their roles (engineering lead, PM, marketing, support, etc.)
  • Feature description (what is being launched)
  • Rollback capability (can this be feature-flagged or reverted quickly?)

How to Use This Skill

Provide:

  • Launch name and date
  • Launch tier (1 = major, 2 = feature, 3 = incremental)
  • Team members and their roles

The skill generates a tiered checklist. Tier 3 launches use only the Essentials section. Tier 2 adds Marketing & Comms. Tier 1 uses all sections.


Output Format

Launch Checklist — [Feature/Product Name] — Target Date: [Date]

Launch Tier: [1 / 2 / 3] Launch Owner: [PM Name] Engineering Lead: [Name] Go/No-Go Decision By: [Date and time — typically 24 hours before launch]


🔧 PRE-LAUNCH — Engineering & Product (T-2 weeks)
  • [ ] Feature flag created and tested in staging
  • [ ] All acceptance criteria signed off by PM
  • [ ] Code reviewed and merged to main
  • [ ] QA sign-off completed (regression + new feature)
  • [ ] Performance testing completed (load, latency)
  • [ ] Security review completed (if data or auth changes)
  • [ ] Rollback procedure documented and tested
  • [ ] Monitoring and alerting configured
  • [ ] Error logging in place with correct severity levels
  • [ ] Database migrations tested on staging with production data volume
📢 PRE-LAUNCH — Marketing & Comms (T-1 week)
  • [ ] Blog post written, reviewed, and scheduled
  • [ ] In-app announcement or tooltip configured
  • [ ] Email campaign drafted and QA'd
  • [ ] Social media posts drafted and scheduled
  • [ ] Landing page or feature page live in staging
  • [ ] Press outreach sent (Tier 1 only)
  • [ ] Product Hunt / community posts prepared (Tier 1 only)
🎓 PRE-LAUNCH — Sales & Support (T-1 week)
  • [ ] Sales enablement one-pager completed
  • [ ] FAQ document shared with sales and support teams
  • [ ] Help centre articles written and published
  • [ ] Support team demo / training completed
  • [ ] Customer success team briefed on top accounts
  • [ ] Pricing updated (if applicable)
  • [ ] Contracts / ToS updated (if applicable)
📊 PRE-LAUNCH — Analytics (T-1 week)
  • [ ] Analytics events firing correctly in staging
  • [ ] Dashboard configured for launch metrics
  • [ ] Baseline metrics documented
  • [ ] Success criteria documented and shared with team
  • [ ] A/B test configured (if applicable)

✅ GO / NO-GO DECISION — T-24 hours
CriteriaStatusOwner
All critical bugs resolved🟢 / 🔴Eng Lead
QA sign-off complete🟢 / 🔴QA
Rollback tested🟢 / 🔴Eng Lead
Help centre articles live🟢 / 🔴Support
Monitoring active🟢 / 🔴Eng Lead
PM sign-off🟢 / 🔴PM

Go / No-Go Decision: [GO / NO-GO] Decision Owner: [PM + Eng Lead jointly]


🚀 LAUNCH DAY
  • [ ] Feature flag enabled for [X%] of users (start low — 5–10%)
  • [ ] Launch confirmed in team Slack/channel
  • [ ] Metrics dashboard open and being monitored
  • [ ] Error rate checked at T+15 min, T+1 hr, T+4 hr
  • [ ] Blog post published / email sent
  • [ ] Social posts live
  • [ ] Support team on standby for first 4 hours
  • [ ] PM available and reachable all day
  • [ ] Feature flag expanded to 50% if T+2hr checks pass
  • [ ] Feature flag expanded to 100% if T+4hr checks pass

📈 POST-LAUNCH (D+7, D+30)
  • [ ] D+7 metrics review: adoption, errors, support tickets
  • [ ] D+7 customer feedback synthesised
  • [ ] Retrospective scheduled
  • [ ] Learnings documented
  • [ ] D+30 success metrics reviewed against targets
  • [ ] Feature flag removed from codebase (clean up)
  • [ ] Follow-up features added to backlog based on feedback

Quality Checks

  • [ ] Launch tier confirmed before generating checklist (scope determines depth)
  • [ ] Go/No-Go decision has a named owner and a specific decision time
  • [ ] Rollback procedure is documented and tested (not just planned)
  • [ ] Feature flag expansion is staged (5% → 50% → 100%), not all-at-once
  • [ ] Post-launch retrospective is scheduled at launch time

Anti-Patterns

  • [ ] Do not apply a Tier 1 checklist to an incremental update — tier the launch appropriately before generating the checklist
  • [ ] Do not launch on a Friday without confirmed weekend engineering coverage
  • [ ] Do not leave the Go/No-Go decision owner as "the team" — it must be a named individual
  • [ ] Do not skip the rollback plan for Tier 1 and 2 launches — know the revert time before going live
  • [ ] Do not close the launch without scheduling the post-launch retrospective — it must be booked at launch time, not after

Guidelines

  • The Go/No-Go decision must have a named owner — "the team" is not an owner
  • Never launch on a Friday unless you have weekend engineering coverage
  • Recommend starting all launches at <10% traffic — even for simple features
  • Document rollback time: "We can revert this in X minutes" should be known before launch

Security

  • Security scanPassed, 95 of 100Pattern checks on the skill's files.
  • Model reviewPassed

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

Repository stars
53
Repository forks
5
7-day trend score
20

Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/cnfeat/top-pm-skills/product-launch-checklist/badge)](https://verified-skill.com/skills/cnfeat/top-pm-skills/product-launch-checklist)

Something wrong with this skill or its page? Tell us.