ensodynamics/enso-method/delivery-audit

Claude Code and agent skill by ensodynamics/enso-method

Trust tier 2
  • community
  • ext:[{"type":"hook","description":"Pre/post lifecycle hooks"}]
LLM review pending
Source check pending

Checking that the SKILL.md file is still in the repository.

Independent check, once every planned phase of a PRD is closed, that each acceptance criterion is actually built — every required part present and reachable from the entry point a user or calling system would use, not logic nothing calls. Sub-agents read the criteria from the PRD themselves and trace each one through the code, in fresh rounds until one finds no new gap; the main agent confirms every gap, and checks its siblings, before acting on it. It writes no code. Gaps become completion pha…

Install

npx vskill@latest install ensodynamics/enso-method/delivery-audit

Semi-extensibleMentions customization, but needs skill-specific knowledge. Read the extensible skills standard

SKILL.md

The same SKILL.md was published earlier as ensodynamics/enso-method/delivery-audit.

Delivery Audit

An independent check, once a PRD's planned phases are all closed, that every acceptance criterion is built. It asks one question of each criterion: could a user, or the system the criterion is about, get this behavior from the code as it stands? It grades nothing about tests; test-audit does that next. Gaps become completion phases at the end of the plan, built by implement-from-requirements like any other phase.

Every phase already ran deliverable-review. That is not enough on its own:

  • Each review saw one phase's diff. Nothing re-checks a criterion a later phase broke, a cross-cutting criterion across all the phases, or a part that fell between two of them.
  • A phase's Closed line is written by the session that built it. Its own wrap-up decided the criteria were met.
  • Gaps are usually partial, not total. The logic exists but nothing calls it; the main path works and the error case the criterion names doesn't; one of two channels is wired. A missing feature is easy to notice, a half-wired one is not.

One reading misses parts, so the audit reads in rounds. A reader who finds one missing part tends to stop there, and a criterion read as Implemented can still hide one. Every round sends every criterion to fresh assessors, and the assessment ends when a round confirms nothing new, or after four rounds. All the gaps go into one set of completion phases, so the build-and-audit cycle after them checks the repairs instead of finding the gaps one build at a time.

At the end of a split PRD, this audit hands off to test-audit only when it finds no gaps. When either audit adds completion phases, implement-from-requirements builds them, then a repair audit (see Scope) checks the repairs. Repeat until no gaps remain. Building comes before proving, so the test audit never grades tests for behavior that isn't there yet.

A current clean delivery audit found no gaps in the whole PRD and still covers the governing requirements and implementation as they stand. Read its outcome and compare relevant changes since its commit; the existence of a delivery audit complete (whole PRD) commit alone is not enough. Requirements or implementation changes, including small fixes made during a test audit, require a fresh delivery audit followed by test-audit's affected-row reassessment. Test-only and audit-record-only edits, including the criterion amendments an audit makes in its own record commit, do not invalidate a clean delivery audit.


When to Use

  • The last planned phase of a split PRD has closed. implement-from-requirements hands off here with a prompt.
  • The user asks whether a finished PRD, split record or phase delivered every criterion.

Do NOT use this skill for:

  • The review inside a build. That is deliverable-review.
  • Test evidence. That is test-audit, which runs after this one.
  • Work with no written acceptance criteria. This skill checks code against criteria somebody wrote; criteria reconstructed from the code would bless whatever was built.
  • An unsplit PRD, unless the user asks: its one build reviewed the whole PRD.

Scope: Which Criteria Are Audited

The document the user or the handing-off skill points at fixes the criteria, exactly as in test-audit ("Scope: Which Criteria Are Audited"): a phase document's "Acceptance criteria covered" list, a split record's labels (the union of its children's), or every criterion in a PRD or change directory, retired labels excepted.

  • A criterion with a `Superseded by:` line is left out, listed as superseded with its pointer. One with Superseded in part by: is checked on the part still in force (prd-writing-standards, "When Later Work Changes an Earlier Criterion").
  • Only closed phases are checked. A criterion owned by a phase with no **Closed:** line is listed as Not built yet and left out, and so is one an open completion phase completes. Planned work that hasn't run is not a gap.
  • A cross-cutting criterion (one a phase document lists as also applying to its work) is checked across every closed phase that lists it.
  • A repair audit re-reads only what the repairs could have changed. When completion phases were built since a whole-PRD audit, the next audit checks the criteria those phases list and any other criterion whose behavior runs through a file changed since that audit's commit. To find those, one sub-agent takes git diff --name-only <that audit's commit>..HEAD and lists the criteria whose behavior those files carry. Every other criterion keeps the status that audit gave it. Its commit subject still reads (whole PRD).

The Statuses

StatusMeaning
ImplementedEvery required part exists and is reachable from the entry point the criterion is about: the route, command, scheduled job, screen, message handler or export a user or another system would use.
Partly implementedSome required part is missing or unreachable: logic nothing calls, a stub (a hardcoded value, a TODO, a not-implemented branch), a flag that is off everywhere, an error or boundary case the criterion names left unhandled, one of several required outcomes absent, or a value the requirements fix (a limit, an amount, a quoted wording, a recipient) that the code gets wrong.
Not implementedNo code does any part of it.
Waiting on a human actionBuilt as far as code can take it; the rest is an entry in a ## Pending human actions section (a credential issued). Not a gap; named in the wrap-up.
SupersededA later PRD replaced it; the row shows the pointer.
Changed outside the requirementsThe code deliberately does something else a person could have chosen, and no document records the change, or the change overrides a stakeholder's ruling. Shipped behavior stands (prd-writing-standards, "When Later Work Changes an Earlier Criterion"); named in the wrap-up for the user to record.
Not built yetOwned by a phase that has not closed.

A flag the technical design's release steps turn on is not off everywhere: judge the code behind it.

Partly implemented and Not implemented are gaps. Only gaps lead to work.

Presentation is not a part. Wording that says the same thing, a size, a spacing or a layout is a gap only when the criterion states it: it quotes the text or value, or names the layout ("side by side", "visible without scrolling"). Otherwise leave it out of the record: the user judges it by looking at the running product.

The bar is delivered behavior, not proof. An Implemented criterion with no test passes here; test-audit grades its evidence. This audit reads and traces the code, which can miss a part that looks wired and fails when run. The test audit's new tests and red checks are the second net, and the test audit turns anything they find unbuilt into a completion phase of its own.


Process

The assessment is review mode within the criteria in scope (implementation-lifecycle). Writing the completion phases is planning under the same skill's session discipline (No Loose Ends, the Materiality Gate): a gap is a criterion's missing part, never an improvement noticed on the way.

Step 1: Scope and baseline
  1. Resolve the scope (above) and list the criteria by label. Open the first response with one lineage line: Delivery audit of <PRD title>, <Phase id — title, or whole PRD>. It is also the serves: line of this session's marker, whose START is written before the first edit (engineering-principles, "Session Markers").
  2. Note HEAD (git rev-parse --short HEAD). The audit checks the code at that commit; when files in scope have uncommitted changes, the report says so.
Step 2: Fresh-eyes assessment (sub-agents)

Launch general-purpose sub-agents in parallel, each with up to about four criteria grouped by theme or phase, so related criteria share one reader; give a criterion that covers many variants or cases a reader to itself. Give each:

  • The labels to check, and the paths of the PRD, its assumptions document, its technical design and the phase documents it needs. Not the criterion text, a summary of the work, or test-audit.md: it reads the requirements from disk. The phase documents set scope; a Closed line in one is a claim to check, not evidence.
  • The repository root.
  • The absolute path of this SKILL.md, with the instruction to follow its Assessment Checklist and change nothing.
Step 3: Confirm every gap (main agent)

A gap costs a whole build session, so a false one is expensive; a missed one costs a build session and another audit later. Before confirming anything, read every Implemented record against its criterion: each variant, entry point and case the criterion names needs its own traced file and function. Trace any the record skips yourself; one that turns out missing becomes a gap record.

For every Partly implemented or Not implemented record:

  1. Read the code yourself at the places the record names, and confirm the missing part really is missing or unreachable, and that the requirements really state it. A part found implemented after all, or one no requirement states, leaves the record; the row is Implemented only when no missing part is left.
  2. Check its siblings while the code is open. Gaps cluster. A part missing for one provider, channel, entry point or state is often missing for the others the criterion covers, and a missing part in one function is often missing in the functions beside it that do the same job. Read each sibling. One missing the same way is a confirmed gap too, when a criterion in scope requires it; one no criterion in scope requires is not a finding.
  3. Run the conflict check for the confirmed gaps (prd-writing-standards, "When Later Work Changes an Earlier Criterion"; one check covers every row). A later PRD changed the criterion: add the missing pointer pair and list the row as Superseded. The code follows a decision the technical design states with its reason, departing from the criterion, and the PRD was never amended: amend the criterion to match with prd-writing-standards, running the conflict check for an amendment (both ways), and judge the row against the amended criterion. When that criterion records a stakeholder's ruling, list it as Changed outside the requirements instead; amending it would reopen that ruling (Gate 3 in assumptions-document-writing). The code deliberately does something else a person could have chosen: list it as Changed outside the requirements. Otherwise it is a gap.
  4. A gap the requirements don't settle (the criterion needs a value or rule nobody wrote down) is a business question. Write it to the assumptions document with assumptions-document-writing; the completion phase builds on the proposed answer, because an assumption is a green light.
  5. A gap that is costing money, data or production correctness now stops the audit: "Critical finding, stopping to surface."

Read again while rounds find gaps. A round that confirmed a new gap is followed by another full round: Step 2 again over every criterion in scope, briefed exactly as the first, with fresh assessors and the criteria split or paired differently within their themes. Then this step again, for the missing parts no earlier round confirmed; drop the ones already confirmed. A round that confirms no new gap ends the assessment, so a clean first round is the whole of it. After four rounds the assessment ends regardless, and the report says new gaps were still turning up.

Step 4: Write the completion phases

This is the start of the file. Read the full SKILL.md on GitHub.

Security

  • Security scanPassed, 100 of 100Pattern checks on the skill's files.
  • Model reviewNot runA model review is scheduled for the next rescan.

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
0

Not refreshed yet.

Extension points

  • hookPre/post lifecycle hooks

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/ensodynamics/enso-method/delivery-audit/badge)](https://verified-skill.com/skills/ensodynamics/enso-method/delivery-audit)

Something wrong with this skill or its page? Tell us.