Baurecht & Genehmigung workflow for residential construction in Germany (framework portable to DACH with per-country VERIFY): public building law two-tier model — Bauleitplanung (Flächennutzungsplan → Bebauungsplan) and the BauGB admissibility norms (§30 plan-conforming, §31 Ausnahmen/Befreiungen, §34 intra ursem / §35 extra ursem concepts; VERIFY current wording per Land); B-Plan reading checklist (Art der Nutzung, GRZ/GFZ/OWZ, Bauweise, Zahl der Vollgeschosse, Wand-/Firsthöhe, überbaubare Flä…

Install

npx vskill@latest install felixkarevo/construction-skills/building-regulations-permits

Semi-extensibleMentions customization, but needs skill-specific knowledge. Read the extensible skills standard

SKILL.md

The same SKILL.md was published earlier as felixkarevo/construction-skills/building-regulations-permits.

Building Regulations & Permits — Germany (DACH-Portable Framework)

Simple-first gate (governs how this skill is applied). Default every choice here to
the simplest proven solution at the agreed standard tier — see the governing skill
simple-first-building (complexity ladder §1). Escalate to more demanding construction
(innovative systems, one-off details, higher comfort tiers) only when the client
explicitly asks for it, with cost/schedule impact stated; deviate below the usual
standard or the aarRdT only via the documented risk-acceptance machinery
(simple-first-building §3) — public permission never cures the private default.

Germany does not have one building rulebook either — it has four stacks of law that answer four different questions, and almost every regulatory error in German residential work comes from confusing them. Was darf ich hier bauen? (what may I build here) is answered by planning law (BauGB + the parcel's Bebauungsplan, or §34/§35 BauGB where there is none). Wie muss ich es bauen? (how must I build it) is answered by public building law proper — the state building code (Landesbauordnung, LBO) of the specific Bundesland, plus the technical rules introduced through it. Wann muss ich wofür welchen Nachweis führen und wer darf unterschreiben? is answered by the Verfahren and Vorlage rules of that same LBO — which differ meaningfully from state to state. Was schulde ich wem, wann und bis wann? is private law: BGB Werkvertragsrecht, plus VOB/B only if it was actually and wholly contracted. The Musterbauordnung (MBO) that everyone cites is a model, not law — no citizen is ever judged against the MBO itself, only against the LBO that (mostly) follows it, in whichever variant that Land chose. Austria adds a further complication: there is no federal building code at all — Bauordnungsrecht is purely Landessache (nine different Bauordnungen), plus flat-law and Bautechnik rules; Switzerland decides at cantonal and municipal level (Bau- und Zonenordnungen, Baubewilligungsdekret). This skill models all four stacks, keeps them cited separately, walks the German submission lifecycle from B-Plan read to completion, and gives the routing protocol for Austria and Switzerland — but its numeric baseline is Germany, and every Bundesland-specific figure carries a VERIFY tag because state law changes more often than this document is revised.

Reality Check — Licensing & Liability

This skill produces design envelopes, regulatory navigation aids and submission-readiness checklists for planning and FreeCAD modeling ONLY.

  • Nothing produced with this skill — no buildable-envelope calculation, no B-Plan reading, no Abstandsfläche figure, no Nachweis list, no FreeCAD model, no drawing exported from one — is a construction document, a permit application, or an approval.
  • A building project in Germany requires a Baugenehmigung (or a documented Freistellung/Anzeige where the state code exempts it) before construction starts, and the drawings must be prepared and signed by persons who hold the relevant Bauvorlageberechtigung (entry in the state Architects'/Engineers' Chamber list). Building without the required permit exposes the owner to a Baustopp (construction stop), orders to demolish or regularize, loss of insurance coverage, and refusal of utility connections.
  • The agent must never present FreeCAD output, envelope calculations, or any figure from this skill as construction-ready, permit-ready, submission-ready, or "genehmigungsfähig" without that human sign-off.
  • If a user appears to treat output as final — "can I hand this to the builder", "so we're approved", "is this genehmigungsfähig?" — say so unprompted, in that turn, before answering anything else: "This is a planning envelope, not a permit. A vorlageberechtigter Entwurfsverfasser has to prepare and sign the submission, the Tragwerksplaner the statics, and the untere Bauaufsichtsbehörde has to issue the Baugenehmigung before anyone breaks ground."
  • Never certify. Do not produce anything resembling a Unterschriftsblock, a Prüfsachverständigen-Feststellung, a Brandschutznachweis, a Energieausweis, or an engineer's certificate. Never place an architect's name, Kammer-Registrierungsnummer, Prüfingenieur number or signature on output. An Energieausweis in particular may only be issued by persons with the specific GEG §88 drawing entitlement — never by a design aid.
  • The law changes; the edition matters. Every figure here names its statute (MBO §, BauGB §, BauNVO §, GEG, DIN number). Before quoting any of them to a user as current, state the statute, the version this skill assumes, and that the current text and the specific Bundesland's variant must be verified. Superseded law (EnEV, old HOAI fee bindings, pre-2018 Werkvertragsrecht, DIN 4109:2002) quoted as current is a defect generator.
  • Never invent a number to be helpful. A fabricated GRZ or a guessed 3-m setback becomes a rejected application or a neighbour's Widerspruch. "That figure is in the parcel's B-Plan text / the Land's LBO § — here is how to read it" is a correct and complete answer.

Section 0: Fast Path — If You Read Nothing Else

1. Which of the FOUR questions is being asked?
"Darf ich das hier bauen?" ............ Bauplanungsrecht: B-Plan (§30 BauGB) or §34/§35. → §3, §4
"Wie muss ich es bauen?" .............. Bauordnungsrecht: LBO of THIS Bundesland + introduced rules. → §5–§8
"Wer unterschreibt, was reichen wir ein?" Verfahren + Bauvorlagen + Berechtigungen. → §5, §6, §9
"Was schuldet wem bis wann?" ........... Privates Baurecht: BGB, VOB/B nur wenn vereinbart. → §12, §13
2. ALWAYS establish before quoting ANY number:
(a) Bundesland (Bauordnungen, Verfahren, Freistellung, Prüfstatik, Abstandsflächen all differ),
(b) the parcel's own governing plan (B-Plan nr. + version, else §34/§35),
(c) the edition/year of the rule being quoted.
If any is unknown, say WHICH answers are blocked on it. Do not pick a plausible default.
3. The MBO is a model, never the binding text. Cite it only as "MBO-Muster; Landesrecht
prüfen — VERIFY". Never say "laut MBO müssen Sie..." as if it were law.
4. A DIN is binding only if (a) introduced as Technische Baubestimmung in this Land,
(b) referenced by a Zulassung/abP, or (c) it states the allgemein anerkannten Regeln
der Technik. Otherwise it is a recognized technical reference, not law. Say which
case applies. → §7
5. Never quote EnEV (withdrawn 2021→GEG), HOAI Mindestsätze (EUGH 2019 → fees negotiable),
or BauNVO numbers from memory as current law. EnEV-era U-values in a 2020s answer =
the single most common AI regulatory failure. → §18
6. Abstandsflächen and B-Plan setbacks are TWO independent tests; both must pass.
The stricter controls. A B-Plan that allows Grenzbebauung does NOT delete the LBO
requirement — it satisfies it (§6 Abs. 1 Nr. 1 MBO pattern). → §11
7. Every answer ends with the gate: chamber-registered designer signs, building permit
(or documented exemption) exists, then — not before — construction starts.

Section 1: Evidentiary Tiers — How a Technical Rule Becomes Binding in Germany

The single most important methodology fact about German construction regulation: "DIN" and "law" are different things, and the distance between them is crossed by a named legal act. Knowing which tier a number sits in is more useful than knowing the number.

TierLabelHow it bindsExamplesFailure mode when confused
T0Parliamentary statuteDirectly, as cited (federal)BauGB, BGB, Bauleitpläne as Satzung, GEG, VOB as contracted terms never as lawCiting "the Bauordnung" without naming which Land's
T1Parcel-specific binding planThe B-Plan (or örtliche Bauvorschrift, Erhaltungssatzung, Veränderungssperre) binds this plot like a statute (Satzung)GRZ, GFZ, Vollgeschosse, Wandhöhe, Bauweise, Baufenster, textliche FestsetzungenQuoting a "typical" GRZ as if it were the parcel's
T2State building codeLBO of the Bundesland; the MBO only as its modelAbstandsflächen §5/§6 (numbering differs), Verfahren, Vorlageberechtigung, GebäudeklassenApplying Bayern's rule in NRW, or citing the MBO itself
T3Introduced technical rules (Technische Baubestimmungen)LBO §83-type clause + the Land's Verwaltungsvorschrift "Liste der Technischen Baubestimmungen"Introduced DIN 4109, 4108, Eurocodes with national annex, MVV TB, MIndBauRL-type RLs"DIN says so" — without checking whether this Land introduced this edition
T4General type approval / product rulesallgemeine bauartenehmigung, Zulassung, CE per EU construction-products regulation + Bauregelliste A/B/CFenster mit abP, WDVS-Zulassungen, DIBt listingsTreating a Z-approval as valid nationally without expiry check
T5Allgemein anerkannte Regeln der Technik (aRdT)Catch-all clause in LBOs and in private law (§13 VOB/B / §633 BGB "übliche Beschaffenheit"); proven practice, not necessarily a published normVOB/C ATVs, WTA-Merkblätter, Fachregeln des ZVDHEither extreme: "no norm → no obligation" OR "every DIN is aRdT"
T6Contract-agreed standard above lawOnly by agreement; higher market standards are NOT public-law minimaVDI 4100 sound classes, DEGA certificate, QNG sustainability level, KfW standardPresenting the statutory acoustic minimum as what a buyer may expect (or vice versa)
1.1 The three-step test for any technical number
Question: "Is [requirement R] legally binding for this project?"
Step 1 — Is R in the LBO or a Rechtsverordnung of THIS Land? → directly binding. T2
Step 2 — Is the norm containing R introduced as Technische Baubestimmung
in THIS Land, at THIS edition? (Liste der Technischen Baubestimmungen)
→ binding as public-law minimum, usually with transition periods. T3
OR covered by abP/Zulassung/Bauregelliste reference? → binding for that product. T4
Step 3 — If not introduced: is it an allgemein anerkannte Regel der Technik
(established in science/practice, generally applied)?
→ binding via the catch-all clauses and via contract law (BGB/VOB),
with the date that matters being the time of Abnahme (BGH case law) —
NOT via public building law. T5
If none apply: R is best practice or marketing. Quote it as such. T6

Worked contrast (memorize this pattern, not the numbers): DIN 4109 (Schallschutz) is introduced in the LBO states as the public-law minimum between foreign usage units — but the Federal Court of Justice (BGH, 2009) held that the DIN 4109 minimum is not what a higher-standard new-build sale contract owes: "gehobene/zeitgemäße Ausstattung" wording pulls the contractual duty toward VDI 4100/DEGA levels. Same norm, two answers, because tier ≠ tier. Any answer about sound, fire behaviour classes, or barrier-free design that does not separate public-law tier from contract tier is incomplete.

1.2 Mandatory first questions before any number
  1. Bundesland — decides LBO, Verfahren type, Freistellung existence, Prüfstatik duty, Abstandsflächen formula parameters, Nachbarbeteiligung, Kammer laws, Landesenergiegesetz.
  2. Community and parcel — which B-Plan (name, Nr., date of Ausfertigung/Bekanntmachung) or §34/§35 status; local statutes (Stellplatz-, Erhaltungssatzung; Gestaltungssatzung).
  3. Building class and use — Gebäudeklasse (GK) per the state list in §5.2; residential vs mixed vs Sondergebiet.
  4. New build vs existing — Bestandsschutz vs new requirements (GEG existing-building duties, Abstandsflächen of the existing state, change of use).
  5. Date/edition — of the rule being quoted. State it.

This is the start of the file. Read the full SKILL.md on GitHub.

Security

  • Security scanPassed, 100 of 100Pattern checks on the skill's files.
  • Model reviewNot runA model review is scheduled for the next rescan.

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
0

Not refreshed yet.

Extension points

  • pluginCustom plugin integration

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/felixkarevo/construction-skills/building-regulations-permits/badge)](https://verified-skill.com/skills/felixkarevo/construction-skills/building-regulations-permits)

Something wrong with this skill or its page? Tell us.