felixkarevo/construction-skills/construction-detailing

Claude Code and agent skill by felixkarevo/construction-skills

Trust tier 2
  • community
LLM review pending
Source check pending

Checking that the SKILL.md file is still in the repository.

Baukonstruktionsdetails — the joint- and layer-grammar that connects every building system into continuous build-ups (Schichtaufbauten). Layer logic: Trag-, Dämm-, Dicht-, Schutz- and Nutzungsschichten; Schale vs Schicht; ordering rules (vapour control warm-inside / weather tight outside, insulation always outside the load-bearing shell, capillary breaks, staggered layer joints / Entflechtung); multi-stage vs single-stage sealing (Stufigkeit). Connection grammar: Form-/Stoff-/Kraftschluss per d…

Install

npx vskill@latest install felixkarevo/construction-skills/construction-detailing

SKILL.md

The same SKILL.md was published earlier as felixkarevo/construction-skills/construction-detailing.

Construction Detailing — Build-Up Logic and Junction Grammar (DACH)

Simple-first gate (governs how this skill is applied). Default every choice here to
the simplest proven solution at the agreed standard tier — see the governing skill
simple-first-building (complexity ladder §1). Escalate to more demanding construction
(innovative systems, one-off details, higher comfort tiers) only when the client
explicitly asks for it, with cost/schedule impact stated; deviate below the usual
standard or the aarRdT only via the documented risk-acceptance machinery
(simple-first-building §3) — public permission never cures the private default.

A building does not leak, freeze or go quiet "in general" — it fails at a specific line where two planes meet, and it succeeds only if every functional layer survives that line. This skill is the connective tissue of the library: the other skills each own a system (roofs, windows, masonry, concrete, structure, physics); this one owns the junctions between them — the 300–1000 mm zone where the wall build-up must hand its vapour control, airtightness, thermal continuity, rain staging and acoustic mass over to the roof, the window, the plinth, the screed or a pipe — without breaking a single function.

Detailing here follows the DACH (German/Austrian/Swiss) construction culture: layered build-ups, modular coordination, DIN/DIN EN norms and trade rules, executed against tolerances (DIN 18202/18203). The physics is universal; the numbers are DACH-practice numbers.

Use this skill before drawing any junction, before freezing a wall build-up in the model, and whenever a review question is "but is the layer continuous there?"


Reality Check — Liability and Approval

This skill produces design aids, detailing logic and coordination checklists — not a stamped execution plan.

  • Detailing in the German sense is HOAI service phase 5 (Ausführungsplanung) work: every drawn

junction here is a proposal to be verified by the responsible designer/architect against the current norm edition, the product approvals (allgemeines bauaufsichtliches Prüfzeugnis / ETA where applicable) and the manufacturer system guidelines it belongs to.

  • Structural consequences of joints (ring anchor continuity, bearing lengths, waterstop design

pressures, movement force take-down) belong to the structural designer; see structural-systems and concrete-detailing.

  • Waterproofing layer counts, upstand heights and pressure classes must be confirmed against

the current DIN 18531–18535 series (the legacy DIN 18195 scheme survives only in habit); airtightness numbers against current DIN 4108-7/GEG practice; tolerance tables against the current DIN 18202/18203 issues. [VERIFY before quoting a clause or table value in a submittal.]

  • Products marked here with a rule of thumb (sealant joint depth ratios, mounting levels,

screed field sizes, upstand minimums) are principle-level guidance; the binding values are the manufacturer's system data sheet and the applicable norm at the project's contract date.

  • When a junction is safety-relevant (fire compartment wall penetrations, guard rail anchorages

into waterproofing, balcony overturning), never resolve it by copying a catalogue detail — write the performance requirement and have the specialist detail it.

  • If the user intends to build or price from an output of this skill, state plainly: this is a

planning model; licensed sign-off and the building-authority process are required first.


Section 0: Scope — and Which Sibling Skill Owns What

Detailing touches everything; to avoid duplicate and contradictory guidance, this library divides the territory:

TerritoryOwnerWhat THIS skill adds
Roof layers, drainage classes, waterproofing stacks, upstandsroofing-waterproofingHow the roof stack terminates into wall/parapet/window-opening and how its layers continue at the junction
Window/door units, lintels, sills, the Dichtungsstufen systemopenings-windows-doorsJunction-zone build-up: mounting depth, insulation-plane continuity, reveal flanks, tolerance gaps around the fixed unit
Masonry units, fmk design, bonds, ring beams, plinth/DPCmasonry-constructionLayer continuity across masonry-to-other-systems lines; movement-joint layout
Rebar, cover, WU design, waterstops numericsconcrete-detailingWhere joints sit, why (buildability/movement), and what the sealing layer must survive
U-values, Ψ, fRsi, Glaser, airtightness numbersbuilding-physics-thermal-moistureThe constructive measures that produce the assumed Ψ/n50 — geometry, layer stops, tapes, overlap directions
Rw/L'n,w design, flanking classesbuilding-acousticsThe joint geometry (bearing + decoupling + flank sealing) that makes the acoustic model true at walls/floors
Statical systems, bracing, load pathsstructural-systemsConnection technology at element level (Schlussarten, bearings, tension chords) and its detailing consequences
FreeCAD BIM hierarchy, void cuts, FEMconstruction-freecad-bimLayer-object modelling convention + IFC property propagation for build-ups

If a task is inside one system, route to its skill. If it is a line where two systems meet, this skill leads.


Section 1: The Grammar of Build-Ups (Schichtaufbau)

1.1 What a detail must satisfy simultaneously (function hierarchy)

Every building element serves three main functions — Tragen (load-bearing), Einhüllen (enclosing), Ver-/Entsorgen (media supply) — and the envelope carries seven named sub-functions (bauliche Teilfunktionen) that a single junction must all survive:

  1. Feuchteschutz — moisture protection (rain, driven rain, splash-back, ground moisture,

pressing water, capillary moisture, vapour, condensate, ice/snow/wind-blown snow — each has its own control path)

  1. Wärmeschutz — thermal (continuous insulation plane, no bridge paths, surface

temperatures above mould limit)

  1. Luft-/Winddichtheit — air/wind tightness (continuous surface, mechanically protected)
  2. Schallschutz — acoustic (mass continuity or clean double-leaf, no rigid flanks)
  3. Brandschutz — fire (load-bearing duration + Raumabschluss; joints as weak as the element)
  4. Dauerhaftigkeit — durability (cross-cutting: drainage of water, protection of layers from

UV, frost, mechanical attack, erosion)

  1. Kraftleiten — force transmission (support forces, tie forces, anchor pulls through or

around the build-up without destroying 1–5)

The designer's conflict table, stated once and true everywhere:

  • **Load-bearing wants dense/stiff material = thermally conductive; insulation wants porous =

carries nothing, is vapour-open, water-sensitive and acoustically poor.** Both compete for the same thickness. Resolve by (a) strict plane separation (insulation in its own layer, outside the structure) or (b) a compromise material (masonry with pores; wood, λ ≈ 0.15 W/(m·K), the only structural material that nearly does both — still not Passivhaus-grade alone).

  • Water destroys insulation instantly: λ_water 0.6 vs λ_air 0.025 (≈ 24×) — a wet mat has lost

its function; a material that is perfectly watertight and vapour-open does not exist (no "Gore-Tex principle" in building sheets). Every build-up is therefore a strategy about which of the two the outer skin plays.

  • Cracks = loss of tightness function: cracking is material-immanent in concrete/masonry and

mostly harmless for load, but must be controlled in sealing layers and at joints.

Terminology discipline (use these consistently in drawings and BIM labels):

  • Schale (shell) = a layer with enough strength/stiffness to carry load (masonry wythe,

concrete wall, cladding panel acting as shell).

  • Schicht (layer) = any material position with an assigned function regardless of stiffness

(a vapour foil is a Schicht, never a Schale).

  • Aufbau (build-up) = the sequence of functional layers stacked in the thickness. Colloquially

"Dämm-Aufbau" = a layer package containing thermal insulation, not mere render/coating.

  • Every layer sits at a fixed position because the gradients across the thickness —

temperature, vapour pressure, sound level, saturation — are directional. Moving a layer changes its function.

1.2 The five layer roles (functional classification of every position)

Read every build-up as five functional roles, however many physical sheets it contains:

Role (German)FunctionTypical membersFailure if missing
Tragschicht (structural layer)Kraftleiten, fire massRC, masonry wythe, timber frame/CLT, steel deckcollapse, buckling of build-up
Dämmschicht (insulation layer)Wärmeschutz, acoustic springEPS/XPS/PIR, mineral wool, foam glass, cell glasshigh Ψ/U, cold inner surfaces, single-leaf acoustic
Dicht-/Steuerungsschicht (air/barrier layer)Luftdichtheit + vapour controlDampfbremse/-sperre foils, taped boards, airtight plaster, WU concrete itselfconvective moisture damage, drafts, noise leakage
Schutz-/Wetterseite (weather layer(s))Feuchteschutz + durabilityrender/ETICS skin, cladding + substructure, roof covering, tanking sheet, protection/filt layerswetting, UV, frost, erosion, mechanical damage
Nutzungsschicht (finish/wearing layer)use + room physicsfloor finish, screed, tiles, plaster, panelling, pavingabrasion, splash, cleanability, appearance

Ordering rules (the laws of layer sequence):

This is the start of the file. Read the full SKILL.md on GitHub.

Security

  • Security scanPassed, 100 of 100Pattern checks on the skill's files.
  • Model reviewNot runA model review is scheduled for the next rescan.

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
0

Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/felixkarevo/construction-skills/construction-detailing/badge)](https://verified-skill.com/skills/felixkarevo/construction-skills/construction-detailing)