GOVERNING skill of the library: the simple-first principle and its German civil-law machinery. Default every building decision to the simplest proven solution at the agreed standard tier; escalate complexity only on explicit client request. Owns the § 633 BGB three-step defect test, the implied promise of "allgemein anerkannte Regeln der Technik" (aarRdT), the DIN presumption and its rebuttal, lawful downward deviation ("Beschaffenheitsvereinbarung nach unten", Beweislast, insurance exclusion,…

Install

npx vskill@latest install felixkarevo/construction-skills/simple-first-building

SKILL.md

The same SKILL.md was published earlier as felixkarevo/construction-skills/simple-first-building.

Simple-First Building — Governing Principle & Civil-Law Machinery

This skill governs how every other skill in the library is applied. Read it
first in any new project. Its core rule: **the first design answer is the simplest
proven one; demanding construction is an explicit, priced, documented decision —
never a default.**

0. The two problems this skill solves

(1) Cost/complexity drift. German building is expensive partly because two independent legal engines push standards upward without anyone deciding to:

  • Public law: Landesbauordnungen + incorporated technical Baubestimmungen set

growing requirements.

  • Civil law (the silent engine): BGH case law treats planners/contractors as

impliedly promising ("stillschweigend zugesichert") the usual quality/comfort standard of comparable, contemporaneously completed buildings and the allgemein anerkannten Regeln der Technik (aarRdT) — so every designer plans defensively high to avoid later Haftungsvorwürfe ("lieber mit zu hohen Standards geplant"). Rising standards therefore = defensive over-engineering, embedded in private law, invisible to the client's budget conversation.

(2) The mirror risk — "simplification ≠ safety collapse". A design culture of simplicity that quietly under-builds gets destroyed by the same machinery: an aarRdT-deviation without proper agreement is an automatic Mangel even with zero symptoms. This skill's job is to let simplicity be chosen knowingly and lawfully, upward or downward, instead of either drifting up by default or dropping down by accident.

Timeline of the political answer (status knowledge — re-verify before use): 2022 "Gebäudetyp e" initiative (Bayerische Architektenkammer; "e" = einfach/ experimentell) → 2024 Referentenentwurf → Nov 2024 "Gebäudetyp-E-Gesetz" draft (BT-Drs. 20/13959) — failed with the end of the Wahlperiode → 05.05.2025 coalition agreement safeguards Gebäudetyp E → Nov 2025 BMJV + BMWSB "Gemeinsame Eckpunkte Gebäudetyp E" (civil-law amendments to the BGB Bauvertragsrecht; § 6 of D). Legislative status must be checked current [VERIFY before relying].


1. THE COMPLEXITY LADDER — simple first, per discipline

1.1 The gate rule

For every design axis below, the library's default answer is Level 0. Moving up a level requires all three:

  1. an explicit client wish (named in the program of requirements / contract —

not inferred from "quality expectations"),

  1. a cost and schedule impact statement to the client before commitment

(rough figures below; market-dependent [VERIFY per project]),

  1. where the escalation changes structural physics, **a design review against the

owning skill** (e.g. wide spans → structural-systems/structural-analysis).

Moving down below the usual standard/aarRdT requires the § 3 machinery (documented downward Beschaffenheitsvereinbarung) — public-law permission is not enough (§ 2.6 central trap).

1.2 Escalation axes, defaults and triggers
#AxisLevel 0 default (simple & proven)Escalations (only on explicit wish)Typical impact of leaving L0Owning skill for detail
A1Geometrycompact rectangle, one volume, gable or shed roof, no split levelsL/U shape, cantilevers, Kink, Staffel, split-level, Sonderformeach bend of the envelope ≈ +5–15 % KG300/400 (α = A/V worsens; see building-physics compactness bands) [VERIFY project]building-typology, construction-detailing
A2Storeys/basementErdgeschoss + 1–2 OG on slab, no UG; Kellerverzicht as default questionfull UG, partial UG with reduced ceiling, TiefgarageUG ≈ +300–600 €/m² NF vs. slab solution; Hamburg pilot: Verzicht on UG/Fassade/Aussenanlagen alone ≈ 1,000 €/m² (§ 6.2)geotechnics-foundations, cost-management-din276
A3Structureloadbearing masonry + precast or RC floor slabs on simple grid (spans ≈ 3.5–6.5 m), standard footingswide spans, flat decks, point supports, long cantilevers, exposed concrete, timber hybrid on non-standard grid, special systems (Aussteifungskern variants beyond standard)flat deck/cantilever premium on KG300–302 ≈ 10–30 % + detailing risk; every jump = full EC2/EC5/EC6 re-checkstructural-systems, concrete-detailing, masonry-construction, timber-steel-design
A4Envelopemonolithic or masonry + WDVS, standard Putz surfaceventilated RVS, Naturstein, Sonderbeschichtungen, memory/special formats, double skinRVS ≈ +80–200 €/m² WNF; specialisation raises both cost and execution-error surface (§ 1.4 "Komplexitätssteuer")construction-detailing, building-materials
A5Roofpitched, standard tile/small-form, simple geometry, no dormersflat roof (+ strict DIN 18195/18531 regime), Gründach, Photovoltaik-Integration, Faltungen, Dachfenster instead of Gaupenflat-roof build-up cost ≈ 1.5–2× pitched per m² and higher maintenance; every fold = detail + water riskroofing-waterproofing
A6Openingsseries-typical window sizes, standard turn-tilt, no special formatslarge glass, Hebe-Schiebe, Sonderformen, brandabschnitte doors, special shadinglifting equipment + statik + Einbruch/Brandschutz consequences; U-Wert/Glas cost non-linear from ≈ 2.5 m width [VERIFY]openings-windows-doors
A7Stairs/circulationstraight single-flight or standard U-flight, off-the-shelf landingspindless winding, freitragend, Balustradensonderlösungen, Raumspartreppebespoke stairs ≈ 2–4× series price; every special statics case needs its own calcstairs-vertical-circulation
A8Services (TGA)heat pump + FBH (or simplest compliant heating per GEG), window ventilation, standard electrical per DIN 18015additional Lüftungsanlage (only where Schallschutz/BSK/airtightness logic demands it), Kälte, RWA beyond requirement, full AVS, smart building, dezentrale WLeach added system ≈ +1.5–4 % total cost + maintenance annuity; Bayern pilot ran WITHOUT Lüftung in multi-storey (§ 6.1) — proof of L0 feasibility with agreed comfortbuilding-services-tga
A9Comfort tiers (vereinbar!)normaler Standard: DIN 4109-1 Mindestschallschutz, DIN 18040-2 (barrier-reduced where funding demands), standard room heights 2.50–2.70 merhöhter Schallschutz (Exec), gehobene Ausstattung, Raumhöhe ≥ 2.80, Wellness-/Sonderbereichetier choice = the FIRST cost lever; note the tier also re-anchors which aarRdT are owed (§ 2.3)building-acoustics, accessibility-universal-design
A10Water/sitesurface drainage to street per Satzung, standard versickerungsfreiRetention/Zisterne, Schwammstadt-Bausteine, begrüntes Versickerungsmodell, grauwassereach ≈ four- to five-figure € + Pflegevertrag; often B-Plan-driven (then not optional)construction-scheduling-site, building-regulations-permits
A11Process/deliveryone-off craft execution, classical Hochbau planserielles Bauen/Typologie, Typengenehmigung, Taktplanung, BIM full-LoIN, AVP generalplanerischserialisation amortises the § 3 documentation effort across N objects; single-object = keep documentation leanconstruction-scheduling-site, bim-management

Reading the ladder: a "simple" house (EFH/DHH at L0 across all axes) is not a lesser building — it is the compact rectangle on a slab, masonry + WDVS, tiled gable roof, series windows, straight stairs, heat-pump + FBH, normal tier, surface-drained, one-off delivery. Every departure from that description is a named, priced decision. Put the ladder in the client conversation at Leistungsphase 1–2, not at detail design.

1.3 Simplicity checks the ladder must pass

Before proposing L0, verify it is actually sufficient (function governs, § 2.2):

  • site loads/water → geotechnics-foundations (a WU slab where groundwater demands

it IS the simple solution; "schwarze Wanne" then needs § 3.6 machinery, not a shrug);

  • span needs → structural-systems (L0 grid must fit the program; forcing L0

geometry onto a program that needs spans manufactures complexity later at worse cost);

  • fire/egress → fire-protection-building (Gebäudeklasse thresholds are hard

gates: L0 MFH ≠ L0 EFH — GK 4/5 add second routes, Wände, Bekleidungsklassen);

  • acoustics floor → building-acoustics (DIN 4109 minimum is aarRdT; anything

below needs § 3 machinery);

  • energy floor → current GEG requirements are law; "simple" never means "below GEG"

unless the client accepts it as a contracted tier statement (see § 3, and note Typ-E proposals anchor exactly at the Länder Baubestimmungen).

1.4 Komplexitätssteuer — hidden cost of every extra level

Complexity taxes: more trades with mutual interfaces (Schnittstellen = where the BGH sees coordination defects), more unique details = more abZ/Ingenieurtext surface, longer coordination, higher execution-error probability, maintenance annuity. Rule of thumb for client conversation: each non-L0 axis multiplies the number of failure-relevant junctions ≈ +1–3 per axis on top of the price delta. Process speed (Hamburg field 3: ≈ 400 €/m², § 6.2) is available to everyone without touching standards — exhaust it before buying complexity.

1.5 When complexity pays — legitimate escalations

Escalation is right when L0 fails a hard constraint or the client's explicit programme demands otherwise: poor soil + no UG (mat vs pile → geotechnics), B-Plan wall-height/roof-band conflicts resolved by flat-roof variants, Innenbereichsschutz noise forcing Lüftungsanlage instead of open windows (building-services-tga), accessibility programme (DIN 18040-1 lifts), heritage or city-representative façade. Document WHY (a one-paragraph Entwurfsbegründung per escalated axis) — it is the cheapest liability insurance and the input for § 3.4 templates.


2. CIVIL-LAW DEFAULT MECHANICS — what "built simply" legally means

2.1 § 633 BGB three-step defect test

Mangel = Ist-Beschaffenheit negatively deviates from Soll-Beschaffenheit. Assessment order (§ 633 Abs. 2 S. 2 BGB):

  1. vereinbarte Beschaffenheit — express agreement dominates absolutely

(including an agreed standard label: "einfach"/"normal"/"gehoben").

  1. Eignung für die nach dem Vertrag vorausgesetzte Verwendung — fitness for

the contractually presupposed purpose.

  1. gewöhnliche Verwendung + übliche Beschaffenheit — ordinary-use fitness

PLUS "quality the customer of works of the same kind can expect."

Interpretation via the whole contract body (BGH NJW 2012, 518); public procurement = objective bidder view (BGH NZBau 2014, 185) and a silent LV may be supplementally construed against the bidder (BGH NZBau 2002, 324).

2.2 The functional concept — why specs never exhaust duty

The contractor always owes a working result for the recognised purpose — independently of wording. Bridge case (→ § 5.1): agreed Tragfähigkeit formally met, contractor knows heavy vehicles will cross → Mangel despite spec-conformity. Contractor's exit: advise, offer sufficient design against Nachtrag; if the informed client insists → freed of liability to that extent. Compliance with aarRdT does NOT immunise against the functional test (BGH NJW-RR 2011, 1240); the two limbs coexist: functionally deficient work = mangelhaft even if DIN-perfect; aarRdT-deficient work = mangelhaft even if presently functional.

2.3 aarRdT — the impliedly owed minimum

This is the start of the file. Read the full SKILL.md on GitHub.

Security

  • Security scanPassed, 100 of 100Pattern checks on the skill's files.
  • Model reviewNot runA model review is scheduled for the next rescan.

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
0

Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/felixkarevo/construction-skills/simple-first-building/badge)](https://verified-skill.com/skills/felixkarevo/construction-skills/simple-first-building)

Something wrong with this skill or its page? Tell us.