nesnilnehc/ai-cortex/design-strategic-goals
Claude Code and agent skill by nesnilnehc/ai-cortex
- community
Checking that the SKILL.md file is still in the repository.
Define 3–5 long-term strategic goals that move the project toward the vision and North Star. Produces a goals document aligned with mission, vision, and NSM; persisted to docs.
Install
npx vskill@latest install nesnilnehc/ai-cortex/design-strategic-goalsSKILL.md
The same SKILL.md was published earlier as nesnilnehc/ai-cortex/design-strategic-goals.
Skill: Design Strategic Goals
Purpose
Define 3-5 long-term strategic goals that move the project toward the vision and the North Star. Produce an outcome-centred goals document (not a task list or a roadmap). Does not define mission, vision, North Star, or milestones.
Core Objective
Primary goal: produce a user-confirmed strategic goals document holding 3-5 outcome-centred goals aligned with the vision and the North Star, persisted to the path agreed for the project.
Success criteria (all must be met):
- ✅ 3-5 goals recorded: exactly 3-5 strategic goals, each with a clear title and a short description.
- ✅ Outcome-centred: each goal describes an outcome whose attainment can be judged, not a task list, a feature list, or a restatement of a pillar direction.
- ✅ Aligned with the vision: every goal supports the vision; the alignment is stated or self-evident.
- ✅ North Star link: at least one goal explicitly supports or moves the North Star metric; optional: a short note per goal on "how this supports the vision/NSM".
- ✅ User confirmation: the user explicitly approves (e.g. "approved", "looks good", "go ahead", or equivalent).
- ✅ Document persisted: written to the agreed path (default
docs/project-overview/strategic-goals.md, or per project norms). - ✅ Engineering-health goal included: a long-term project (planning horizon > 6 months) must include a goal of the "sustainable engineering / governance health" kind; a short-term or experimental project may take an explicit exemption and record the reason in the document. Rationale: without a strategic sponsor, the long-term value of governance / tech-debt / documentation work can be overlooked during prioritization.
Acceptance test: can a reader see how each of the 3-5 goals advances the vision and the North Star, with no dates or stages (those belong to milestones)? Does a long-term project carry one goal that speaks for governance / engineering health?
Handoff point: once the goals are approved and persisted, hand off to "define-roadmap" to break the goals into stage checkpoints, or stop.
Scope Boundaries
This skill does:
- Elicit and record 3-5 long-term strategic goals.
- Ensure alignment with the vision and the North Star (read from the "define-vision" / "define-north-star" output, or from existing documents).
- Persist to the path agreed for the project (default "docs/project-overview/strategic-goals.md").
- Optional: a note per goal explaining how it supports the vision or the North Star.
This skill does not do:
- Define the mission, vision, or North Star (use "define-mission", "define-vision", "define-north-star").
- Break goals into stages or dates (use "define-roadmap").
- Write requirements, roadmaps, or backlog (use "analyse-requirements", "project-planning", "capture-work-items").
Use Cases
- After the vision and the North Star: set 3-5 strategic outcomes that advance the vision and move the NSM.
- Annual or quarterly strategy: define or update strategic priorities.
- When the backlog lacks goal alignment: create explicit goals so the roadmap and the backlog can trace to them.
- The fourth layer of the strategy chain: follows mission, vision, and North Star when the full hierarchy is being built.
Behavior
Interaction Policy
- Default: the output path from project norms if one exists; otherwise "docs/project-overview/strategic-goals.md". Read the vision and the North Star from "docs/project-overview/" if they are there.
- Cold-start fallback: when
vision.mdandnorth-star.mdare both missing, do not halt; switch to "Cold-Start Fallback Mode" below and infer candidate goals from repository evidence. When only one is missing, stay on the normal path and derive from the one that exists. - Choice of options: if the user has more than 5 candidate goals, offer to rank or cluster them into 3-5; ask the user to confirm the final set.
- Confirm: before overwriting an existing strategic goals file; before the final persist.
Execution Process
- Load the vision, North Star, and strategic pillars: read
docs/project-overview/vision.md,docs/project-overview/north-star.md, anddocs/project-overview/strategic-pillars.md(where present), or a summary supplied by the user.
- Both missing → switch to "Cold-Start Fallback Mode"; the remaining steps are unchanged.
- Work backwards from the North Star metric: ask "what must be true for the North Star metric to grow?" Each "must be true" is a candidate goal. Goals climb in layers, from base capability to refinement.
- Draft the goals: focus on outcomes (e.g. "cut deployment time to under 5 minutes for 80% of teams"); not a task list or a feature list.
- Engineering-health goal check:
- Ask about or judge the project's planning horizon (> 6 months counts as a long-term project).
- Long-term project whose draft has no engineering / governance health goal → ask the user whether to bring in the default template (see "Engineering-Health Goal Template" below); the user can adjust the key results to fit the project.
- Short-term or experimental project where the user takes the exemption → record the "exemption rationale" at the end of the document.
- Check alignment: every goal supports the vision; at least one explicitly supports the North Star.
- Persist: write to the path agreed for the project; create "docs/project-overview/" if it is missing. Optional: add "how this supports the vision/NSM" to each goal.
Cold-Start Fallback Mode
Trigger: vision.md and north-star.md are both missing. Working backwards from the North Star then has no basis, but the repository itself is an extractable evidence source — this must not degrade into interrogating the user from scratch, item by item.
Extraction sources (ordered by intent density; work down the list and stop once you have enough):
README.md/AGENTS.md/CLAUDE.md— the intent the project states about itselfCHANGELOG.md— where effort actually went; the highest intent density- Recent git log — same as above; the two are independent, and git log on its own is enough when CHANGELOG is missing — do not skip this level because one of the two is absent
- Code directory structure and dependency manifest — the capability boundary
- Existing backlog / issues — unmet needs
- The rest of
docs/
Safety constraints (not omissible): a goal inferred from evidence reads as coherent and fluent — which is exactly why it is most likely to be invention filling a blank. So:
- Every candidate goal must carry an "inference basis" pointing at a specific file and location. A goal whose basis cannot be derived must not be written
- Mark everything as inferred rather than confirmed. Must not persist automatically; the user must confirm or correct each item
- Leave a marker at the top of the persisted document:
> This batch of goals lacks vision / North Star backing and is a temporary anchor; once the upstream is in place this skill must be rerun - Tell the user plainly: this is fallback output, and the normal path is to run
define-visionanddefine-north-starfirst
Output shape:
Engineering-Health Goal Template (Default)
A long-term project must hold a goal of this kind (tune the specific key results per project):
This goal supports the long-term achievability of all the other strategic goals; it is not a standalone product goal. Its existence guarantees that governance / tech-debt / documentation groundwork holds a legitimate strategic position in the competition for value — goal mapping makes its long-term value explicit when items are prioritized alongside product work.
Input & Output
Input:
- Required: project context.
- Required on the normal path: the vision; the North Star (or paths to the vision/North Star documents). When both are missing, switch to cold-start fallback mode and infer from repository evidence.
- Optional: mission; time horizon; existing goals or priorities.
Output:
- Artifact: the strategic goals document.
- Location:
docs/project-overview/strategic-goals.md(or per project norms). - Content: 3-5 strategic goals (title + short description); optional: links to the vision/NSM, and a "how this supports the vision/NSM" note per goal.
- Lifecycle: living (reviewed on the strategy cycle).
Restrictions
Hard Boundaries
- Do not define the mission, vision, North Star, or milestones in this skill.
- Do not put dates or stages in the goals document (those belong to "define-roadmap").
- The document must not carry fewer than 3 or more than 5 strategic goals.
- A long-term project (planning horizon > 6 months) must not drop the engineering / governance health goal entirely; an exemption must record its reason in the document.
- Must not persist automatically in fallback mode: an evidence-inferred candidate goal is written only after the user confirms or corrects each item.
- Must not write an unsupported goal in fallback mode: every candidate goal must point at a specific extraction-source file and location; where no basis can be derived, leave it out.
Skill Boundaries (no overlap)
Do not do these (other skills handle them):
- Mission: why we exist → use
define-mission. - Vision: what future we are building → use "define-vision".
- North Star: the single metric → use
define-north-star. - Milestones: stage checkpoints → use
define-roadmap. - Requirements or backlog: use "analyse-requirements", "capture-work-items", project planning.
When to stop and hand off:
- The user says "approved" or equivalent → the goals are done; offer the handoff to "define-roadmap".
- The user asks for stages or milestones → hand off to "define-roadmap".
Self-Check
Core Success Criteria (all must be met)
- [ ] 3–5 goals recorded: exactly 3–5 strategic goals, with titles and descriptions.
- [ ] Outcome-focused: every goal is an outcome or a result, not a task list.
- [ ] Aligned with the vision: every goal supports the vision.
- [ ] North Star link: at least one goal explicitly supports or moves the North Star (not applicable in fallback mode; the next item replaces it).
- [ ] Fallback-mode compliance (fallback path only): every goal carries an inference basis pointing at a specific file; each has been confirmed by the user; the document header carries the "no upstream backing, temporary anchor" marker.
- [ ] Engineering-health goal: a long-term project holds an engineering / governance health goal; an exemption has its reason recorded.
- [ ] User confirmation: the user said "approved", "looks good", "go ahead", or similar.
- [ ] Document persisted: written to the agreed path (default
docs/project-overview/strategic-goals.md, or project norms).
Process Quality Checks
This is the start of the file. Read the full SKILL.md on GitHub.
Security
- Security scanPassed, 100 of 100Pattern checks on the skill's files.
- Model reviewNot runA model review is scheduled for the next rescan.
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/design-strategic-goals/SKILL.md
Popularity
- Repository stars
- 7
- Repository forks
- 3
- 7-day trend score
- 15
Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/nesnilnehc/ai-cortex/design-strategic-goals)