Generate interactive HTML Gantt charts with Critical Path Method (CPM) analysis from task lists and dependencies, highlighting the critical path and calculating float times. Use when the user asks to create a Gantt chart, schedule project tasks, analyze the critical path, visualize dependencies, or mentions project timelines, milestones, or task scheduling.
Install
npx vskill@latest install nstung463/kimi-agent-skills/gantt-plannerSKILL.md
The same SKILL.md was published earlier as serejaris/kimi-skills/gantt-planner.
gantt-planner -- Interactive Gantt Chart & Critical Path Analysis
Automatically performs Critical Path Method (CPM) analysis on task lists and their dependencies, generating interactive HTML Gantt charts. Supports zooming, critical path filtering, hover details, and dependency arrow visualization.
Quick Start
Simplest usage — pass JSON directly:
Read from a file with a specified start date:
Methodology: Critical Path Method (CPM)
Core Concepts
| Term | Abbreviation | Meaning | |
|---|---|---|---|
| Earliest Start | ES | The earliest point at which a task can begin | |
| Earliest Finish | EF | The earliest point at which a task can be completed (ES + Duration) | |
| Latest Start | LS | The latest a task can start without delaying the project | |
| Latest Finish | LF | The latest a task can finish without delaying the project | |
| Total Float | TF | LS − ES; the number of days a task can be delayed | |
| Critical Path | — | The sequence of tasks with zero float, determining the project's minimum duration |
Calculation Steps
- Topological Sort: Order tasks by dependencies, detecting any circular references
- Forward Pass: Starting from the initial tasks, compute ES and EF for each task
ES = max(EF of all predecessors)EF = ES + Duration
- Backward Pass: Working back from the final tasks, compute LS and LF
LF = min(LS of all successors)LS = LF - Duration
- Identify the Critical Path: Tasks where float (LS − ES) equals 0 form the critical path
Input Format
A JSON object with the following fields:
| Field | Required | Type | Description | |
|---|---|---|---|---|
| project | No | string | Project title; defaults to "Project Gantt Chart" | |
| start_date | No | string | YYYY-MM-DD format; can be overridden by the CLI --start-date flag | |
| tasks | Yes | array | List of tasks | |
| tasks[].id | Yes | string | Unique task identifier | |
| tasks[].name | Yes | string | Task name | |
| tasks[].duration | Yes | number | Duration in days; must be > 0 | |
| tasks[].dependencies | No | array | List of predecessor task IDs; defaults to [] |
Output Features
The generated HTML file is fully self-contained (no external dependencies) and includes the following interactive features:
- Gantt Chart Visualization: Bar chart with time on the horizontal axis and tasks on the vertical axis
- Critical Path Highlighting: Critical tasks in red, non-critical tasks in blue
- Dependency Arrows: SVG-drawn dependency lines; critical dependencies are bold red
- Float Time Display: Semi-transparent orange areas showing how much a task can be delayed
- Hover Details: Hover over a task to see full CPM analysis data
- Task Highlighting: Click a task to highlight its direct predecessors and successors
- Zoom Control: Slider to adjust timeline granularity
- Critical Path Filter: Toggle to show only critical path tasks
- Today Marker: Green vertical line indicating the current date
- JSON Export: Export the complete dataset with CPM annotations
Script Arguments
Full Example
Scenario: Software Development Project Schedule
Analysis results:
- Total duration: 32 days
- Critical path: A → B → D → E → G → H → I → J
- UI/UX Design (C) has float time and can be delayed without affecting the total duration
Notes
- Circular dependencies (A depends on B, B depends on A) are not allowed; the script detects and reports them
- Duration is measured in calendar days; weekdays and holidays are not distinguished
- All task IDs must be unique
- The generated HTML can be opened offline — no internet connection required
Security
- Security scanPassed, 100 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/gantt-planner/SKILL.md
Popularity
- Repository stars
- 4
- Repository forks
- 1
- 7-day trend score
- 13
Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/nstung463/kimi-agent-skills/gantt-planner)