patrickbdevaney/optime/optime-impact

Claude Code and agent skill by patrickbdevaney/optime

Trust tier 2
  • community
LLM review pending
Source check pending

Checking that the SKILL.md file is still in the repository.

Before editing a load-bearing symbol (one with many callers, or a function/class other modules import), call optime-codeintel impact_of to see the blast radius — affected functions, the tests that cover them, and a risk level — so the edit is made with its consequences in view rather than discovered after. Use find_symbol / callers / callees / outline to navigate structurally instead of grepping, and rename_symbol (preview first) for a cross-file rename.

Install

npx vskill@latest install patrickbdevaney/optime/optime-impact

SKILL.md

The same SKILL.md was published earlier as patrickbdevaney/optime/optime-impact.

optime-impact — look before you leap on a load-bearing edit

A change to a widely-called function or a class other modules depend on can break code far from the edit site. optime-codeintel derives that blast radius structurally from an AST graph — not from a guess, and not from grep — so you can edit with the consequences in view.

When to use

  • You are about to change a function/class signature, behavior, or remove it.
  • The symbol looks load-bearing: it has many callers, or other modules import it.
  • You are about to do a cross-file rename.

For a one-off local edit to a leaf function nobody else calls, you don't need this.

How to use

  1. `impact_of(symbol)` — returns affected_functions (transitive callers), affected_tests

(the coverage you have), importing_files, and a risk level (low|medium|high|critical; wide reach with no tests = critical). Read this BEFORE editing.

  1. If the risk is high/critical, widen your plan: update the callers the report names, and run the

tests it lists after the edit.

  1. `callers` / `callees` — walk one hop of the call graph to understand how the symbol is used.
  2. `find_symbol(query)` — jump to the definition site instead of grepping.
  3. `outline(path)` — get a file's structure (classes, functions, line ranges) at a glance.
  4. `rename_symbol(old, new, preview=True)` — see every edit site first; then preview=False

to apply atomically (it only writes if every changed file still parses).

If the graph is empty, call `index_repo(repo_path)` once (AST-only — no language server needed).

The principle

The cost of reading the blast radius is one tool call; the cost of discovering it after a broken edit is a debugging session. On a load-bearing symbol, always look first.

Security

  • Security scanPassed, 100 of 100Pattern checks on the skill's files.
  • Model reviewNot runA model review is scheduled for the next rescan.

Quality evaluation

  • Task evaluationNot runNo evaluation yet. Run one in Skill Studio.

Source

Popularity

7-day trend score
0

Not refreshed yet.

Works with

Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.

  • Claude Code
  • Cursor
  • GitHub Copilot
  • Windsurf
  • Codex
  • Gemini CLI
  • Cline
  • Amp
  • Roo Code
  • Goose
  • Continue
  • Kilo Code
  • Junie
  • Trae
  • OpenHands
  • Qwen Code
  • AI Agent
  • Tabnine Chat
  • Sourcegraph Cody
  • Amazon Q
  • Firebase Genkit
  • Sweep
  • Devin
  • Phind
  • Mentat
  • Claude Desktop
  • Aider
  • GPT Pilot
  • Plandex
  • bolt.new
  • v0
  • Replit Agent
  • Anse
  • TypingMind
  • BetterChatGPT
  • LibreChat
  • Warp AI
  • Pieces
  • Fig AI
Embed badge
vskill VERIFIED badge
[![vskill VERIFIED](https://verified-skill.com/api/v1/skills/patrickbdevaney/optime/optime-impact/badge)](https://verified-skill.com/skills/patrickbdevaney/optime/optime-impact)

Something wrong with this skill or its page? Tell us.