robisson/build-like-amazon-agent-skills/spec-driven-implementation
Claude Code and agent skill by robisson/build-like-amazon-agent-skills
- community
- ext:[{"type":"hook","description":"Pre/post lifecycle hooks"}]
Checking that the SKILL.md file is still in the repository.
Bridge between an approved Design Document and code. Decompose the system-level blueprint into N vertical specs (requirements → design → tasks), each independently deliverable. Fail fast by ordering hardest-first. Execute wave-by-wave with approval gates.
Install
npx vskill@latest install robisson/build-like-amazon-agent-skills/spec-driven-implementationSemi-extensibleMentions customization, but needs skill-specific knowledge. Read the extensible skills standard
SKILL.md
The same SKILL.md was published earlier as robisson/build-like-amazon-agent-skills/spec-driven-implementation.
Spec-Driven Implementation
Overview
After a Design Document is approved by the Design Bar Raiser, you do NOT jump directly to code. Instead, you decompose the macro design into N vertical specs—each representing an independently deliverable unit of customer value. Each spec follows the Kiro IDE trio format:
This intermediate layer exists because macro designs are too coarse for implementation and too abstract for task tracking. A spec bridges the gap: it is precise enough to code against, small enough to deliver in 1–2 weeks, and traceable back to the approved design.
The flow:
Each spec is a complete vertical slice: from customer-facing behavior at the top to infrastructure at the bottom. No spec depends on "the rest being finished" to deliver observable value.
When to Use
Important: This skill is invoked as the final phase of the design command (/design), after the system Design Document is approved. It is NOT part of/build. By the time/buildstarts, all specs must already exist with approved requirements, design, and tasks.
- After the Design Document has been approved by the Design Bar Raiser
- Before
incremental-implementationbegins on any slice - When the approved design covers more than a single deployable unit of work
- When multiple engineers will work in parallel on different parts of the system
- When requirements need to be formalized into testable acceptance criteria
- As the last step of `/design` — creating the specs that
/buildwill execute
Do NOT use for:
- Trivial changes (< 2 hours of work)—go directly to implementation
- Bug fixes with clear root cause—use incremental-implementation directly
- Changes already covered by an existing spec
- Prototype/spike work (use
wb-test-and-iterateinstead)
Amazon Context
Flow Clarification: This skill is the LAST STEP of/design. The/designcommand sequence is: design-document → api-contract-first → threat-modeling → design-review → spec-driven-implementation. Once specs are created and approved here,/buildpicks them up and executes the tasks./builddoes NOT create specs — it only reads and executes them.
This skill is the bridge in Amazon's engineering workflow:
| Layer | Artifact | Scope | Audience | Approved By | |
|---|---|---|---|---|---|
| Macro | Design Document | System-level blueprint | All engineers, stakeholders | Design Bar Raiser | |
| Micro | Spec (trio) | Single vertical slice | Implementing engineer(s) | Tech Lead / Peer | |
| Execution | PR / Commit | Individual code change | Reviewer | Code Review Bar Raiser |
The Design Bar Raiser approved the macro—the overall architecture, trade-offs, cost model, and operational plan. Now you plan each slice at micro level before coding. This prevents:
- Implementation drift: Code diverges from the approved design because engineers interpret ambiguity differently
- Integration hell: Slices built in isolation don't compose correctly
- Missing edge cases: Requirements not formalized means edge cases discovered in production
- Parallelization failure: Without explicit dependency graphs, parallel work creates merge conflicts and rework
At Amazon, this maps to the practice of writing implementation plans after design approval but before sprint planning. The spec trio formalizes what many senior engineers do informally in their heads—making the reasoning explicit, reviewable, and traceable.
Template Enforcement (Non-Negotiable)
When generating spec artifacts, you MUST follow the templates EXACTLY:
- requirements.md → Copy structure from
skills/spec-driven-implementation/templates/requirements-template.md
- MUST have: Introduction, Glossary, Requirements sections
- Each requirement MUST have: User Story + Acceptance Criteria
- Acceptance Criteria MUST use EARS notation: "THE [Subject] SHALL [behavior]", "WHEN [condition] THE [Subject] SHALL [action]"
- MUST use modal verbs: SHALL, SHALL NOT, MUST, MAY
- Each criterion must be individually testable and referenceable (e.g., "1.3.a")
- design.md → Copy structure from
skills/spec-driven-implementation/templates/design-template.md
- MUST have: Overview, Architecture (with Mermaid diagrams), Components & Interfaces (with code signatures), Data Models, Error Handling, Properties (PBT), Testing Strategy, Security, Open Questions
- MUST include at least one Mermaid sequence diagram
- MUST reference requirements by number (traceability)
- tasks.md → Copy structure from
skills/spec-driven-implementation/templates/tasks-template.md
- MUST have: Legend, Phases with green-build gates, Tasks with sub-tasks
- Each task MUST have: size estimate (S/M/L/XL), traceability annotations (_Requirements: X.Y_, _Design: §N.N_, _Depends on: Task X.Y_), Wave assignment
- MUST end with Dependency Graph JSON showing waves
- MUST use status markers:
- [ ]pending,- [-]in progress,- [x]done,- [!]blocked
⛔ RED FLAG: If your spec output does NOT have these sections, STOP and redo it following the template. ⛔ RED FLAG: If your requirements don't use EARS notation (SHALL/WHEN/IF), STOP and rewrite them. ⛔ RED FLAG: If your tasks.md doesn't have a dependency graph with waves, STOP and add it.
The Process
1. Identify Vertical Slices from the Design Document
Read the approved Design Document and identify slices that:
| Criteria | Good Slice | Bad Slice | |
|---|---|---|---|
| Delivers observable value | User can see/use something new | Only adds internal plumbing | |
| Vertical completeness | API → Logic → Storage → Observability | Only a database migration | |
| Independent deployability | Works without other slices being done | Requires slice 3 to function | |
| Bounded scope | 1–2 weeks of implementation | Multi-month effort | |
| Testable in isolation | Has clear acceptance criteria | "Works when everything else works" |
Outputs: A numbered list of slices with one-line descriptions and estimated effort.
2. Order Slices by Risk, API First, and Dependency
Apply the hardest-first principle (fail fast), with API First as the dominant ordering rule:
- Tier 1 — Foundation: Infrastructure, schemas, control plane, shared interfaces that others depend on. Only present when an adopted pattern (e.g., cell-based) demands it, or when a one-way door decision (e.g., partition key) must be locked first.
- Tier 2 — API: The API spec(s) implementing the customer-value contract end-to-end (handler → logic → storage → observability for that API surface). The API is the only customer-facing contract. No client spec is created before the API it consumes is specified and frozen.
- Tier 3 — Clients: UI, CLI, SDK, MCP server, AI agent, partner integration, batch job — each is its own spec, built on the now-stable API. A "client" is anything that consumes an API; the word "frontend" is too narrow.
- Tier 4 — Hardening: Edge case handling, degraded modes, performance optimization, operational polish, documentation.
Within each tier, order by dependency: if Slice B imports from Slice A, A comes first.
API First — the non-negotiable ordering rule
API specs precede client specs. When a feature involves both an API and one or more clients (UI, CLI, SDK, MCP, AI agent, batch job, partner integration), the API spec is created and approved first. Client specs are created only after the API contract is stable. This is not negotiable — it prevents the client from leaking implementation assumptions into a not-yet-frozen API surface, and it keeps every client equivalent from the contract's point of view.
The API may be REST, gRPC, an event schema, a data contract, an MCP tool surface, or an agent tool definition. The protocol does not change the rule.
If you find yourself ordering a UI spec before its API spec, stop — you have inverted the dependency. The UI cannot exist without a stable API, and any work done before the API is stable will need to be redone when the API is finalized.
Rationale: If the hardest part is impossible or needs redesign, you discover that in week 1, not week 8. Two-way door decisions (reversible) can be reordered; one-way door decisions (schema migrations, public APIs, partition keys) are sequenced carefully — and almost always live in Tier 1 or Tier 2.
3. Create a Spec for Each Slice (The Trio)
⛔ MANDATORY HUMAN REVIEW GATES: Each artifact (requirements → design → tasks) has a mandatory pause for user review. Do NOT generate the next artifact until the previous one is explicitly approved by the user.
For each slice, create three files in .bla/specs/<slice-name>/:
3.1 requirements.md
Extract and formalize requirements for this slice only from the Design Document.
- Use the EARS (Easy Approach to Requirements Syntax) format
- Each requirement has a User Story and Acceptance Criteria
- Acceptance Criteria use SHALL/MUST/MAY with WHEN/IF/WHERE conditions
- Cross-reference the Design Document section that drives each requirement
Agent: Load agents/requirements-analyzer.md and apply the requirements-analyzer persona to review the requirements for:
- Logical inconsistencies across requirements
- Ambiguous terms ("fast", "large scale", "reasonable")
- Conflicting constraints
- Unstated assumptions
- Missing edge cases and boundary conditions
The agent asks clarifying questions with suggested fixes and updates the requirements.
🚦 GATE: Present requirements.md to the user. Ask: "Review these requirements. Anything missing, ambiguous, or wrong?" Wait for explicit approval. Do NOT generate design.md until requirements are approved.
3.2 design.md
Detailed technical design for this slice only:
- Architecture specific to this slice (Mermaid diagrams)
- Component interfaces with code signatures
- Data models (schema, types, validations)
- Error handling strategy (retry, circuit breaker, fallback)
- Dependency behavior inherited from the approved Design Document (classification, timeout/retry policy, circuit breakers, bulkheads, fallback behavior, observability)
- Feature flag behavior inherited from the approved Design Document (flag type, safe default, OFF behavior, kill switch behavior, rollout metrics, cleanup)
- Operational behavior inherited from the approved Design Document (customer experience metrics, service health metrics, dashboards, alarms, runbooks, severity expectations, operational burden)
- Properties for property-based testing (PBT)
- Testing strategy (unit, integration, contract)
- Security considerations specific to this slice
This is NOT a repeat of the macro design. It adds implementation detail: exact function signatures, error codes, retry policies, concurrency handling, dependency failure behavior, feature flag behavior, operational behavior, and test properties that the macro design intentionally omits. Specs must preserve dependency-management, feature-flag lifecycle, and operational-excellence decisions from the approved Design Document rather than rediscovering them during /build.
🚦 GATE: Present design.md to the user. Ask: "Review this design. Trade-offs make sense? Anything to adjust?" Wait for explicit approval. Do NOT generate tasks.md until design is approved.
3.3 tasks.md
Decompose the design into executable tasks:
This is the start of the file. Read the full SKILL.md on GitHub.
Security
- Security scanPassed, 95 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/spec-driven-implementation/SKILL.md
Popularity
- 7-day trend score
- 0
Not refreshed yet.
Extension points
hookPre/post lifecycle hooks
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/robisson/build-like-amazon-agent-skills/spec-driven-implementation)