sickn33/agentic-awesome-skills/ab-testing
Claude Code and agent skill by sickn33/agentic-awesome-skills
- community
- ext:[{"type":"hook","description":"Pre/post lifecycle hooks"}]
Checking that the SKILL.md file is still in the repository.
When the user wants to plan, design, or implement an A/B test or experiment, or build a growth experimentation program.
Install
npx vskill@latest install sickn33/agentic-awesome-skills/ab-testingSemi-extensibleMentions customization, but needs skill-specific knowledge. Read the extensible skills standard
SKILL.md
The same SKILL.md was published earlier as sickn33/agentic-awesome-skills/ab-testing.
A/B Test Setup
When to Use
Use to plan, design or implement a controlled experiment or experimentation program.
You are an expert in experimentation and A/B testing. Your goal is to help design tests that produce statistically valid, actionable results.
Initial Assessment
Check for product marketing context first: If .agents/product-marketing.md exists (or .claude/product-marketing.md, or the legacy product-marketing-context.md filename, in older setups), read it before asking questions. Use that context and only ask for information not already covered or specific to this task.
Before designing a test, understand:
- Test Context - What are you trying to improve? What change are you considering?
- Current State - Baseline conversion rate? Current traffic volume?
- Constraints - Technical complexity? Timeline? Tools available?
Core Principles
1. Start with a Hypothesis
- Not just "let's see what happens"
- Specific prediction of outcome
- Based on reasoning or data
2. Test One Thing
- A/B tests may compare a bundle, but then estimate the bundle's overall effect; individual component effects require a suitable factorial design
3. Statistical Rigor
- Pre-determine sample size
- Don't peek and stop early
- Commit to the methodology
4. Measure What Matters
- Primary metric tied to business value
- Secondary metrics for context
- Guardrail metrics to prevent harm
Hypothesis Framework
Structure
Example
Weak: "Changing the button color might increase clicks."
Strong: "Because users report difficulty finding the CTA (per heatmaps and feedback), we believe making the button larger and using contrasting color will increase CTA clicks by 15%+ for new visitors. We'll measure click-through rate from page view to signup start."
Test Types
| Type | Description | Traffic Needed | |
|---|---|---|---|
| A/B | Two versions, single change | Moderate | |
| A/B/n | Multiple variants | Higher | |
| MVT | Multiple changes in combinations | Very high | |
| Split URL | Different URLs for variants | Moderate |
Sample Size
Quick Reference
The root and reference tables previously gave inconsistent values. Calculate using a named method with recorded baseline, MDE units, alpha, power, sidedness, allocation and multiple-comparison adjustment; see the reference guide. Do not use unbound numeric shortcuts.
Calculators:
For detailed sample size tables and duration calculations: See references/sample-size-guide.md
Metrics Selection
Primary Metric
- Single metric that matters most
- Directly tied to hypothesis
- What you'll use to call the test
Secondary Metrics
- Support primary metric interpretation
- Explain why/how the change worked
Guardrail Metrics
- Things that shouldn't get worse
- Stop test if significantly negative
Example: Pricing Page Test
- Primary: Plan selection rate
- Secondary: Time on page, plan distribution
- Guardrail: Support tickets, refund rate
Designing Variants
What to Vary
| Category | Examples | |
|---|---|---|
| Headlines/Copy | Message angle, value prop, specificity, tone | |
| Visual Design | Layout, color, images, hierarchy | |
| CTA | Button copy, size, placement, number | |
| Content | Information included, order, amount, social proof |
Best Practices
- Single, meaningful change
- Bold enough to make a difference
- True to the hypothesis
Traffic Allocation
| Approach | Split | When to Use | |
|---|---|---|---|
| Standard | 50/50 | Default for A/B | |
| Conservative | 90/10, 80/20 | Limit risk of bad variant | |
| Ramping | Start small, increase | Technical risk mitigation |
Considerations:
- Consistency: Users see same variant on return
- Balanced exposure across time of day/week
Assignment and safety checks
Define stable randomization unit, eligibility/exposure, conversion window and intention-to-treat analysis before launch. Check sample-ratio mismatch, missing events, bot/internal traffic, contamination across devices and repeated-user dependence; broken instrumentation can invalidate significance. Predeclare segments/comparisons and separate exploratory findings. Monitor harmful technical/guardrail effects with a planned stop policy even during fixed-horizon tests. Sequential methods require their own valid stopping rules. Every variant must preserve accessibility, honest offers, consent/privacy and security. Testing does not authorize unrequested production rollout or data sharing.
Implementation
Client-Side
- JavaScript modifies page after load
- Quick to implement, can cause flicker
- Tools: PostHog, Optimizely, VWO
Server-Side
- Variant determined before render
- No flicker, requires dev work
- Tools: PostHog, LaunchDarkly, Split
Running the Test
Pre-Launch Checklist
- [ ] Hypothesis documented
- [ ] Primary metric defined
- [ ] Sample size calculated
- [ ] Variants implemented correctly
- [ ] Tracking verified
- [ ] QA completed on all variants
During the Test
DO:
- Monitor for technical issues
- Check segment quality
- Document external factors
Avoid:
- Peek at results and stop early
- Make changes to variants
- Add traffic from new sources
The Peeking Problem
Looking at results before reaching sample size and stopping early leads to false positives and wrong decisions. Pre-commit to sample size and trust the process.
Analyzing Results
Statistical Significance
- Predefine the inference method and alpha; p < 0.05 is not a probability that the result is random or the hypothesis is true
- Report effect size and a compatible interval; evaluate practical value and guardrails
Analysis Checklist
- Reach sample size? If not, result is preliminary
- Statistically significant? Check confidence intervals
- Effect size meaningful? Compare to MDE, project impact
- Secondary metrics consistent? Support the primary?
- Guardrail concerns? Anything get worse?
- Segment differences? Mobile vs. desktop? New vs. returning?
Interpreting Results
| Result | Conclusion | |
|---|---|---|
| Significant winner | Implement variant | |
| Significant loser | Keep control, learn why | |
| No significant difference | Inconclusive unless a planned equivalence/noninferiority analysis supports a bounded conclusion; do not extend opportunistically | |
| Mixed signals | Dig deeper, maybe segment |
Documentation
Document every test with:
- Hypothesis
- Variants (with screenshots)
- Results (sample, metrics, significance)
- Decision and learnings
For templates: See references/test-templates.md
Growth Experimentation Program
Individual tests are valuable. A continuous experimentation program is a compounding asset. This section covers how to run experiments as an ongoing growth engine, not just one-off tests.
The Experiment Loop
Hypothesis Generation
Feed your experiment backlog from multiple sources:
| Source | What to Look For | |
|---|---|---|
| Analytics | Drop-off points, low-converting pages, underperforming segments | |
| Customer research | Pain points, confusion, unmet expectations | |
| Competitor analysis | Features, messaging, or UX patterns they use that you don't | |
| Support tickets | Recurring questions or complaints about conversion flows | |
| Heatmaps/recordings | Where users hesitate, rage-click, or abandon | |
| Past experiments | "Significant loser" tests often reveal new angles to try |
ICE Prioritization
Score each hypothesis 1-10 on three dimensions:
| Dimension | Question | |
|---|---|---|
| Impact | If this works, how much will it move the primary metric? | |
| Confidence | How sure are we this will work? (Based on data, not gut.) | |
| Ease | How fast and cheap can we ship and measure this? |
ICE Score = (Impact + Confidence + Ease) / 3
Run highest-scoring experiments first. Re-score monthly as context changes.
Experiment Velocity
Track your experimentation rate as a leading indicator of growth:
| Metric | Target | |
|---|---|---|
| Experiments launched per month | 4-8 for most teams | |
| Win rate | 20-30% is common for mature programs (sustained higher rates may indicate conservative hypotheses) | |
| Average test duration | 2-4 weeks | |
| Backlog depth | 20+ hypotheses queued | |
| Cumulative lift | Compound gains from all winners |
The Experiment Playbook
When a test wins, don't just implement it — document the pattern:
Over time, your playbook becomes a library of proven growth patterns specific to your product and audience.
Experiment Cadence
Weekly (30 min): Review running experiments for technical issues and guardrail metrics. Don't call winners early — but do stop tests where guardrails are significantly negative.
Bi-weekly: Conclude completed experiments. Analyze results, update playbook, launch next experiment from backlog.
Monthly (1 hour): Review experiment velocity, win rate, cumulative lift. Replenish hypothesis backlog. Re-prioritize with ICE.
Quarterly: Audit the playbook. Which patterns have been applied broadly? Which winning patterns haven't been scaled yet? What areas of the funnel are under-tested?
Common Mistakes
Test Design
- Testing too small a change (undetectable)
- Testing too many things (can't isolate)
- No clear hypothesis
Execution
- Stopping early
- Changing things mid-test
- Not checking implementation
Analysis
- Ignoring confidence intervals
- Cherry-picking segments
- Over-interpreting inconclusive results
Task-Specific Questions
- What's your current conversion rate?
- How much traffic does this page get?
- What change are you considering and why?
- What's the smallest improvement worth detecting?
- What tools do you have for testing?
- Have you tested this area before?
Related Skills
- cro: For generating test ideas based on CRO principles
- analytics: For setting up test measurement
- copywriting: For creating variant copy
Limitations
- Use this skill only when the task clearly matches its upstream source and local project context.
- Verify commands, generated code, dependencies, credentials, and external service behavior before applying changes.
- Do not treat examples as a substitute for environment-specific tests, security review, or user approval for destructive or costly actions.
Security
- Security scanPassed, 100 of 100Pattern checks on the skill's files.
- Model reviewNot runA model review is scheduled for the next rescan.
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingplugins/agentic-awesome-skills/skills/ab-testing/SKILL.md
Popularity
- Repository stars
- 49,706
- Repository forks
- 7,192
- 7-day trend score
- 53
Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.
Extension points
hookPre/post lifecycle hooks
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/sickn33/agentic-awesome-skills/ab-testing)