Skill: Contractor Scorecard (#57)
Description
Evaluates contractor performance across a completed project using a structured scoring system. Rates quality, communication, timeliness, and budget adherence. Generates a hire/no-hire recommendation and a permanent record for future reference.
Inputs
- Contractor Name (required)
- Trade (required): GC / Plumber / Electrician / HVAC / Framer / Drywaller / Painter / Flooring / etc.
- Project Address (required)
- Project Dates (required): Start and end dates
- Contract Amount (required): Original contract price
- Final Amount Paid (required): What was actually paid including change orders
- Performance Notes (optional): Raw observations — can be detailed or rough notes
- Punch List Count (optional): Number of punch list items attributable to this contractor
- Would You Rehire? (optional): Owner's gut-check before scoring
Outputs
- Numeric score (0–100) across 4 dimensions
- Overall grade: A / B / C / D / F
- Hire/No-Hire recommendation with reasoning
- Contractor profile card (save to contractor database)
- Red flags summary (if any)
Scoring Dimensions
1. Quality of Work (30 points)
| Score | Criteria | |
|---|---|---|
| 28–30 | Zero punch list items, work exceeds expectation, no callbacks | |
| 22–27 | 1–3 minor punch list items, all fixed without issue | |
| 15–21 | Multiple punch list items (4–8), some required callbacks | |
| 8–14 | Significant rework required, code violations, or quality failures | |
| 0–7 | Major rework, failed inspection, or work was unacceptable |
2. Communication & Professionalism (25 points)
| Score | Criteria | |
|---|---|---|
| 23–25 | Responsive within hours, proactively updated, no surprises | |
| 18–22 | Usually responsive, communicated major issues in time | |
| 12–17 | Had to chase them, some surprises, communication gaps | |
| 6–11 | Hard to reach, left job without notice, poor follow-through | |
| 0–5 | Ghosted, lied, or created serious communication failures |
3. Schedule / Timeliness (25 points)
| Score | Criteria | |
|---|---|---|
| 23–25 | On time or early, delays they caused were minimal (<3 days) | |
| 18–22 | 3–7 day delay attributable to contractor | |
| 12–17 | 1–2 week delay attributable to contractor | |
| 6–11 | 2–4 week delay caused by contractor | |
| 0–5 | Abandoned project, caused major delays (4+ weeks), left mid-job |
4. Budget Adherence (20 points)
| Score | Criteria | |
|---|---|---|
| 18–20 | Final cost at or under contract amount | |
| 14–17 | 1–5% over contract (minor change orders, legitimate) | |
| 9–13 | 6–15% over contract (some questionable change orders) | |
| 4–8 | 16–30% over contract (scope creep, padding change orders) | |
| 0–3 | 30%+ over contract or contract disputes / incomplete work |
Overall Grade Scale
| Score | Grade | Hire Recommendation | |
|---|---|---|---|
| 90–100 | A+ | Strong hire — priority contractor, call first | |
| 80–89 | A | Hire — reliable, keep on shortlist | |
| 70–79 | B | Hire with oversight — good but watch | |
| 60–69 | C | Maybe — verify specific concerns before rehiring | |
| 50–59 | D | Do not hire — documented failures | |
| 0–49 | F | Blacklist — warn other investors |
Steps
Step 1: Collect Inputs
Gather all input data. If performance notes are rough/informal, extract key observations.
Step 2: Score Each Dimension
Apply the rubric above based on actual performance. Be honest — this record exists to protect future projects.
Step 3: Flag Red Flags
Automatically flag as Red Flags:
- Failed any inspection (code violation on their trade)
- Any instance of lying or misrepresentation
- Abandoned job mid-project
- Filed or threatened a lien
- Budget overrun > 20% without legitimate change order documentation
- Any criminal or legal issue during project
Step 4: Calculate Score and Grade
Sum all 4 dimensions. Apply grade and hire/no-hire recommendation.
Step 5: Output Contractor Profile Card
Example Prompt
Expected output: Quality 25/30, Communication 23/25, Timeliness 24/25, Budget 20/20 = 92/100, Grade A, Strong hire.
Scripts
scripts/contractor-db-schema.md— Notion/spreadsheet schema for storing contractor recordsscripts/score-aggregator.md— multi-project averaging logic for repeat contractors
Notes
- Score every contractor on every project. Memory fades. Records don't.
- Share scores with other trusted investors when asked — good contractors are a community resource.
- For Matt Hoover's flips: add to his contractor database after each project, flag his top-tier subs.
- Conditional hire means: "would use again but only for [specific scope]" or "only with extra oversight"
Security
- Security scanPassed, 100 of 100Pattern checks on the skill's files.
- Model reviewNot runA model review is scheduled for the next rescan.
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingcontractor-scorecard/SKILL.md
Popularity
- 7-day trend score
- 0
Not refreshed yet.
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/togorashi45/skills-directory/contractor-scorecard)