vstorm-co/production-stack-skills/production-deploy
Claude Code and agent skill by vstorm-co/production-stack-skills
- community
- ext:[{"type":"hook","description":"Pre/post lifecycle hooks"}]
Checking that the SKILL.md file is still in the repository.
Pre-deployment validation and release management — structured checklists for database migrations, environment variables, rollback plans, backward compatibility, and deployment strategies. Use this skill when the user mentions deploy, release, ship to prod, merge to main, CI/CD pipeline, or says /production deploy. Triggers on deployment-related discussions, release planning, or pre-release validation.
Install
npx vskill@latest install vstorm-co/production-stack-skills/production-deploySemi-extensibleMentions customization, but needs skill-specific knowledge. Read the extensible skills standard
SKILL.md
The same SKILL.md was published earlier as vstorm-co/production-stack-skills/production-deploy.
Production Deploy
This skill encodes the pre-deployment discipline that separates teams who ship confidently from teams who ship and pray. Every checklist item here exists because someone skipped it and caused an outage. The patterns are opinionated and battle-tested — this is not a deployment tutorial, it is a deployment gate.
If you cannot check every box, you are not ready to deploy. Partial deploys are how you get partial outages.
1. Pre-Deployment Checklist
Run through this before every production deploy. No exceptions, no shortcuts, no "we'll check it in staging." Print this out and check the boxes with a pen if that is what it takes.
Data Layer
- [ ] All migrations reviewed and classified (see Section 2)
- [ ] Rollback migration exists and has been tested against staging
- [ ] Database backup taken (or continuous WAL archiving confirmed active)
- [ ] Migrations tested against production-volume data on staging
- [ ] No migrations hold locks longer than 2 seconds (
SET lock_timeout = '2s') - [ ] Migration order is correct (dependencies between migrations verified)
Application Layer
- [ ] All new environment variables documented and set in production (see Section 3)
- [ ] Secrets rotated if required (API keys, tokens, certificates)
- [ ] Feature flags configured for any gradual rollout
- [ ] API changes are backward-compatible (see Section 6)
- [ ] No breaking changes to event schemas, message formats, or shared contracts
- [ ] Application starts successfully with production config on staging
Infrastructure
- [ ] Health check endpoints respond correctly (
/health/live,/health/ready) - [ ] Graceful shutdown tested — in-flight requests complete before process exits
- [ ] Resource limits set (CPU, memory) — no unbounded containers
- [ ] Autoscaling configured and tested (min/max instances, scale-up triggers)
- [ ] DNS/load balancer changes propagated (if applicable)
- [ ] TLS certificates valid and not expiring within 30 days
Observability
- [ ] Logs reaching the aggregator (CloudWatch, Datadog, Grafana Loki)
- [ ] Key metrics have alerts: error rate > threshold, latency p99 > SLA, pod restarts
- [ ] Distributed traces enabled and sampling rate appropriate for production
- [ ] Error budget reviewed — are we within SLO? If not, this deploy needs extra scrutiny
- [ ] Dashboard updated with new metrics if the deploy adds new endpoints or features
Rollback Readiness
- [ ] Rollback plan written and reviewed (see Section 5)
- [ ] Previous deployment artifact is available and verified (image tag, release SHA)
- [ ] Team knows who has deploy access and who is on-call
- [ ] Incident channel identified (Slack channel, PagerDuty service, phone tree)
- [ ] Estimated time to rollback documented (should be under 5 minutes)
Detection — find deploys that skip the checklist:
2. Migration Safety Review
Every migration must be classified before it ships. This is the single most important step in any deploy that touches the database. Get it wrong and you take the service down for every user, not just the ones using the new feature.
Classification
Additive (Safe) — Green Light
These migrations are safe for zero-downtime rolling deploys. Old code ignores the new structures.
- New tables
- New nullable columns (without defaults on large tables)
- New indexes (with
CONCURRENTLY) - New views
- New functions/procedures
Transformative (Risky) — Yellow Light
These require extra review, staging testing with production-volume data, and explicit sign-off. They can be done safely but the safe pattern is non-obvious.
- Column type changes (expand-contract)
- Data backfills on large tables (batch, not single UPDATE)
- Adding NOT NULL constraints (use NOT VALID + VALIDATE)
- Adding CHECK constraints on existing data
- Adding foreign keys on existing data
Destructive (Dangerous) — Red Light
REFUSE to deploy destructive migrations without explicit confirmation from the user. These are irreversible. Suggest a zero-downtime alternative first.
- Column drops
- Table drops
- Data deletion (DELETE/TRUNCATE)
- Column renames (breaks old code during rolling deploy)
- Type changes that narrow data (e.g., TEXT to VARCHAR(50))
Detection — find risky migrations before they ship:
Migration Lint with squawk
squawk catches unsafe migration patterns automatically. Add it to CI:
squawk catches: missing CONCURRENTLY on indexes, NOT NULL additions without defaults, missing lock_timeout, and more.
3. Environment Variable Validation
Missing environment variables are the #2 cause of deploy failures (after bad migrations). The fix is simple: validate everything at startup, fail fast with a clear error message.
Python — Pydantic BaseSettings
Node.js — envalid
Rules
- Every required env var must be validated at startup, not on first use
- Fail with a human-readable error: "Missing required environment variable: DATABASE_URL" — not a cryptic NoneType error 3 stack frames deep
- Document every env var in a
.env.examplefile committed to the repo - New env vars added in a PR MUST be set in production BEFORE the deploy, or have a safe default
- Never use
os.getenv("SECRET")without a fallback or validation — it silently returns None
Detection — find unvalidated env vars:
4. Deployment Strategies
Choose the right strategy for the risk level. There is no universal best — each has tradeoffs.
Rolling Update (Default for Stateless Services)
New instances start, pass health checks, and begin receiving traffic. Old instances drain and shut down. At any point during the deploy, both old and new code are running simultaneously.
This is the start of the file. Read the full SKILL.md on GitHub.
Security
- Security scanPassed, 95 of 100Pattern checks on the skill's files.
- Model reviewPassed
Quality evaluation
- Task evaluationNot runNo evaluation yet. Run one in Skill Studio.
Source
- SKILL.md in the repositoryCheckingskills/production-deploy/SKILL.md
Popularity
- Repository stars
- 26
- Repository forks
- 7
- 7-day trend score
- 16
Stars and forks are for the whole GitHub repository, not this skill alone. Not refreshed yet.
Extension points
hookPre/post lifecycle hooks
Works with
Any agent vskill installs to: 56 targets in all. These 39 have a page on this site.
- Claude Code
- Cursor
- GitHub Copilot
- Windsurf
- Codex
- Gemini CLI
- Cline
- Amp
- Roo Code
- Goose
- Continue
- Kilo Code
- Junie
- Trae
- OpenHands
- Qwen Code
- AI Agent
- Tabnine Chat
- Sourcegraph Cody
- Amazon Q
- Firebase Genkit
- Sweep
- Devin
- Phind
- Mentat
- Claude Desktop
- Aider
- GPT Pilot
- Plandex
- bolt.new
- v0
- Replit Agent
- Anse
- TypingMind
- BetterChatGPT
- LibreChat
- Warp AI
- Pieces
- Fig AI
Embed badge
[](https://verified-skill.com/skills/vstorm-co/production-stack-skills/production-deploy)